ML032340707
| ML032340707 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 06/16/2003 |
| From: | Operator Licensing and Human Performance Branch |
| To: | Duke Energy Corp |
| References | |
| 50-270/03-301, 50-369/03-301 | |
| Download: ML032340707 (22) | |
See also: IR 05000369/2003301
Text
Draft Submittal
MCGUIRE JUNE 2003 EXAM
50-36912003-301 AND
50-37012003-301
JUNE 16 - 30,2003
1.
Written Exam Sample outlines
I tS-401
PVVK SkWtxaminatlon Uutline
korm ts-4oi-az
Note: 1.
2.
Ensure that at least tw topics from every WA category are sampled within each tier of the F
not be less than two). Refer to Section D.1 .c Cor additional guidance reGardinn SRO sampli
The point total for each group and tier in the proposed outline must match that specified in tl
deviate by fl from that specified in the table based on NRC revisions. The final mexam r
5.
6.*
7.
The shaded areas are not applicable to the categopltier.
The genericaWAs in Tiers 1 and 2 shall be selected from Section 2 of the WA Catalog, b
system.-The SRO WAS must also be linked to 10 CFR 55.43 or an SRO-level learning obie
On the following pages, enter the WA numbers, a brief description of each topic, the topics'
and the point totals for each system and category.-
totals for each category in the table above; summarize ail the SRO-only knowledqe and nor
Use dwlicate Panes for RO and SRO-onlv exams.
.
..
2204 34
NUREG-1021, DraR Revision 9
~~
McGuire Sample Plan
Facility: McGuire
Date of Exam: 7/29/02
Exam Level: SRO
I
Abilities
I
17
Notes: 1. Ensure that at least two topics from every WA category are sampled within
each tier (i.e., the "Tier Totals" in each WA category shall not be less than two).
2 The point total for each group and tier in the proposed outline must match
that specified in the table. The final point total for each group and tier may
deviate by +I
from that specified in the table based on NRC revisions. The
final exam must total 100 points.
3 Select topics from many systems; avoid selecting more than two or three WA
topics from a given system unless they relate to plant-specific priorities.
4 Systemstevolutions within each group are identified on the associated outline
5 The shaded areas are not applicable to the category/tier.
6* The generic WAS in Tiers 1 and 2 shall be selected from Section 2 of the WA
Catalog, but the topics must be relevant to the applicable evolution or system.
7 On the following pages, enter the WA numbers, a brief description of each
topic, the topics' importance ratings for the SRO license level, and the point
totals for each system and category. WAS below 2.5 should be justified on
the basis of plant-specific priorities. Enter the tier totals for each category in
the table above.
Summary
For Official Use Only
24
16
3
I3
19
17
I
10
17
rotals
04/02/2003
McGuire Sample Plan
-
SRO Exam Vital Statistics
Source of Questions
NRC Exams
Utility Bank
New
Modified
Level of Knowledge
Memory
Comprehension
Analysis
Repeat of Audit Questions
ii 10 CFR 55.43 Cross References
Question
Sub Part (b)
1 SRO Only
5
2 SRO Only
5
3 SRO Only
5
4 SRO Only
5
5 SRO Only
5
6 SRO Only
5
7 SRO Only
5
8 SRO Only
1
9 SRO Only
3
10 SRO Only
4
11 SRO Only
2
0
0
0
-
0
0
0
0
-
0
0
0
i/
Summarv
For Official Use Only
04/02/2003
L-
s
'y
?
d