AmrenUE Cal/laway Plant PO Box 620 Fulton, MO 65251 August 14, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC-04879 W~AmerenUE Ladies and Gentlemen:
10 CFR 50.55a CALLAWAY PLANT UNION ELECTRIC CO.
DOCKET NUMBER 50483 REQUESTS FOR RELIEF REGARDING IMPLEMENTATION OF ASME SECTION XI APPENDIX VIII REOUIREMENTS Pursuant to 10 CFR 50.55(a)(3)(i), Union Electric Company (AmerenUE) hereby requests NRC approval of the attached requests for the second 10-year interval of Callaway's Inservice Inspection (ISI) Program.
The Code Edition(s) and Addenda applicable to Callaway for its second 10-year ISI interval are ASME Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," 1989 Edition, with no Addenda, and 1995 Edition with 1996 Addenda. The attached requests pertain to implementation of ASME Section XI Appendix VIII requirements, and are summarized as follows:
Relief Reguest ISI-27: Relief is requested from the qualification requirements of Supplements 2 and 10 of Appendix VIII (ASME Section XI, 1995 Edition, 1996 Addenda) to permit use of the industrys Performance Demonstration Initiative (PDI) program for implementation of the applicable qualification requirements associated with the examination of Class 1 pressure-retaining piping (safe-end) welds from the inside surface of the reactor pressure vessel (RPV). The alternate program proposed as Supplement 14 to Appendix VIII by the industry (approved by the ASME subcommittee on Nuclear Inservice Inspection) would be used for this purpose
- Relief Request ISI-28: Relief is requested from the test/detection specimen qualification requirements of Appendix VIII, Supplement 10 for supporting examination of dissimilar metal piping welds (i.e., for RPV 04A it subsidiwry of Amea Clporstran
ULNRC-04879 August 14, 2003 Page 2 piping welds examined from the inside surface of the RPV). The requested relief would allow use of alternative requirements that have been developed by the industry (to be implemented through the PDI program) and which are contained in a proposed revision to Supplement 10 (as approved by the ASME NDE subcommittee). A copy of the proposed revision to Supplement 10 is included as an enclosure with the relief request.
- Relief Request ISI-29: With regard to performance demonstration requirements pertaining to examination of RPV shell and head welds, relief from the requirements of Appendix VIII Supplement 4 is requested in order to use the PDI-recommended depth size requirement in lieu of the Supplement 4 requirement, consistent with that specified in 10 CFR 50.55a(b)(2)(xv)(C)(l).
Relief Request ISI-30: Relief is requested to allow use of a PDI-qualified procedure to complete the ultrasonic examination of the RPV vessel-to-flange weld from the vessel side of the weld in accordance with Appendix VIII Supplements 4 and 6 (as amended by 64 FR 51370 through 51400) in lieu of ASME Section V, Article 4 (as directed by ASME Section XI, 1989 Edition, Subsection IWA-2232).
Relief Request ISI-31: Relief is requested to use the alternative examination volume requirements of Code Case N-613-1 (Figures 1 and
- 2) and the alternative requirements of ASME Section XI, Appendix VIII (Supplement 7), in lieu of ASME Section XI Figure IWB-2500-7 and Section V (Article 4) requirements, for the performance of volumetric examinations of RPV nozzle-to-vessel welds (as required per IWB-2500-1 of the 1989 Edition of ASME Section XI).
Approval of all of these 10 CFR 50.55a requests is respectfully requested by March 1, 2004. For any questions you may have or more information that you may require, please contact David Shafer at (314) 554-3104, or Thomas Elwood at (314) 5544593.
Very truly yours, Keith D. Young Manager, Regulatory Affairs TBE/mlo Attachments
ULNRC-04879 August 13, 2003 Page 3 cc: U. S. Nuclear Regulatory Commission Original and 1 copy)
Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Mr. Thomas P. Gwynn Acting Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102
10CFR50.55a Request Number ISI-27 Proposed Alternative In Accordance with 10 CFR 50.55a(a)(3)(i)
-Alternative Provides Acceptable Level of Quality and Safety-
- 1. ASME Code Component(s) Affected Class 1 Pressure Retaining Piping Welds examined from the inside surface of Pressurized Water Reactors using procedures, personnel, and equipment qualified to ASME Section X, Appendix VIII, Supplement 2 or 10 criteria.
SAFE-END WELDS CODE CATEGORY B-F Code Description Weld No.
Item B5.10 Sfe-endto LoopA RPVnlet Nozzle 2-RV-302-121-A (Note 1)
B5.10 Safe-endto Loop A RPV OutletNozzle 2-RV-301-121-A (Note 1)
B5.10 Safe-endto Loop B RPV InletNozzle 2-RV-302-121-B B5.10 Safe-end to Loop B RPV Outlet Nozzle 2-RV-301-121-B B5.10 Safe-end to Loop C RPV Inlet Nozzle 2-RV-302-121-C B5.10 Safe-end to Loop C RPV Outlet Nozzle 2-RV-301-121-C B5.10 Safe-end to LoopD RPV Inlet Nozzle 2-RV-302-121-D (Note 1)
B5.10 Safe-end to Loop D RPV Outlet Nozzle 2-RV-301-121-D SAFE-END WELDS CODE CATEGORY B-J Code Description Weld No.
Item B9.11 ElbowtoLoopA RPV Inlet Safe-End Weld 2-BB-0l-F102 (Note 1)
B9.11 Pipeto LoopA RPV Outlet Safe-End Weld 2-BB-01-F103 (Note 1)
B9.11 Elbow to Loop B RPV Inlet Safe-End Weld 2-BB-01-F202 B9.11 Pipe to Loop B RPV Outlet Safe-End Weld 2-BB-01-F203 B9.11 Elbow to Loop C RPV Inlet Safe-End Weld 2-BB-01-F302 B9.11 Pipe to Loop C RPV Outlet Safe-End Weld 2-BB-01-F303 B9.11 Elbow to Loop D RPV Inlet Safe-End Weld 2-BB-01-F402 B9.11 Pipe to Loop D RPV Outlet Safe-EndWeld 2-BB-01-F403 Note 1: Welds noted are required to be examined per the ISI Program Plan. Due to V. C. Summer hot leg nozzle cracdng, it was decided by Callaway that all inlet and outlet nozzle-to-safe end welds and all inlet and outlet nozzle safe end-to-pipe welds (listed above) are to be examined during Refuel 13 (Spring 2004).
Page 1 of 8
10CFR50.55a Request Number ISI-27
2. Applicable Code Edition and Addenda
ASME Section A, "Rules for Inservice Inspection of Nuclear Power Plant Components," 1989 Edition, with no Addenda.
ASME Section X, 1995 Edition with 1996 Addenda.
- 3. A1nlicable Code Requirement Relief is requested from the qualification requirements contained in ASME Section XI, 1995 Edition with 1996 Addenda, Appendix VIII Supplement 2 and Supplement 10 as specified in Table VIII-3 110-1, for applicable piping welds.
4. Reason for Request
Callaway's reactor pressure vessel (RPV) nozzle to main coolant piping is fabricated using ferritic, austenitic, and cast stainless components and assembled using austenitic and dissimilar metal welds. These austenitic and dissimilar metal welds are in close proximity to each other, which means the same ultrasonic essential variables are used for each weld and the most challenging ultrasonic examination process is employed (e.g., the ultrasonic examination process associated with a dissimilar metal weld would be applied to a ferritic or austenitic weld).
With regard to qualification requirements for the inspection of such welds, separate qualifications to Supplements 2, 3, and 10 are redundant when done in accordance with the industry's Performance Demonstration Initiative (PDI) Program. For example, during a personnel qualification to the PDI Program, the candidate would be exposed to a minimum of 10 flawed grading units for each individual supplement. Personnel qualification to Supplements 2, 3, and 10 would therefore require a total of 30 flawed grading units. Test sets this large and tests of this duration are impractical. Additionally, a full procedure qualification (i.e. 3 personnel qualifications) to the PDI Program requirements would require 90 flawed grading units. This is particularly burdensome for a procedure that will use the same essential variables or the same criteria for selecting essential variables for all 3 supplements.
To resolve these issues, the PDI Program recognizes the Supplement 10 qualification as the most stringent and technically challenging ultrasonic application. The same essential variables are used for the examinations subject to the requirements of Supplements 2, 3, and 10. A coordinated add-on implementation would be sufficiently stringent for qualification to the requirements of Supplements 2 and 3 if the requirements used for qualification to Supplement 10 are satisfied as a prerequisite. The basis for this conclusion is the fact that the majority of the flaws addressed in Supplement 10 are located wholly in austenitic weld material. This configuration is known to be challenging for ultrasonic techniques due to the variable dendritic structure of the weld material.
Conversely, the flaws addressed in Supplements 2 and 3 initiate in fine-grained base materials.
Page 2 of 8
10CFR50.55a Request Number ISI-27 Additionally, use of the PDI program for implementation of Supplement 2 requirements in coordination with Supplement 10 implementation would be more stringent than current Code requirements for a detection and length sizing qualification. For example, the current Code would allow a detection procedure, personnel, and equipment to be qualified to Supplement 10 requirements with 5 flaws, Supplement 2 requirements with 5 flaws, and Supplement 3 requirements with 5 flaws, for a total of only 15 flaws. The proposed alternative of qualifying to Supplement 10 requirements using 10 flaws and adding on Supplement 2 requirements with 5 flaws and Supplement 3 requirements with 3 flaws results in a total of 18 flaws which will be multiplied by a factor of 3 for the procedure qualification.
Based on the above, the use of a limited number of Supplement 2 or 3 flaws is sufficient to assess the capabilities of procedures and personnel who have already satisfied Supplement 10 requirements. The statistical basis used for screening personnel and procedures is still maintained at the same level with competent personnel being successful and less skilled personnel being unsuccessful. The proposed alternative is consistent with other coordinated qualifications currently contained in Appendix VIII.
The proposed alternate program is attached and is identified as Supplement 14. It has been submitted to the ASME Code for consideration as new Supplement 14 to Appendix VIII and as of February 2002 has been approved by Subcommittee on Nuclear Inservice Inspection.
5. Proposed Alternative and Basis for Use
In lieu of the requirements of ASME Section XI, 1995 Edition, 1996 Addenda, Appendix VIII, Table VIII-3 110-1, the Performance Demonstration Initiative (PDI) Program for implementation of Appendix VIII, Supplement 2 in coordination with Supplement 10 implementation is desired to be used.* Pursuant to 10 CFR 50.55a(a)(3)(i), therefore, approval is requested to use the proposed alternative in lieu of the ASME Section XI, Appendix VIII, Supplement 2 and 10 requirements. As noted above, the PDI Program alternative is described in the attached.
For reasons stated in section 4 above, compliance with the proposed alternatives will provide an adequate level of quality and safety for examination of the affected welds.
- 6. Duration of Pronosed Alternative Duration of the second inservice inspection interval.
- See Callaway 10CFR50.55a Request ISI-28 regarding Supplement 10 implementation.
Page 3 of 8
10CFR50.55a Request Number ISI-27 SUPPLEMENT 14 - QUALIFICATION REQUIREMENTS FOR COORDINATED IMPLEMENTATION OF SUPPLEMENT 10, 2 AND 3 FOR PIPING EXAMINATIONS PERFORMED FROM THE INSIDE SURFACE Proposed Requirements Technical Basis 1.0 SCOPE This Supplement is applicable to wrought There is currently no available Code action austenitic, ferritic and dissimilar metal allowing for a coordinated implementation piping welds examined from the inside of the fundamental qualifications required surface. This Supplement provides for for the typical examinations performed expansion of Supplement 10 qualifications from the ID of PWR nozzles. Without this to permit coordinated qualification for Code Case/Change, qualifications would Supplements 2 and 3.
require an excessive amount of flawed and unflawed grading units. This proposed supplement uses the more technically stringent Supplement 10 qualification as a base and then incorporates a limited number of Supplement 2 and Supplement 3 samples. This proposal is consistent with the philosophy of Supplement 12, the proposed changes to Supplement 10, and the approved changes to Supplement 2 and 11.
2.0 SPECIMEN REQUIREMENTS Qualification test specimens shall meet the requirements listed herein, unless a set of specimens is designed to accommodate specific limitations stated in the scope of the examination procedure (e.g., pipe size, access limitations). The same specimens may be used to demonstrate both detection and sizing qualification.
2.General The specimen set shall conform to the following requirements.
(a) Specimens shall have sufficient volume to minimize spurious reflections that may interfere with the interpretation process.
(b) The specimen set shall include the Tolerances are from the applicable minimum and maximum pipe diameters and Supplements because Supplement 2 and 3 thicknesses for which the examination dimensions and tolerances are typically procedure is applicable. Applicable based on wrought nominal pipe size that is tolerances are provided in Supplements 2, 3, not appropriate for DM welds that are and 10.
typically associated with forged and machined safe ends.
(c)
The specimen set shall include Page 4 of 8
10CFR50.55a Reouest Number ISI-27 SUPPLEMENT 14 - QUALIFICATION REQUIREMENTS FOR COORDINATED IMPLEMENTATION OF SUPPLEMENT 10, 2 AND 3 FOR PIPING EXAMINATIONS PERFORMED FROM THE INSIDE SURFACE Proposed Requirements Technical Basis examples of the following fabrication conditions:
(1) geometric and material conditions that normally require discrimination from flaws (e.g., counterbore or weld root conditions, cladding, weld buttering, remnants of previous welds, adjacent welds in close proximity, and weld repair areas);
(2) typical limited scanning surface conditions (e.g., internal tapers, exposed weld roots, and cladding conditions).
2.2 Supplement 2 Flaws (a) At least 70% of the flaws shall be cracks, the remainder shall be alternative flaws.
(b) Specimens with IGSCC shall be used when available.
(c) Alternative flaws, if used, shall provide crack-like reflective characteristics and shall comply with the following:
(1) Alternative flaws shall be used only when implantation of cracks produces spurious reflectors that are uncharacteristic of service-induced flaws.
(2) Alternative flaws shall have a tip width of less than or equal to 0.002 in. (0.05 mm).
2.3 Supplement 3 Flaws Supplement 3 flaws shall be mechanical or thermal fatigue cracks.
2.4 Distribution Since the number of flaws will be limited The specimen set shall contain a words such as "uniform distribution" could representative distribution of flaws. Flawed lead to testmanship and are considered and unflawed grading units shall be inappropriate.
randomly mixed.
3.0 PERFORMANCE DEMONSTRATION Personnel and procedure performance demonstration tests shall be conducted according to the following requirements.
(a) The same essential variable values, or, when appropriate, the same critieria for selecting values as demonstrated in Supplement 10 shall be used.
Page 5 of 8
10CFR50.55a Renuest Number ISI-27 SUPPLEMENT 14-QUALIFICATION REQUIREMENTS FOR COORDINATED IMPLEMENTATION OF SUPPLEMENT 10, 2 AND 3 FOR PIPING EXAMINATIONS PERFORMED FROM THE INSIDE SURFACE Proposed Requirements Technical Basis (b) The flaw location and specimen identification shall be obscured to maintain a "blind test".
(c) All examinations shall be completed prior to grading the results and presenting the results to the candidate. Divulgence of particular specimen results or candidate viewing of unmasked specimens after the performance demonstration is prohibited.
3.1 Detection Test (a) The specimen set for Supplement 2 qualification shall include at least five flawed grading units and ten unflawed grading units in austenitic piping. A maximum of one flaw shall be oriented axially.
(b) The specimen set for Supplement 3 qualification shall include at least three flawed grading units and six unflawed grading units in ferritic piping. A maximum of one flaw shall be oriented axially.
(c) Specimens shall be divided into grading units.
(1) Each grading unit shall include at least 3 in. (76 mm) of weld length.
(2) The end of each flaw shall be separated from an unflawed grading unit by at least in. (25 mm) of unflawed material. A flaw may be less than 3 in. (76 mm) in length.
(3) The segment of weld length used in one grading unit shall not be used in another grading unit.
(4) Grading units need not be uniformly spaced around the pipe specimen.
(d) All grading units shall be correctly identified as being either flawed or unflawed.
3.2 Length-sizing Test (a) The coordinated implementation shall include the following requirements for personnel length sizing qualification.
(b) The specimen set for Supplement 2 Axial flaws are not length sized in Page 6 of 8
10CFR50.55a Reauest Number IS1-27 SUPPLEMENT 14 - QUALIFICATION REQUIREMENTS FOR COORDINATED IMPLEMENTATION OF SUPPLEMENT 10, 2 AND 3 FOR PIPING EXAMINATIONS PERFORMED FROM THE INSIDE SURFACE Proposed Requirements Technical Basis qualification shall include at least four flaws Supplement 2.
in austenitic material.
(c) The specimen set for Supplement 3 qualification shall include at least three flaws in ferritic material.
(d) Each reported circumferential flaw in the detection test shall be length sized. When only length-sizing is being tested, the regions of each specimen containing a flaw to be sized may be identified to the candidate. The candidate shall determine the length of the flaw in each region.
(e) Supplement 2 or Supplement 3 examination procedures, equipment, and personnel are qualified for length-sizing when the flaw lengths estimated by ultrasonics, as compared with the true lengths, do not exceed 0.75 in. (19 mm)
RMS, when they are combined with a successful Supplement 10 qualification.
3.3 Depth-sizing Test The coordinated implementation shall include the following requirements for personnel depth-sizing qualification.
(a) The specimen set for Supplement 2 Axial flaws are not depth sized in qualification shall include at least four Supplement 2.
circumferentially oriented flaws in austenitic material.
(b) The specimen set for Supplement 3 qualification shall include at least three flaws in ferritic material.
(c) For a separate depth-sizing test, the regions of each specimen containing a flaw to be sized may be identified to the candidate. The candidate shall determine the depth of the flaw in each region.
(d) Supplement 2 or Supplement 3 examination procedures, equipment, and personnel are qualified for depth-sizing when the flaw depths estimated by ultrasonics, as compared with the true depths, do not exceed 0.125 in. (3 mm)
Page 7 of 8
10CFR50.55a Request Number ISI-27 SUPPLEMENT 14 - QUALIFICATION REQUIREMENTS FOR COORDINATED IMPLEMENTATION OF SUPPLEMENT 10, 2 AND 3 FOR PIPING EXAMINATIONS PERFORMED FROM THE INSIDE SURFACE Proposed Requirements Technical Basis RMS, when they are combined with a successful Supplement 10 qualification.
4.0 PROCEDURE QUALIFICATION Procedure qualifications shall include the following additional requirements.
(a) The specimen set shall include the equivalent of at least three personnel performance demonstration test sets.
Successful personnel performance demonstrations may be combined to satisfy these requirements.
(b) Detectability of all flaws in the procedure qualification test set that are within the scope of the procedure shall be demonstrated. Length and depth sizing shall meet the requirements of 3.1, 3.2, and 3.3.
(c) At least one successful personnel demonstration shall be performed.
(d) To qualify new values of essential variables, at least one personnel performance demonstration is required. The acceptance criteria of 4.0(b) shall be met.
Page 8 of 8
10 CFR 50.55a Request Number ISI-28 Proposed Alternative In Accordance with 10 CFR 50.55a(a)(3)(i)
-Alternative Provides Acceptable Level of Quality and Safety--
- 1. ASME Code Component(s) Affected Class 1 Pressure Retaining Piping Welds examined from the inside surface of Pressurized Water Reactors using procedures, personnel, and equipment qualified to ASME Section XI, Appendix VIII, Supplement 10 criteria.
SAFE-END WELDS CODE CATEGORY B-F Code Description Weld No.
Item B5.10 Safe-end to Loop A RPV Inlet Nozzle 2-RV-302-121-A (Note 1)
B5.10 Safe-end to Loop A RPV Outlet Nozzle 2-RV-301-121-A (Note 1)
B5.10 Safe-end to Loop B RPV Inlet Nozzle 2-RV-302-121-B B5.10 Safe-end to Loop B RPV Outlet Nozzle 2-RV-301-121-B B5.10 Safe-end to Loop C RPV Inlet Nozzle 2-RV-302-121-C B5.10 Safe-end to Loop C RPV Outlet Nozzle 2-RV-301-121-C B5.10 Safe-end to LoopD RPV Inlet Nozzle 2-RV-302-121-D (Note 1)
B5.10 Safe-end to Loop D RPV Outlet Nozzle 2-RV-301-121-D Note 1: Weldsnotedarerequiredtobe examinedperthe ISI ProgramPlan. Dueto V. C. Summerhotleg nozzle cracking, it was decided by Callaway that all inlet and outlet nozzle-to-safe end welds and all inlet and outlet nozzle safe end-to-pipe welds (isted above) are to be examined during Refuel 13 (Spring 2004).
2. Applicable Code Edition and Addenda
ASME Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," 1989 Edition, with no Addenda.
ASME Section XI, 1995 Edition 1996 Addenda.
- 3. Aimlicable Code Requirement The following paragraphs or statements are from ASME Section Xl, Appendix VIII, Supplement 10 and identify the specific requirements that are addressed in this request for relief Item 1 - Paragraph 1.1(b) states in part - Pipe diameters within a range of 0.9 to 1.5 times a nominal diameter shall be considered equivalent.
Item 2 - Paragraph 1.I(d) states - All flaws in the specimen set shall be cracks.
Item 3 - Paragraph l.l(d)(l) states - At least 50% of the cracks shall be in austenitic material. At least 50% of the cracks in austenitic material shall be contained wholly in Page 1 of 7
10 CFR 50.55a Request Number ISI-28 weld or buttering material. At least 10% of the cracks shall be in ferritic material. The remainder of the cracks may be in either austenitic or ferritic material.
Item 4 - Paragraph 1.2(b) states in part - The number of unflawed grading units shall be at least twice the number of flawed grading units.
Item 5 - Paragraph 1.2(c)(1) and 1.3(c) state in part - At least 1/3 of the flaws, rounded to the next higher whole number, shall have depths between 10% and 30% of the nominal pipe wall thickness. Paragraph 1.4(b) distribution table requires 20% of the flaws to have depths between 10% and 30%.
Item 6 - Paragraph 2.0 first sentence states - The specimen inside surface and identification shall be concealed from the candidate.
Item 7 - Paragraph 2.2(b) states in part - The regions containing a flaw to be sized shall be identified to the candidate.
Item 8 - Paragraph 2.2(c) states in part - For a separate length sizing test, the regions of each specimen containing a flaw to be sized shall be identified to the candidate.
Item 9 - Paragraph 2.3(a) states - For the depth sizing test, 80% of the flaws shall be sized at a specific location on the surface of the specimen identified to the candidate.
Item 10 - Paragraph 2.3(b) states - For the remaining flaws, the regions of each specimen containing a flaw to be sized shall be identified to the candidate. The candidate shall determine the maximum depth of the flaw in each region.
Item 11 - Table VIII-S2-1 provides the false-call criteria when the number of unflawed grading units is at least twice the number of flawed grading units.
4. Reason for Request
Relief is requested to use the following alternative requirements for implementation of the above Appendix VIII, Supplement 10 requirements. The alternative requirements will be implemented through the PDI Program.
It is important to note that the industry has developed a proposed revision to Supplement 10, which includes the alternatives identified below, along with additional clarifications and enhancements.
A copy of the proposed revision is enclosed.
The proposed alternatives are highlighted in the enclosure where they may be viewed in context. The proposed revision has been submitted to the ASME for consideration and (as of September 2002) has been approved by the NDE Subgroup.
- 5. Pronosed Alternative and Basis for Use The following alternatives are proposed, wherein a proposed alternative is specified for each Appendix VIII item listed in Section 3 above.
Page 2 of 7
10 CFR 50.55a Request Number ISI-28 Item 1 - The proposed alternative to Paragraph 1. (b) states:
"The specimen set shall include the minimum and maximum pipe diameters and thicknesses for which the examination procedure is applicable. Pipe diameters within 1/2 in. (13 mm) of the nominal diameter shall be considered equivalent. Pipe diameters larger than 24 in. (610 mm) shall be considered to be flat. When a range of thicknesses is to be examined, a thickness tolerance of +25% is acceptable."
Technical Basis - The change in the minimum pipe diameter tolerance from 0.9 times the diameter to within 1/2 inch of the nominal diameter provides tolerances more in line with industry practice. Though the alternative is less stringent for small pipe diameters they typically have a thinner wall thickness than larger diameter piping.
A thinner wall thickness results in shorter sound path distances that reduce the detrimental effects of the curvature. This change maintains consistency between Supplement 10 and the recent revision to Supplement 2.
Item 2 - The proposed alternative to Paragraph 1. (d) states:
"At least 60% of the flaws shall be cracks, the remainder shall be alternative flaws.
Specimens with IGSCC shall be used when available. Alternative flaws, shall meet the following requirements:
(1) Alternative flaws, if used, shall provide crack-like reflective characteristics and shall only be used when implantation of cracks would produce spurious reflectors that are uncharacteristic of service-induced flaws.
(2) Alternative flaw mechanisms shall have a tip width no more than 0.002 in. (.05 mm).
Note, to avoid confusion the proposed alternative modifies instances of the term "cracks" or "cracking" to the term "flaws" because of the use of alternative flaw mechanisms."
Technical Basis - As illustrated below, implanting a crack requires excavation of the base material on at least one side of the flaw. While this may be satisfactory for ferritic materials, it does not produce a useable axial flaw in austenitic materials because the sound beam, which normally passes only through base material, must now travel through weld material on at least one side, producing an unrealistic flaw response. In addition, it is important to preserve the dendritic structure present in field welds that would otherwise be destroyed by the implantation process.
To resolve these issues, the proposed alternative allows the use of up to 40% fabricated flaws as an alternative flaw mechanism under controlled conditions.
The fabricated flaws are isostatically compressed which produces ultrasonic reflective characteristics similar to tight cracks.
Page 3 of 7
10 CFR 50.55a Request Number ISI-28 Item 3 - The proposed alternative to Paragraph 1.1(d)(1) states:
"At least 80% of the flaws shall be contained wholly in weld or buttering material. At least one and no more than 10% of the flaws shall be in ferritic base material. At least one and no more than 10% of the flaws shall be in austenitic base material."
Technical Basis - Under the current Code, as little as 25% of the flaws may be contained in austenitic weld or buttering material. Recent experience has indicated that flaws are most likely to be contained within the weld. The metallurgical structure of austenitic weld material is ultrasonically more challenging than either ferritic or austenitic base material. The proposed alternative is therefore more challenging than the current Code.
Item 4 - The proposed alternative to Paragraph 1.2(b) states:
"Personnel performance demonstration detection test sets shall be selected from Table VIII-S10-1. The number of unflawed grading units shall be at least 1-1/2 times the number of flawed grading units."
Technical Basis - Proposed Table VIII-SIO-1 provides a statistically based ratio between the number of unflawed grading units and the number of flawed grading units. The proposed alternative reduces the ratio to 1.5, thus reducing the number of test samples to a more reasonable number from the human factors perspective. However, the statistical basis used for screening personnel and procedures is still maintained at the same level with regard to competent personnel being successful and less skilled personnel being unsuccessful. The acceptance criteria for the statistical basis are in Table VIH-SIO-1.
Item 5 - The proposed alternative to the flaw distribution requirements of Paragraph 1.2(c)(1) (detection) and 1.3(c) (length) is to use the Paragraph 1.4(b) (depth) distribution table (see below) for all qualifications.
Flaw Depth Minimum
(% Wall Thickness)
Number of Flaws 10-30%
20%
3 1-60%
20%
61-100%
20%
Technical Basis - The proposed alternative uses the depth sizing distribution for both detection and depth sizing because it provides for a better distribution of flaw sizes within the test set. This distribution allows candidates to perform detection, length, and depth sizing demonstrations simultaneously utilizing the same test set. The requirement that at least 75% of the flaws shall be in the range of 10 to 60% of wall thickness provides an overall distribution tolerance yet the distribution uncertainty decreases the possibilities for testmanship that would be inherent to a uniform distribution. It must be noted that it is possible to achieve the same distribution utilizing the present requirements, but it is preferable to make the criteria consistent.
Page 4 of 7
10 CFR 50.55a Request Number ISI-28 Item 6 - The proposed alternative to Paragraph 2.0 first sentence states:
"For qualifications from the outside surface, the specimen inside surface and identification shall be concealed from the candidate.
When qualifications are performed from the inside surface, the flaw location and specimen identification shall be obscured to maintain a 'blind test.'"
Technical Basis - The current Code requires that the inside surface be concealed from the candidate. This makes qualifications conducted from the inside of the pipe (e.g., PWR nozzle to safe end welds) impractical. The proposed alternative differentiates between ID and OD scanning surfaces, requires that they be conducted separately, and requires that flaws be concealed from the candidate. This is consistent with the recent revision to Supplement 2.
Items 7 and 8 - The proposed alternatives to Paragraph 2.2(b) and 2.2(c) state:
"... containing a flaw to be sized may be identified to the candidate."
Technical Basis - The current Code requires that the regions of each specimen containing a flaw to be length sized shall be identified to the candidate.
The candidate shall determine the length of the flaw in each region. (Note that length and depth sizing use the term "regions," while detection uses the term "grading units." The two terms define different concepts and are not intended to be equal or interchangeable.)
To ensure security of the samples, the proposed alternative modifies the first "shalr to a "may" to allow the test administrator the option of not identifying specifically where a flaw is located. This is consistent with the recent revision to Supplement 2.
Items 9 and 10 - The proposed alternative to Paragraph 2.3(a) and 2.3(b) state:
"... regions of each specimen containing a flaw to be sized may be identified to the candidate."
Technical Basis - The current Code requires that a large number of flaws be sized at a specific location.
The proposed alternative changes the "shall" to a "may" which modifies this from a specific area to a more generalized region to ensure security of samples. This is consistent with the recent revision to Supplement 2. It also incorporates terminology from length sizing for additional clarity.
Item 11 - The proposed alternative modifies the acceptance criteria of Table VIII-S2-1 as follows:
Page 5 of 7
10 CFR 50.55a Request Number ISI-28 TABLE VIII-ST PERFORMANCE DEMONSTRATION DETECTION TEST ACCEPTANCE CRITERIA Detection Test False Call Test Acceptance Critera Acceptance Criteria No. of No. of Maximum Flawed Minimum Unflawed Number Grading Detection Grading of False Units Criteria Units Calls 1_
_~ ~
~
1.
7 6
14 1
e 7
16 2
9
-e 7
0 10 e
2-15 2
11 9
22-17 3-3 12 9
24-18 3
13 10 2-20 4-3 14 10 2 21 5-3 15 11 30- 23 5-3 16 12 3-24 17 12 3-26 6-4 18 13 6-27 4
19 13 3e-29 4
20 14 40 30 5
Technical Basis - The proposed alternative is identified as new Table S10-1 above. It was modified to reflect the reduced number of unflawed grading units and allowable false calls.
As a part of ongoing Code activities, Pacific Northwest National Laboratories (PNNL) has reviewed the statistical significance of these revisions and offered the revised Table S 10-1.
ALTERNATIVE EXAMINATION In lieu of the requirements of ASME Section XI, 1995 Edition, 1996 Addenda, Appendix VIII, Supplement 10, the proposed alternative shall be used. The proposed alternative is described in the enclosure.
Page 6 of 7
10 CFR 50.55a Request Number ISI-28 JUSTIFICATION FOR GRANTING RELIEF Pursuant to 10 CFR 50.5 5a(a)(3Xi), approval is requested to use the proposed alternatives described above in lieu of the ASME Section Xl, Appendix VIII, Supplement 10 requirements. Compliance with the proposed alternatives will provide an adequate level of quality and safety for examination of the affected welds.
- 6. Duration of Pronosed Alternative Duration of the second inservice inspection interval.
Page 7 of 7
10 CFR 50.55a Request Number ISI-28 SUPPLEMENT 10 - QUALIFICATION REQUIREMENTS FOR DISSIMILAR METAL PIPING WELDS Current Requirement Proposed Change Reasoning 1.0 SCOPE Supplement 10 is applicable to dissimilar A scope statement provides added clarity metal piping welds examined from either regarding the applicable range of each the inside or outside surface.
individual Supplement. The exclusion of Supplement 10 is not applicable to piping CRC provides consistency between welds containing supplemental corrosion Supplement 10 and the recent revision to resistant clad (CRC) applied to mitigate Supplement 2 (Reference BC 00-755).
Intergranular Stress Corrosion Cracking Note, an additional change identifying CRC (IGSCC).
as "in course of preparation" is being processed separately.
1.0 SPECIMEN REQUIREMENTS 2.0 SPECIMEN REQUIREMENTS Renumbered.
Qualification test specimens shall meet the Qualification test specimens shall meet the No Change.
requirements listed herein, unless a set of requirements listed herein, unless a set of specimens is designed to accommodate specimens is designed to accommodate specific limitations stated in the scope of specific limitations stated in the scope of the examination procedure (e.g., pipe size, the examination procedure (e.g., pipe size, weld joint configuration, access weld joint configuration, access limitations). The same specimens may be limitations). The same specimens may be used to demonstrate both detection and used to demonstrate both detection and sizing qualification.
sizing qualification.
1.1 General. The specimen set shall 2.1 General.
Renumbered.
conform to the following requirements.
The specimen set shall conform to the following requirements.
(a) The minimum number of flaws in a New. Changed minimum number of flaws specimen set shall be ten.
to 10 so sample set size for detection is consistent with length and depth sizing.
(a) Specimens shall have sufficient volume (b) Specimens shall have sufficient volume Renumbered.
Page 1 of 15 Enclosure
10 CFR 50.55a Request Number ISI-28 SUPPLEMENT 10 - QUALIFICATION REQUIREMENTS FOR DISSIMILAR METAL PIPING WELDS Current Requirement Proposed Change Reasoning to minimize spurious reflections that may to minimize spurious reflections that may interfere with the interpretation process.
interfere with the interpretation process.
(b) The specimen set shall include the (c) The specimen set shall include the Renumbered and metrified. The change in minimum and maximum pipe diameters and minimum and maximum pipe diameters and pipe diameter tolerance provides thicknesses for which the examination thicknesses for which the examination consistency between Supplement 10 and the procedure is applicable. Pipe diameters procedure is applicable. Pipe diameters recent revision to Supplement 2 (Reference within a range of 0.9 to 1.5 times a nominal within 1/2 in. (13 mm) of the nominal BC 00-755).
diameter shall be considered equivalent.
diameter shall be considered equivalent.
Pipe diameters larger than 24 in. shall be Pipe diameters larger than 24 in. (610 mm) considered to be flat. When a range of shall be considered to be flat. When a range thicknesses is to be examined, a thickness of thicknesses is to be examined, a tolerance of +25% is acceptable.
thickness tolerance of +25% is acceptable.
(c) The specimen set shall include examples (d) The specimen set shall include Renumbered, and changed "condition" to of the following fabrication condition:
examples of the following fabrication "conditions."
conditions:
(1) geometric conditions that normally (1) geometric and material conditions that Clarified, since some of the items listed require discrimination from flaws (e.g.,
normally require discrimination from flaws relate to material conditions rather than counterbore or weld root conditions, (e.g., counterbore or weld root conditions, geometric conditions. Weld repair areas cladding, weld buttering, remnants of cladding, weld buttering, remnants of were added as a result of recent field previous welds, adjacent welds in close previous welds, adjacent welds in close experiences.
proximity);
proximity, weld repair areas);
(2) typical limited scanning surface (2) typical limited scanning surface Differentiates between ID and OD scanning conditions (e.g., diametrical shrink, single-conditions shall be included as follows:
surface limitations. Requires that ID and side access due to nozzle and safe end (a) for outside surface examination, weld OD qualifications be conducted external tapers).
crowns, diametrical shrink, single-side independently. [Note: new paragraph 2.0 access due to nozzle and safe end external (identical to old paragraph 1.0) provides for tapers alternatives when "a set of specimens is Page 2 of 15 Enclosure
II 10 CFR 50.55a Request Number ISI-28 SUPPLEMENT 10 - QUALIFICATION REQUIREMENTS FOR DISSIMILAR METAL PIPING WELDS Current Requirement Proposed Change Reasoning (b) for inside surface examination, designed to accommodate specific internal tapers, exposed weld roots, and limitations stated in the scope of the cladding conditions for inside surface examination procedure."].
examinations).
(e) Qualification requirements shall be satisfied separately for outside surface and inside surface examinations.
(d) All flaws in the specimen set shall be Deleted this requirement, because new cracks.
paragraph 2.3 below provides for the use of "alternative flaws" in lieu of cracks.
(1) At least 50% of the cracks shall be in 2.2 Flaw Location.
Renumbered and re-titled. Flaw location austenitic material. At least 50% of the At least 80% of the flaws shall be percentages redistributed because field cracks in austenitic material shall be contained wholly in weld or buttering experience indicates that flaws contained in contained wholly in weld or buttering material. At least one and no more than weld or buttering material are probable and material. At least 10% of the cracks shall be 10% of the flaws shall be in ferritic base represent the more stringent ultrasonic in ferritic material. The remainder of the material. At least one and no more than detection scenario.
cracks may be in either austenitic or ferritic 10% of the flaws shall be in austenitic material.
base material.
(2) At least 50% of the cracks in austenitic 2.3 Flaw Type.
Renumbered and re-titled. Alternative base material shall be either IGSCC or (a) At least 60% of the flaws shall be flaws are required for placing axial flaws in thermal fatigue cracks. At least 50% of the cracks, and the remainder shall be the HAZ of the weld and other areas where cracks in ferritic material shall be alternative flaws. Specimens with implantation of a crack produces mechanically or thermally induced fatigue IGSCC shall be used when available.
metallurgical conditions that result in an cracks.
Alternative flaws shall meet the following unrealistic ultrasonic response. This is requirements:
consistent with the recent revision to (1) Alternative flaws, if used, shall Supplement 2 (Reference BC 00-755).
provide crack-like reflective Page 3 of 15 Enclosure
I 10 CFR 50.55a Request Number ISI-28 SUPPLEMENT 10 - QUALIFICATION REQUIREMENTS FOR DISSIMILAR METAL PIPING WELDS Current Requirement Proposed Change Reasoning characteristics and shall only be used The 40% limit on alternative flaws is when implantation of cracks would needed to support the requirement for up to produce spurious reflectors that are 70% axial flaws. Metrified.
uncharacteristic of service-induced flaws.
(2) Alternative flaws shall have a tip width no more than 0.002 in. (.05 mm).
(3) At least 50% of the cracks shall be (b) At least 50% of the flaws shall be Renumbered. Due to inclusion of coincident with areas described in (c) coincident with areas described in 2.1(d)
"alternative flaws," use of "cracks" is no above.
above.
longer appropriate.
2.4 Flaw Depth.
Created new paragraph 2.4 which consists All flaw depths shall be greater than 10% of of requirements removed from old the nominal pipe wall thickness.
Flaw paragraph 1.3(c) and 1.4, and re-titled.
depths shall exceed the nominal clad Flaw depths table from 1.4 used for thickness when placed in cladding. Flaws consistency between detection (old in the sample set shall be distributed as paragraph 1.3 (c)) and sizing specimen set follows:
(old paragraph 1.4 (b)) requirements.
Flaw Depth Minimum
(% Wall Thickness) Number of Flaws 10-30%
20%
31-60%
20%
61-100%
20%
At least 75% of the flaws shall be in the range of 10 to 60% of wall thickness.
I A
Page 4 of 15 Enclosure
10 CFR 50.55a Request Number ISI-28 SUPPLEMENT 10 - QUALIFICATION REQUIREMENTS FOR DISSIMILAR METAL PIPING WELDS Current Requirement Proposed Change Reasoning 1.2 Detection Specimens. The specimen set Renumbered, re-titled, and moved to shall include detection specimens that meet paragraph 3.1(a). No other changes.
the following requirements.
(a) Specimens shall be divided into grading Renumbered to paragraph 3.1(a)(1). No units. Each grading unit shall include at other changes.
least 3 in. of weld length. If a grading unit is designed to be unflawed, at least in. of unflawed material shall exist on either side of the grading unit. The segment of weld length used in one grading unit shall not be used in another grading unit. Grading units need not be uniformly spaced around the pipe specimen.
(b) Detection sets shall be selected from Moved to new paragraph 3.1 (aX2).
Table VIII-S2-1. The number of unflawed grading units shall be at least twice the number of flawed grading units.
(c) Flawed grading units shall meet the Flaw depth requirements moved to new following criteria for flaw
- depth, paragraph 2.4. Flaw orientation orientation, and type.
requirements moved to new paragraph 2.5.
Flaw type requirements moved to new paragraph 2.3, "Flaw Type."
(1) All flaw depths shall be greater than Deleted. For consistency in sample sets the 10% of the nominal pipe wall thickness. At depth distribution is the same for detection least 1/3 of the flaws, rounded to the next and sizing.
higher whole number, shall have depths between 10% and 30% of the nominal pipe Page 5 of 15 Enclosure
A.
10 CFR 50.55a Request Number ISI-28 SUPPLEMENT 10- QUALIFICATION REQUIREMENTS FOR DISSIMILAR METAL PIPING WELDS Current Requirement Proposed Change Reasoning wall thickness. However, flaw depths shall exceed the nominal clad thickness when placed in cladding.
At least 1/3 of the flaws, rounded to the next whole number, shall have depths greater than 30% of the nominal pipe wall thickness.
(2) At least 30% and no more than 70% of 2.5 Flaw Orientation.
Note that this distribution is applicable for the flaws, rounded to the next higher whole (a) For other than sizing specimens at least detection and depth sizing. Paragraph number, shall be oriented axially. The 30% and no more than 70% of the flaws, 2.5(b)(1) requires that all length-sizing remainder of the flaws shall be oriented rounded to the next higher whole number, flaws be oriented circumferentially.
circumferentially.
shall be oriented axially. The remainder of the flaws shall be oriented circumferentially.
1.3 Length Sizing Specimens. The Renumbered, re-titled, and moved to new specimen set shall include length sizing paragraph 3.2.
specimens that meet the following requirements.
(a) All length sizing flaws shall be oriented Moved, and included in new paragraph circumferentially.
3.2(a).
(b) The minimum number of flaws shall be Moved, and included in new paragraph 2.1 ten.
above.
(c) All flaw depths shall be greater than Moved, and included in new paragraph 2.4 10% of the nominal pipe wall thickness. At above after revision for consistency with least 1/3 of the flaws, rounded to the next detection distribution.
higher whole number, shall have depths between 10% and 30% of the nominal pipe wall thickness. However, flaw depth shall Page 6 of 15 Enclosure
10 CFR 50.55a Request Number ISI-28 SUPPLEMENT 10 - QUALIFICATION REQUIREMENTS FOR DISSIMILAR METAL PIPING WELDS Current Requirement Proposed Change Reasoning exceed the nominal clad thickness when placed in cladding. At least 1/3 of the flaws, rounded to the next whole number, shall have depths greater than 30% of the nominal pipe wall thickness.
1.4 Depth Sizing Specimens. The Moved, included in new paragraphs 2.1, specimen set shall include depth sizing 2.3, 2.4 specimens that meet the following requirements.
(a) The minimum number of flaws shall be Moved, included in new paragraph 2.1 ten.
(b) Flaws in the sample set shall not be Moved. Potential conflict with old wholly contained within cladding and shall paragraph 1.2(c)(1); "However, flaw depths be distributed as follows:
shall exceed the nominal clad thickness when placed in cladding.". Revised for clarity and included in new paragraph 2.4.
Page 7 of 15 Enclosure
0 10 CFR 50.55a Request Number ISI-28 SUPPLEMENT 10- QUALIFICATION REQUIREMENTS FOR DISSIMILAR METAL PIPING WELDS Current Requirement Proposed Change Reasoning Moved, and included in paragraph 2.4 for Flaw Depth Minimum consistent applicability to detection and
(°/ Wall Thickness)
Number of Flaws sizing samples.
10-30%
20%
31-60%
20%
61-100%
20%
The remaining flaws shall be in any of the above categories.
(b) Sizing Specimen sets shall meet the Added for clarity.
following requirements.
(1) Length-sizing flaws shall be oriented Moved from old paragraph 1.3(a).
circumferentially.
(2) Depth sizing flaws shall be oriented as Included for clarity. Previously addressed in 2.5(a).
by omission (i.e., length, but not depth, had a specific exclusionary statement).
2.0 CONDUCT OF 3.0 PERFORMANCE Renumbered.
PERFORMANCE DEMONSTRATION DEMONSTRATION The specimen inside surface and Personnel and procedure performance Differentiate between qualifications identification shall be concealed from the demonstration tests shall be conducted conducted from the outside and inside candidate. All examinations shall be according to the following requirements.
surface.
completed prior to grading the results and (a) For qualifications from the outside presenting the results to the candidate.
surface, the specimen inside surface and Divulgence of particular specimen results or identification shall be concealed from the candidate viewing of unmasked specimens candidate. When qualifications are after the performance demonstration is performed from the inside surface, the prohibited.
flaw location and specimen identification Page 8 of 15 Enclosure
10 CFR 50.55a Request Number ISI-28 SUPPLEMENT 10 - QUALIFICATION REQUIREMENTS FOR DISSIMILAR METAL PIPING WELDS Current Requirement Proposed Change Reasoning shall be obscured to maintain a "blind test". All examinations shall be completed prior to grading the results and presenting the results to the candidate. Divulgence of particular specimen results or candidate viewing of unmasked specimens after the performance demonstration is prohibited.
2.1 Detection Test. Flawed and unflawed 3.1 Detection Test.
Renumbered, and moved text to paragraph grading units shall be randomly mixed
- 3. l(a)(3).
(a) The specimen set shall include detection Renumbered, and moved from old specimens that meet the following paragraph 1.2.
requirements.
(1) Specimens shall be divided into grading Renumbered, and moved from old units.
paragraph 1.2(a). Metrified. No other (a) Each grading unit shall include at least 3 changes.
in. (76 mm) of weld length.
(b)The end of each flaw shall be separated from an unflawed grading unit by at least 1 in. (25 mm) of unflawed material. A flaw may be less than 3 in. in length.
(c) The segment of weld length used in one grading unit shall not be used in another grading unit.
(d) Grading units need not be uniformly spaced around the pipe specimen.
Page 9 of 15 Enclosure
10 CFR 50.55a Request Number ISI-28 SUPPLEMENT 10 - QUALIFICATION REQUIREMENTS FOR DISSIMILAR METAL PIPING WELDS Current Requirement Proposed Change Reasoning (2) Personnel performance demonstration Moved from old paragraph 1.2(b). Table detection test sets shall be selected from revised to reflect a change in the minimum Table VIII-S10-1. The number of unflawed sample set to 10 and the application of grading units shall be at least 1-1/2 times equivalent statistical false call parameters to the number of flawed grading units.
the reduction in unflawed grading units.
Human factors due to large sample size.
(3) Flawed and unflawed grading units shall Moved from old paragraph 2.1.
be randomly mixed.
(b) Examination equipment and personnel Moved from old paragraph 3.1. Modified are qualified for detection when personnel to reflect the 100% detection acceptance demonstrations satisfy the acceptance criteria of procedures versus personnel and criteria of Table VHII S10-1 for both equipment contained in new paragraph 4.0 detection and false calls.
and the use of l.5X rather than 2X unflawed grading units contained in new paragraph 3.1(a)(2). Note, the modified table maintains the screening criteria of the original Table VIII-S2-l.
2.2 Length Sizing Test 3.2 Length Sizing Test Renumbered.
(a) The length sizing test may be conducted (a) Each reported circumferential flaw in Provides consistency between Supplement separately or in conjunction with the the detection test shall be length-sized.
10 and the recent revision to Supplement 2 detection test.
(Reference BC 00-755).
I Page 10 of 15 Enclosure
10 CFR 50.55a Request Number ISI-28 SUPPLEMENT 10 - QUALIFICATION REQUIREMENTS FOR DISSIMILAR METAL PIPING WELDS Current Requirement Proposed Change Reasoning (b) When the length-sizing test is conducted Change made to ensure security of samples, (b) When the length sizing test is conducted in conjunction with the detection test, and consistent with the recent revision to in conjunction with the detection test, and less than ten circumferential flaws are Supplement 2 (Reference BC 00-755).
less than ten circumferential flaws are detected, additional specimens shall be detected, additional specimens shall be provided to the candidate such that at least Note that length and depth sizing use the provided to the candidate such that at least ten flaws are sized. The regions containing term "regions" while detection uses the ten flaws are sized. The regions containing a flaw to be sized may be identified to the term "grading units." The two terms define a flaw to be sized shall be identified to the candidate. The candidate shall determine different concepts and are not intended to candidate.
The candidate shall determine the length of the flaw in each region.
be equal or interchangeable.
the length of the flaw in each region.
(c) For a separate length-sizing test, the Change made to ensure security of samples, (c) For a separate length sizing test, the regions of each specimen containing a flaw consistent with the recent revision to regions of each specimen containing a flaw to be sized may be identified to the Supplement 2 (Reference BC 00-755).
to be sized shall be identified to the candidate. The candidate shall determine candidate.
The candidate shall determine the length of the flaw in each region.
the length of the flaw in each region.
(d) Examination procedures, equipment, Moved from old paragraph 3.2(a). Included and personnel are qualified for length-sizing "when" as an editorial change. Metrified.
when the RMS error of the flaw length measurements, as compared to the true flaw lengths, do not exceed 0.75 in. (19 mm).
3.3 Depth Sizing Test Renumbered.
2.3 Depth Sizing Test (a) For the depth sizing test, 80% of the (a) The depth-sizing test may be Change made to ensure security of samples, flaws shall be sized at a specific location on conducted separately or in conjunction consistent with the recent revision to the surface of the specimen identified to the with the detection test. For a separate Supplement 2 (Reference BC 00-755).
candidate.
depth-sizing test, the regions of each Page 11 of 15 Enclosure
P 10 CFR 50.55a Request Number ISI-28 SUPPLEMENT 10 - QUALIFICATION REQUIREMENTS FOR DISSIMILAR METAL PIPING WELDS Current Requirement Proposed Change Reasoning specimen containing a flaw to be sized may be identified to the candidate. The candidate shall determine the maximum depth of the flaw in each region.
(b) For the remaining flaws, the regions of (b) When the depth-sizing test is Change made to be consistent with the each specimen containing a flaw to be sized conducted in conjunction with the recent revision to Supplement 2 (Reference shall be identified to the candidate.
The detection test, and less than ten flaws are BC 00-755).
candidate shall determine the maximum detected, additional specimens shall be depth of the flaw in each region.
provided to the candidate such that at Changes made to ensure security of least ten flaws are sized. The regions of samples, consistent with the recent revision each specimen containing a flaw to be sized to Supplement 2 (Reference BC 00-755).
may be identified to the candidate. The candidate shall determine the maximum depth of the flaw in each region.
(c) Examination procedures, equipment, Moved from old paragraph 3.2(b).
and personnel are qualified for depth sizing Metrified.
when the RMS error of the flaw depth measurements, as compared to the true flaw depths, do not exceed 0.125 in. (3 mm).
3.0 ACCEPTANCE CRITERIA Delete as a separate category. Moved to new paragraph detection (3.1) and sizing 3.2 and 3.3.
3.1 Detection Acceptance Criteria.
Moved to new paragraph 3.1(b), reference Examination procedures, equipment, and changed to Table SI0 from S2 because of personnel are qualified for detection when the change in the minimum number of flaws the results of the performance and the reduction in unflawed grading units demonstration satisfy the acceptance from 2Xto 1.5X Page 12 of 15 Enclosure
10 CFR 50.55a Request Number ISI-28 SUPPLEMENT 10 - QUALIFICATION REQUIREMENTS FOR DISSIMILAR METAL PIPING WELDS Current Requirement Proposed Change Reasoning criteria of Table VIII-S2-1 for both detection and false calls.
3.2 Sizing Acceptance Criteria Deleted as a separate category. Moved to new paragraph on length 3.2 and depth 3.3.
(a) Examination procedures, equipment, Moved to new paragraph 3.2(d), and and personnel are qualified for length sizing included word "when" as an editorial the RMS error of the flaw length change.
measurements, as compared to the true flaw lengths, is less than or equal to 0.75 inch.
(b) Examination procedures, equipment, Moved to new paragraph 3.3(c).
and personnel are qualified for depth sizing when the RMS error of the flaw depth measurements, as compared to the true flaw depths, is less than or equal to 0.125 in.
D___________
4.0 PROCEDURE QUALIFICATION New.
Procedure qualifications shall include the New. Based on experience gained in following additional requirements.
conducting qualifications, the equivalent of (a) The specimen set shall include the 3 personnel sets (i.e., a minimum of 30 equivalent of at least three personnel flaws) is required to provide enough flaws-performance demonstration test sets.
to adequately test the capabilities of the Successful personnel performance procedure. Combining successful demonstrations may be combined to demonstrations allows a variety of satisfy these requirements.
examiners to be used to qualify the (b) Detectability of all flaws in the procedure. Detectability of each flaw procedure qualification test set that are within the scope of the procedure is within the scope of the procedure shall be required to ensure acceptable personnel demonstrated. Length and depth sizing pass rate. The last sentence is equivalent to Page 13 of 15 Enclosure
10 CFR 50.55a Request Number ISI-28 SUPPLEMENT 10 - QUALIFICATION REQUIREMENTS FOR DISSIMILAR METAL PIPING WELDS Current Requirement Proposed Change Reasoning shall meet the requirements of paragraph the previous requirements and is 3.1, 3.2, and 3.3.
satisfactory for expanding the essential (c) At least one successful personnel variables of a previously qualified demonstration shall be performed.
procedure.
(d) To qualify new values of essential variables, at least one personnel qualification set is required. The acceptance criteria of 4.0(b) shall be met.
Page 14 of 15 Enclosure
10 CFR 50.55a Request Number ISI-28
~10 TABLE VIII-SZ-1 PERFORMANCE DEMONSTRAT ON DETECTION TEST ACCEPTANCE CRITERIA Detection Test False Call Test Acceptance Critera Acceptance Criteria No. of No. of Maximum Flawed Minimum Unflawed Number Grading Detection Grading of False Units Criteria Units Calls 5
5 100 u
7 A
8 7
16 2
9 7
10 2
10 8
2-15 3
2 11 9
2-17 3-3 12 9
2-18 3
13 10 26-20 4-3 14 10 28-21 5-3 15 11 30- 23 5-3 16 12 3-24 4
17 12 34-26 6-4 18 13 36-27 7-4 19 13 3029 7
4 20 14 0
30 5
Page 15 of 15 Enclosure
10 CFR 50.55a Request Number ISI-29 Proposed Alternative In Accordance with 10 CFR 50.55a(a)(3)(i)
-- Alternative Provides Acceptable Level of Quality and Safety--
- 1. ASME Code Comnonent(s) Affected ASME Section XI, Class 1, Examination Category B-A, Item no. B1. 10 longitudinal and circumferential shell welds and B 1.20 head welds subject to Appendix VIII, Supplement 4 examinations.
SHELL WELDS CODE CATEGORY B-A Code Description Weld No.
Item Bl.11 Circumferential Vessel Shell Weld 2-RV-103-121 Bl.11 Circumferential Vessel Shell Weld 2-RV-101-171 B1.12 Itermediate Shell Longitudinal Weld 2-RV-101-124A B1.12 Intermediate Shell Longitudinal Weld 2-RV-101-124B B1.12 Intermediate Shell Longitudinal Weld 2-RV-101-124C B1.12 Lower Shell Longitudinal Weld 2-RV-10-142A B1.12 Lower Shell Longitudinal Weld 2-RV-101-142B B1.12 Lower Shell Longitudinal Weld 2-RV-101-142C B1.12 Upper Shell Longitudinal Weld 2-RV-101-122A B1.12 Upper Shell Longitudinal Weld 2-RV-101-122B B1.12 Upper Shell Longitudinal Weld 2-RV-101-122C B1.21 Lower Torus to Shell Weld 2-RV-101-141 B1.21 Lower Torus to Dollar Plate Weld 2-RV-102-151 B1.22 00 Meridional Weld in Lower Torus 2-RV-101-154A B1.22 900 Meridional Welds in Lower Torus 2-RV-101-154B B1.22 180° Meridional Welds in Lower Torus 2-RV-101-154C B1.22 2700 Meridional Welds in Lower Torus 2-RV-101-154D B1.30 Flange to Vessel Weld 2-RV-101-121
- 2. Anlicable Code Edition and Addenda ASME Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," 1989 Edition, with no Addenda.
ASME Section X, 1995 Edition 1996 Addenda.
3. Applicable Code Requirement
ASME Section Xl, 1995 Edition with 1996 Addenda, Appendix VIII Supplement 4, subparagraph 3.2(c).
Page 1 of 2
10 CFR 50.55a Request Number ISI-29
- 4. Reason for Reguest Supplement 4, Subparagraph 3.2(c), imposes three statistical parameters for depth sizing.
The first parameter, 3.2(c)(1), pertains to the slope of a linear regression line. The linear regression line is the difference between measured versus true value plotted along a through-wall thickness. For Supplement 4 performance demonstrations, a linear regression line of the data is not applicable because the performance demonstrations are performed on test specimens with flaws located in the inner 15 percent through-wall.
The differences between measured versus true value produce a tight grouping of results, which resemble a shotgun pattern. The slope of a regression line from such data is extremely sensitive to small variations, thus making the parameter of Subparagraph 3.2(c)(1) a poor and inappropriate acceptance criterion. The second parameter, 3.2(c)(2),
pertains to the mean deviation of flaw depth. The value used in the Code is too lax with respect to evaluating flaw depths within the inner 15 percent of wall thickness.
Therefore, PDI proposes to use the more appropriate criterion of 0.15-inch RMS of 10 CFR 50.55a(b)(2)(xv)(C)(1), which modifies Subparagraph 3.2(a), as the acceptance criterion. The third parameter, 3.2(cX3), pertains to a correlation coefficient. The value of the correlation coefficient in Subparagraph 3.2(c)(3) is inappropriate for this application since it is based on the linear regression from Subparagraph 3.2(c)(1).
- 5. Pronosed Alternative and Basis for Use Callaway proposes to use the depth size requirement of 0.15-inch RMS consistent with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a(b)(2)(xv)(C)(l) in lieu of the requirements contained in Section Xl, Appendix VIII, Supplement 4, Subparagraph 3.2(c), of ASME Code.
Based on the above, the proposed alternative will provide an equivalent level of quality and safety.
- 6. Duration of Pronosed Alternative Duration of the second inservice inspection interval.
Page 2 of 2
10 CFR 50.55a Request Number ISI-30 Proposed Alternative In Accordance with 10 CFR 50.55a(a)(3)(i)
-Alternative Provides Acceptable Level of Quality and Safety--
- 1. ASME Code Comnonent(s) Affected ASME Category B-A Pressure Retaining Welds In Reactor Pressure Vessel (RPV), Item No. B 1.30 upper shell to flange weld from flange Inside Diameter (ID).
Weld No.: 2-RV-101-121
- 2. Anplicable Code Edition and Addenda
- ASME Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," 1989 Edition, with no Addenda.
ASME Section XI, 1995 Edition 1996 Addenda.
3. Applicable Code Requirement
ASME Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components,"
1989 Edition, No Addenda, Subsection lWA-2232, requires UT examination of the RPV-to-flange weld to be in accordance with ASME Code,Section V, Article 4. In addition, Regulatory Guide (RG) 1.150, Revision 1, ltrasonic Testing of Reactor Vessel Welds during Preservice and Inservice Examinations," serves as regulatory guidance for the UT examination of RPV welds. Relief is requested for Callaway Plant for the second 10-year interval ISI scheduled for the April 2004 refueling outage.
4. Reason for Request
Callaway is required to perform inservice examination of the RPV flange weld in accordance with the requirements of ASME Section V Article 4 and the subsequent guideline requirements of Regulatory Guide 1.150 Rev 1.
Federal Register Notice 64 FR 51370 through 51400, dated September 22, 1999, revised the 1999 Edition of 10 CFR 50.55(a) Codes and Standards. This revision requires that ASME Section XI, Appendix VIII, Supplement 4, "Qualification Requirements For The Clad/Base Metal Interface of Reactor Vessel," and Supplement 6, "Qualification Requirements For Reactor Vessel Welds Other Than Clad/Base Metal Interface," be implemented for most of the RPV welds by Nov 22, 2000. The RPV vessel-to-flange weld is the only RPV circumferential weld not included in Appendix VIII.
This relief is requested to allow the use of a PDI qualified procedure to complete the UT examination of the RPV vessel to-flange weld from the vessel side of the weld in accordance with ASME Section XI, Div. 1, 1995 Edition with 1996 Addenda, Appendix VIII Supplement 4 and 6 as amended by the Federal Register Notice 64 FR 51370 through 51400, dated September 22, 1999 in lieu of ASME Section V, Article 4.
Page 1 of 4
10 CFR 50.55a Request Number ISI-30 S. Proposed Alternative and Basis for Use During the upcoming ten (10) year RPV weld examinations, Callaway will be employing personnel, procedures and equipment that are demonstrated and qualified by a Performance Demonstration Initiative (PDI) and in accordance with ASME Section XI, Div. 1, 1995 Edition with 1996 Addenda, Appendix VIII, Supplements 4 and 6 as amended by the Federal Register Notice 64 FR 51370 through 51400, dated September 22, 1999 for applicable RPV welds.
The remote examinations will be performed using the Westinghouse SUPREEM Robot and the Paragon UT data acquisition system in accordance with a PDI qualified procedure. The Westinghouse procedure PDI-ISI-254, "Remote Inservice Examination of Reactor Vessel Shell Welds," in accordance with ASME Section XI, Appendix VI, Supplements 4 and 6, was demonstrated at the PDI qualification session in 2001 (Performance Demonstration Qualification Sheet (PDQS) No. 407). The procedure complies with ASME Section X, Appendix Vm, 1995 Edition with 1996 Addenda as modified by the final rule.
Appendix VIII was developed to ensure the effectiveness of UT examinations within the nuclear industry by means of a rigorous, item-specific performance demonstration. The performance demonstration was conducted on a RPV mockup containing flaws of various sizes and locations. The demonstration established the capability of equipment, procedures, and personnel to find flaws that could be detrimental to the integrity of the RPV.
Although Appendix VIII is not a requirement for this weld, the qualification process to Appendix VIII criteria demonstrates that the examination and evaluation techniques are equal to or surpass the requirements of paragraph IWA-2232, "Ultrasonic Examination,"
of Section XI of the ASME Code and the guidance in RG 1.150.
A comparison between the ASME Code,Section V, Article 4 based UT methods and the procedures developed to satisfy the PDIlAppendix VIII can be best described as a comparison between a compliance-based procedure (ASME Code,Section V, Article 4) and a results-based procedure (PDI Appendix VIII). ASME Code,Section V procedures use an amplitude-based technique and a known reflector. The proposed alternate UT method was established independently from the acceptance standards for flaw size found in ASME Code,Section X.
The PDI qualified sizing method is considered more accurate than the method used in ASME Code,Section V, Article 4. The proposed alternate UT examination technique provides an acceptable level of quality and examination repeatability as compared to the Article 4 requirements.
The PDI Program's PDQS No. 407 attests that Westinghouse procedure PDI-ISI-254 is in compliance with the detection and sizing tolerance requirements of Appendix VIII. The PDI qualification method is based on a group of samples, which validate the acceptable flaw sizes in ASME Section Xl. The sensitivity to detect these flaws is considered to be Page 2 of 4
10 CFR 50.55a Request Number ISI-30 equal to or greater than the sensitivity obtained through ASME Section V Article 4 because the Westinghouse procedure PDI-ISI-254 relies on a smaller scan index and a higher scan sensitivity for the detection of the UT signals.
The examination and sizing procedure uses echo-dynamic motion and tip diffraction characteristics of the flaw instead of the amplitude characteristics required by ASME Code,Section V, Article 4. The search units interrogate the same examination volume as depicted by ASME Code,Section XI, Figure IWB 2500-4, "Shell-to-Flange Weld Joint."
The use of procedures for satisfying the requirements of ASME Code,Section V, Article 4 for the UT examination of the RPV-to-flange weld from the vessel shell has not received the same qualifications as a PDI qualified procedure.
The PDI qualification specimens are curved vessel shell plate sections and do not have taper transition geometry. However, the procedure is used to examine reactor vessel shell welds which have taper transitions at weld joints of dissimilar thickness. The PDI qualification for Supplements 4 and 6 allows for examination of material thickness up to 12.3 inches or a metal path distance of 17.5 inches in the case of the 45 degree transducer. This qualified test range bounds a significant percentage of the flange-to-shell weld examination volume even in the thicker portion above the weld centerline.
Callaway's RPV flange-to-shell weld was examined during pre-service by remote automated inspection in accordance with Section XI. The pre-service examination was performed from the vessel ID surface, using Section XI techniques at 0 degree longitudinal and 45 and 60 degree shear beam angles. Examination from the flange surface was performed using 0, 8, and 19 degree longitudinal. For inservice examinations, during the first interval the weld examination from flange surface was performed in accordance with Section XI using 0, 6, 12 and 16 degree longitudinal. The weld ID surface examination was performed using 45 and 60 degree shear wave, and 45/0 degree longitudinal beam angles by remote automated inspection in accordance with Section XI and Regulatory Guide (RG) 1.150 Revision 1. No matters of concern were identified during the aforementioned examinations.
The use of Appendix VIII Supplements 4 and 6 for the completion of the RPV vessel-to-flange weld from the shell side (which PDI has qualified) is expected to reduce examination time, which translates to reduced personnel radiation exposure.
Additionally, this relief would allow a smooth transition to the welds adjacent to the RPV circumferential and longitudinal welds (welds B 1.11 and B 1.12) which do require an examination in accordance with Appendix VIII, Supplements 4 and 6. This would eliminate the need to switch to the different calibrations, procedure, and technique required by ASME Code,Section V, Article 4 and Regulatory Guide 1.150, Rev 1. This would result in a reduction in transition time to the different calibration, procedure, and technique required which translates to reduced personnel radiation exposure and is more cost effective.
Page 3 of 4
10 CFR 50.55a Request Number ISI-30 Alternate Examinations The automated shell-to-flange weld examinations shall be performed using a qualified procedure in accordance with ASME Code, Section Xl, Div. 1, 1995 Edition with 1996 Addenda, Appendix VIII, Supplements 4 and 6 as amended by the Federal Register Notice 64FR 51370 through 51400, dated September 22, 1999.
The Appendix VIII criteria were developed to ensure the effectiveness of UT examinations within the nuclear industry by means of a rigorous, item-specific performance demonstration. The performance demonstration was conducted on RPV mockups containing flaws of various sizes and locations. The demonstration established the capability of equipment, procedures, and personnel to find flaws that could be detrimental to the integrity of the RPV. The performance demonstration showed that the proposed UT technique is equal to or surpasses the requirements of the Code and the recommendations of RG 1.150. Therefore, there is reasonable assurance that the proposed alternative provides an acceptable level of quality and safety.
6. Duration of Proposed Alternative
Duration of the second inservice inspection interval.
7. Precedents
The NRC has granted similar relief to Salem Generating Station, Unit I (Reference 1),
and Comanche Peak Steam Electric Station, Unit 2 (Reference 2).
- 8. References
- 1) Letter from J. Clifford (NRC) to H W. Keiser (PSEG Nuclear) dated May 3, 2001;
Subject:
Salem Nuclear Generating Station, Unit No. 1-Relief from ASME Code Requirements Related to the Inservice Inspection Program, Second 10-Year Interval, Relief Request RR-B1 1 (TAC No. MB 1234)
- 2) Letter from Robert A. Gramm to C. Lance Terry (JXU Generation Company) dated April 16, 2002;
Subject:
Comanche Peak Steam Electric Station (CPSES), Unit-2, Re:
First 10-Year Inservice Inspection (ISI) Interval Request for Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) concerning Relief Requests A-4, Revision 1; A-5, Revision 2; A-6, A-7 and A-8 (TAC NO. MB3039)
Page 4 of 4
10 CFR 50.55a Request Number ISI-31 Proposed Alternative In Accordance with 10 CFR 50.55a(a)(3)(i)
-Alternative Provides Acceptable Level of Quality and Safety-
- 1. ASME Code Component(s) Affected Class 1 Reactor Pressure Vessel Pressure-retaining Nozzle-to-Vessel welds.
NOZZLE WELDS CODE CATEGORY B-D Code Description Weld No.
Item B3.90 Loop A Outlet Nozzle to Vessel Weld 2-RV-107-121-A B3.90 Loop A Inlet Nozzle to Vessel Weld 2-RV-105-121-A B3.90 Loop B Inlet Nozzle to Vessel Weld 2-RV-105-121-B B3.90 Loop B Outlet Nozzle Vessel Weld 2-RV-107-121-B B3.90 Loop C Outlet Nozzle to Vessel Weld 2-RV-107-121-C B3.90 Loop C Inlet Nozzle to Vessel Weld 2-RV-105-121-C B3.90 Loop D Inlet Nozzle to Vessel Weld 2-RV-105-121-D B3.90 Loop D Outlet to Vessel Weld 2-RV-107-121-D
- 2. Annlicable Code Edition and Addenda ASME Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," 1989 Edition, with no Addenda.
ASME Section XI, 1995 Edition 1996 Addenda.
- 3. Annlicable Code Reguirement ASME Section XI, 1989 Edition, Examination Category B-D Full Penetration Welds of Nozzles in Vessels, Code Item B3.90, Figure IWB-2500-7 (a) & (b).
ASME Section V, 1989 Edition, Article 4, Paragraphs T-441.3.2.5, Angle Beam Scanning; T-3.2.6, Scanningfor Reflectors Oriented Parallel to the Weld; and T-441.3.2.7, Scanningfor Reflectors Oriented Transverse to the Weld.
4. Reason for Request
Inservice examination of selected welds is currently performed in accordance with the requirements of 10 CFR 50.55a, the plant Technical Specifications, and the 1989 Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section X1, "Rules for In-Service Inspection of Nuclear Power Plant Components." This Code edition invokes the examination requirements of Appendix I, Article 1-2000 which refers to ASME Section V, Article 4. These requirements essentially prescribe 20-year old examination methodology.
The required examination volume for the reactor vessel pressure retaining nozzle-to-Page 1 of 2
A 10 CFR 50.55a Request Number ISI-31 vessel welds extends far beyond the weld into the base metal, and is unnecessarily large.
This extends the examination time significantly and results in no net increase in safety, since the area in question is a base metal region which is not prone to in-service cracking and was extensively examined before the vessel was put into service and during the first inspection interval examination.
5. Proposed Alternative and Basis for Use
Relief is requested to use the alternative requirements of Code Case N-613-1 Figures 1 and 2 for examination volume, and the requirements of ASME Section Xl, Div. 1, 1995 Edition, 1996 Addenda, Appendix VIII Supplement 7 in lieu of the requirements of ASME Section XI Figures IWB-2500-7(a) and IWB-2500-7(b) and ASME Section V, Article 4, for the performance of the required volumetric examinations as specified in Table IWB-2500-1, Category B-D, of the 1989 Edition of ASME Section XI. These examinations will be performed during the second inspection interval.
The required examinations will be performed using procedures qualified in accordance with ASME Code,Section XI, Div. 1, 1995 Edition, 1996 Addenda, Appendix VIII Supplement 7. This will provide added assurance that the reactor vessel welds have remained free of service-related flaws, thus enhancing quality and ensuring plant safety and reliability.
Code Case N-613-I reduces the examination volume next to the widest part of the weld from half of the vessel wall thickness to one-half (1/2) inch. This removes from examination the base metal that was extensively examined during construction and preservice inspection and is not in the high residual stress region associated with the weld. Cracks, should they initiate, occur in the high-stress areas of the weld. These high-stress areas are contained in the volume that is defined by Code Case N-613-I and are thus subject to examination.
The implementation of Code Case N-613-1 is also expected to reduce on-vessel examination time by as much as 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, resulting in significant dose and cost savings.
ALTERNATIVE EXAMINATIONS:
- 1)
Perform examinations in accordance with Code Case N-61 3-1.
- 2)
Perform examinations in accordance with ASME Code,Section X, Div. 1, 1995 Edition, 1996 Addenda, Appendix VIII Supplement 7.
- 6. Duration of Pronosed Alternative Duration of the second inservice inspection interval.
Page 2 of 2