FENOC Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077 L-03-121 August 7, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50412, License No. NPF-73 hMonthly Overating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of July, 2003.

RespectfullJr W. Pearce _ _

- - XX -- Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office King of Prussia, PA aZd'

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE August 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: Jutv 2003 (1) Reason (2) Method A - Equipment Failure (Explain) I - Manual 8 - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trip Scram D - Regulatory Restriction 4 - Continuation E - Operator Training I Ucense Examination - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% ouput for the entire month.

-w

OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: 311S UNIT 61 REPORT DATEs 08/01/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 e -t * * -* * * * - - - - - -.

la. REPORTING PERIOD: JULY 2003

  • Notes: Rated thermal power at *
  • BVPS-1 was uprated from 2652 MWt*
1. DESIGN ELECTRICAL RATING (Net MWe): 835
  • to 2689 MWt on 10/20/01. Met
  • MDC was also uprated from 2.-- WI. DEPENDABLE CAPACITY -Net-MWala
  • 810_j- to 82!ae.

3 __ '

  • aaaa a at**
  • _* a
  • __
  • _ a a THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5087.0 238871.0
3. NO. OF EBS. REACTOR WAS CRITICAL: 744.0 3786.5 164378.0
4. SERVICE HOURS GENERATOR ON LINE: 744.0 3739.9 161851.9
5. UNIT RESERVE SHUTDOWN HOURSs 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (KH): 618520.0 2938309.0 121594316.0
7. GROSS ELECT. ENERGY GEN. (KWH): 654650.0 3122697.0 129792287.0
8. GROSS THERNAL ENERGY GEN. (KWH)s 1998416.0 9530273.0 399801582.5
9. UNIT AVAILABILITY FACTOR () 100.0 73.5 69.2
10. UNIT CAPACITY FACTOR (XMC) (%): - 101.3 70.4 64.6
11. UNIT FORCED OUTAGE RATE (b)s 0.0 1.5 15.4

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE August 1,2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: JuIv 2003 No. Date Type Duration Reason Method of Cause / Corrective Actions (YAMID) F Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE.

(1)Reason (2)Method A - Equipment Failure (Explain) 1 - manual B - Maintenance or Test 2 - Manual TdpI Scram C- Refueling 3 - Automatic Tdp I Scram D- Regulatory RestrIction 4 - ContInuation E - Operator Training / icense Examination 5 - Other (Explain)

F -Administrative G-Operational Error (Explain)

H -Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% ouput for the entire month.

_ H

~ ~_

_ , _. , .111- .

_ ~~ ~ ~ -b - _~1 wo "

OPERATING DATA REPORT DOCKET NO0 2 50-412 UNIT NAME: JYPS UNIT 62 REPORT DATE: 08/01/03 COMPLETED EYs DAVID T. JONES

,.; TELEPHONE 1(724) 682-4962

  • ** *
  • 0 0 *0*0*0**** *
  • REPORTING PERIODS JULY 2003
  • Noten2 Rated thermal power at
  • 2n.
  • BVPS-2 was uprated from 2652 aWt SESIGN ELECTRICAL RATING (Net xwe)2 836
  • to 2689 Xut on 10/30/01. Net
  • 1.
  • MDC was also uprated from
  • 2.- IX=. -DEPEND1=LE CAPACITY4Net EWe) 2---831 - - 120 _tafe-to 831l _ *

, 0 * *

  • 0 * * * ** * * **
  • THIS MONTH YEAR TO DATE CUMULaTXVE 3a. HOURS IN REPORTING PERIOD: 744.0 5087.0 137654.0
3. nO. OF EPS. REACTOR =AS CRITICAL: 744.0 5087.0 114642.1
4. SERVICE HOURS GENERATOR ON LINE: 744.0 5087.0 113913.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (KWH): 617505.0 4250052.0 89432455.0
7. GROSS ELECT. ENERGY GEN. (MMW), 649959.0 4468585.0 94500630.0
8. GROSS THERMAL ENERGY GEN. (KWA) t 1997943.0 13577191.0 288176802.0
9. UNIT AVAILABILITY FACTOR (%)t 100.0 100.0 82.8
10. UNIT CAPACITY FACTOR (MDC) (%): 99.9 100.5 78.0
11. UNIT FORCED OUTAGE RATE (%)t 0.0 0.0 9.4 owww".

Text

FENOC Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077 L-03-121 August 7, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50412, License No. NPF-73 hMonthly Overating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of July, 2003.

RespectfullJr W. Pearce _ _

- - XX -- Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office King of Prussia, PA aZd'

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE August 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: Jutv 2003 (1) Reason (2) Method A - Equipment Failure (Explain) I - Manual 8 - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trip Scram D - Regulatory Restriction 4 - Continuation E - Operator Training I Ucense Examination - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% ouput for the entire month.

-w

OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: 311S UNIT 61 REPORT DATEs 08/01/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 e -t * * -* * * * - - - - - -.

la. REPORTING PERIOD: JULY 2003

  • Notes: Rated thermal power at *
  • BVPS-1 was uprated from 2652 MWt*
1. DESIGN ELECTRICAL RATING (Net MWe): 835
  • to 2689 MWt on 10/20/01. Met
  • MDC was also uprated from 2.-- WI. DEPENDABLE CAPACITY -Net-MWala
  • 810_j- to 82!ae.

3 __ '

  • aaaa a at**
  • _* a
  • __
  • _ a a THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5087.0 238871.0
3. NO. OF EBS. REACTOR WAS CRITICAL: 744.0 3786.5 164378.0
4. SERVICE HOURS GENERATOR ON LINE: 744.0 3739.9 161851.9
5. UNIT RESERVE SHUTDOWN HOURSs 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (KH): 618520.0 2938309.0 121594316.0
7. GROSS ELECT. ENERGY GEN. (KWH): 654650.0 3122697.0 129792287.0
8. GROSS THERNAL ENERGY GEN. (KWH)s 1998416.0 9530273.0 399801582.5
9. UNIT AVAILABILITY FACTOR () 100.0 73.5 69.2
10. UNIT CAPACITY FACTOR (XMC) (%): - 101.3 70.4 64.6
11. UNIT FORCED OUTAGE RATE (b)s 0.0 1.5 15.4

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE August 1,2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: JuIv 2003 No. Date Type Duration Reason Method of Cause / Corrective Actions (YAMID) F Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE.

(1)Reason (2)Method A - Equipment Failure (Explain) 1 - manual B - Maintenance or Test 2 - Manual TdpI Scram C- Refueling 3 - Automatic Tdp I Scram D- Regulatory RestrIction 4 - ContInuation E - Operator Training / icense Examination 5 - Other (Explain)

F -Administrative G-Operational Error (Explain)

H -Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% ouput for the entire month.

_ H

~ ~_

_ , _. , .111- .

_ ~~ ~ ~ -b - _~1 wo "

OPERATING DATA REPORT DOCKET NO0 2 50-412 UNIT NAME: JYPS UNIT 62 REPORT DATE: 08/01/03 COMPLETED EYs DAVID T. JONES

,.; TELEPHONE 1(724) 682-4962

  • ** *
  • 0 0 *0*0*0**** *
  • REPORTING PERIODS JULY 2003
  • Noten2 Rated thermal power at
  • 2n.
  • BVPS-2 was uprated from 2652 aWt SESIGN ELECTRICAL RATING (Net xwe)2 836
  • to 2689 Xut on 10/30/01. Net
  • 1.
  • MDC was also uprated from
  • 2.- IX=. -DEPEND1=LE CAPACITY4Net EWe) 2---831 - - 120 _tafe-to 831l _ *

, 0 * *

  • 0 * * * ** * * **
  • THIS MONTH YEAR TO DATE CUMULaTXVE 3a. HOURS IN REPORTING PERIOD: 744.0 5087.0 137654.0
3. nO. OF EPS. REACTOR =AS CRITICAL: 744.0 5087.0 114642.1
4. SERVICE HOURS GENERATOR ON LINE: 744.0 5087.0 113913.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (KWH): 617505.0 4250052.0 89432455.0
7. GROSS ELECT. ENERGY GEN. (MMW), 649959.0 4468585.0 94500630.0
8. GROSS THERMAL ENERGY GEN. (KWA) t 1997943.0 13577191.0 288176802.0
9. UNIT AVAILABILITY FACTOR (%)t 100.0 100.0 82.8
10. UNIT CAPACITY FACTOR (MDC) (%): 99.9 100.5 78.0
11. UNIT FORCED OUTAGE RATE (%)t 0.0 0.0 9.4 owww".