MONTHYEARML0319605302003-07-31031 July 2003 Request for Additional Information, Jet Pump Operability Surveillance Requirements and Correction to Reference Cited in TS 4.11.C.1 Project stage: RAI ML0323104492003-08-0707 August 2003 Response to NRC Request for Additional Information in Support of Proposed Changes to Jet Pump Operability Surveillance Requirements Project stage: Response to RAI ML0403307902004-01-30030 January 2004 License Amendment, Tech Spec Pages Project stage: Other ML0332903472004-01-30030 January 2004 License Amendment, Issuance of Amendment, Jet Pump Surveillance Requirements Project stage: Approval 2003-08-07
[Table View] |
|
---|
Category:Letter
MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22102A0932022-05-12012 May 2022 LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 ML22104A0542022-04-30030 April 2022 LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22152A2592022-04-25025 April 2022 Zaccagnini Letter Dated 04/25/22 ML22152A2642022-04-19019 April 2022 Flynn Letter Dated 04/19/22 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22130A6762022-03-14014 March 2022 Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station ML22041B0762022-03-0707 March 2022 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay ML22054A2962022-02-23023 February 2022 Annual ISFSI Radioactive Effluent Release Report for 2021 2024-02-02
[Table view] |
Text
E t i Etergy Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Michael A. Balduzzi Site Vice President August 7, 2003 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Response to NRC Request for Additional Information in Support of Proposed changes to Jet Pump Operability Surveillance Requirements (TAC NO. MB7950)
REFEENCES:
- 1. Entergy Letter No. 2.03.001, Request for Amendment to the Technical Specifications (TS), Jet Pump Operability Surveillance Requirements and Correction to Reference Cited in TS 4.11.C.1, Revision 1, dated, January 30, 2003.
- 2. NRC Letter, Request for Additional Information Re: Jet Pump Operability Surveillance Requirements and Correction to Reference Cited in TS 4.11.C.1 (TAC No. MB7950), dated July 31, 2003 LETTER NUMBER: 2.03.087
Dear Sir or Madam:
By Reference 1, Entergy requested review and approval of changes to Pilgrim's Technical Specification (TS) 4.6.E, jet pump surveillance requirements and its Bases and a correction to a reference in TS 4.11.C.1, in accordance with 10 CFR 50.90.
The attachment to this letter provides the Pilgrim response to the NRC Request for Additional Information, dated July 31, 2003 (Reference 2), in support of the referenced submittal. This response does not impact the no significant hazards consideration determination (10 CFR 50.92(c)) provided in the referenced submittal.
203087
Entergy Nuclear Operations, Inc. Letter Number: 2.03.087 Pilgrim Nuclear Power Station Page 2 If you have any questions or require additional information, please contact Mr. Bryan Ford, Licensing Manager, at (508) 830-8403.
I declare under penalty of perjury that the foregoing is true and correct.
Executedonthe 7th dayof August 2003.
Sincerely, 4#dr/4 -&I Michael A. Balduzzi
Attachment:
Pilgrim Response to NRC Request for Additional Information (1 page) cc:
Mr. Travis Tate, Project Manager Mr. Steve McGrail, Director Office of Nuclear Reactor Regulation Mass. Emergency Management Agency Mail Stop: 0-8B-1 400 Worcester Road U.S. Nuclear Regulatory Commission P.O. Box 1496 1 White Flint North Framingham, MA 01702 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Mr. Robert Walker Region 1 Radiation Control Program 475 Allendale Road Commonwealth of Massachusetts King of Prussia, PA 19406 Exec Offices of Health & Human Services 174 Portland Street Boston, MA 02114 Senior Resident Inspector Pilgrim Nuclear Power Station 203087
ATTACHMENT PILGRIM RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION DATED JULY 31. 2003 (TAC NO. MB7950)
REQUEST FOR AMENDMENT TO THE TECHNICAL SPECIFICATIONS, 4.6.E, JET PUMP OPERABILITY SURVEILLANCE AND CORRECTION TO REFERENCE CITED IN TS 4.11.C.1 NRC REQUEST In your application dated January 30, 2003, you reference the requirements in NUREG-1434, Standard Technical Specifications (STS) for BWR/6 in your proposed change instead of the requirements in NUREG-1433, STS for BWR/4, at several sections in the submittal. In BWR/6 plants, flow control valves are used rather than the variable pump speed for recirculation flow control. Pilgrim utilizes the variable pump speed design for flow control. Please provide an explanation of why Entergy proposes the use of the jet pump operability requirements in NUREG-1434, STS for BWR/6, rather than STS for BWR/4? Please address the impact, if any, of the difference in pumps for flow control on your proposed changes.
PILGRIM RESPONSE The current and proposed Jet Pump Operability surveillances included in Pilgrim TS 4.6.E are consistent with the surveillances included in GE STS, NUREG-0123, Rev. 2, dated August 1979, which are similar to the surveillances in BWR/6 STS. Pilgrim elected to reference the BWR/6 STS because the format and content of Pilgrim's current and proposed surveillances are similar to the BWR/6 surveillances, rather than BWR/4. Also, use of BWR/6 surveillances is consistent with BWR/4 STS as stated in the Reviewer's Note on page 3.4-4 of BWR/4 STS.
Further, the proposed surveillances were chosen to prevent modifying the surveillance methodology, which is currently required by the Pilgrim Technical Specifications while resolving the non-conservative acceptance criteria in the current Technical Specifications. The NSSS vendor recommended the proposed surveillance criteria.
The Pilgrim TS 4.6.E.1 compares recirculation loop flows to each other at the same pump speeds (within +/-5%), whereas, the BWR/6 STS looks at established relationships among the flow control valve position, recirculation flow, and pump speed. Pilgrim does not have flow control valves and operates with both gate valves in full open positions. With both gate valves full open and the recirculation pumps operating at the same speed, a significant difference in flow between the recirculation loops could indicate a jet pump failure. Accordingly, TS 4.6.E.1 compares recirculation loop flows to each other at the same pump speeds with full open gate valves. Consistent with the acceptance criteria for a difference of 10% from the expected flow rates in BWR/6 surveillance, 10% is proposed in Pilgrim TS as the acceptance criteria for this surveillance. The NSSS vendor suggested this value based on industry experience to resolve the non-conservative acceptance criteria.