Request for Additional Information, Jet Pump Operability Surveillance Requirements and Correction to Reference Cited in TS 4.11.C.1
ML031960530
Person / Time
Site: Pilgrim
Issue date: 07/31/2003
From: Travis Tate
NRC/NRR/DLPM/LPD1
To: Kansler M
Entergy Nuclear Operations
Tate T, NRR/DLPM, 415-8474
References
TAC MB7950
Download: ML031960530 (5)


Text

July 31, 2003 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

PILGRIM NUCLEAR POWER STATION - REQUEST FOR ADDITIONAL INFORMATION RE: JET PUMP OPERABILITY SURVEILLANCE REQUIREMENTS AND CORRECTION TO REFERENCE CITED IN TS 4.11.C.1 (TAC NO. MB7950)

Dear Mr. Kansler:

By application dated December 10, 2002, as replaced by application dated January 30, 2003, Entergy Nuclear Operations, Inc. (ENO) submitted a license amendment request for proposed changes to the Pilgrim Nuclear Power Station Technical Specification 4.6.E, associated with jet pump operability surveillance requirements.

The U.S. Nuclear Regulatory Commission staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter and was sent to Mr. Bryan Ford, of your staff, by e-mail on June 23, 2003. During a conference call held with your staff on July 28, 2003, Mr. Ford indicated that ENO would respond to the requested information by August 8, 2003. If circumstances result in the need to revise the response date, please contact me at (301) 415-8474.

Sincerely,

/RA/

Travis L. Tate, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Request for Additional Information cc w/encl: See next page

July 31, 2003 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

PILGRIM NUCLEAR POWER STATION - REQUEST FOR ADDITIONAL INFORMATION RE: JET PUMP OPERABILITY SURVEILLANCE REQUIREMENTS AND CORRECTION TO REFERENCE CITED IN TS 4.11.C.1 (TAC NO. MB7950)

Dear Mr. Kansler:

By application dated December 10, 2002, as replaced by application dated January 30, 2003, Entergy Nuclear Operations, Inc. (ENO) submitted a license amendment request for proposed changes to the Pilgrim Nuclear Power Station Technical Specification 4.6.E, associated with jet pump operability surveillance requirements.

The U.S. Nuclear Regulatory Commission staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter and was sent to Mr. Bryan Ford, of your staff, by e-mail on June 23, 2003. During a conference call held with your staff on July 28, 2003, Mr. Ford indicated that ENO would respond to the requested information by August 8, 2003. If circumstances result in the need to revise the response date, please contact me at (301) 415-8474.

Sincerely,

/RA/

Travis L. Tate, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION:

PDI-2 Reading C. Anderson, RI PUBLIC C. Raynor J. Clifford T. Tate F. Arner, RI J. Bobiak, RI F. Akstulewicz G. Thomas ADAMS Accession Number: ML031960530 OFFICE PDI-2/PM PDI-2/LA PDI-2/SC NAME TTate CRaynor JClifford DATE 7/30/03 7/29/03 7/31/03 OFFICIAL RECORD COPY

Enclosure REQUEST FOR ADDITIONAL INFORMATION PILGRIM NUCLEAR POWER STATION REQUEST FOR AMENDMENT TO THE TECHNICAL SPECIFICATIONS, JET PUMP OPERABILITY SURVEILLANCE AND CORRECTION TO REFERENCE CITED IN TS 4.11.C.1 In your application dated December 10, 2002, as replaced by application dated January 30, 2003, you reference the guidance in NUREG-1434, Standard Technical Specifications (STS) for BWR/6 in your proposed change instead of the requirements in NUREG-1433, STS for BWR/4, at several sections in the submittal. In BWR/6 plants, flow control valves are used rather than the variable pump speed for recirculation flow control. Pilgrim utilizes the variable pump speed design for flow control. Please provide an explanation of why Entergy proposes the use of the jet pump operability requirements in NUREG-1434, STS for BWR/6, rather than STS for BWR/4. Please address the impact, if any, of the difference in flow control for the pumps on your proposed changes.

Pilgrim Nuclear Power Station cc:

Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 Dr. Robert M. Hallisey, Director Radiation Control Program Commonwealth of Massachusetts Executive Offices of Health and Human Services 174 Portland Street Boston, MA 02114 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Steve Brennion Supt., Regulatory & Industry Affairs Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road, M/S 1 Plymouth, MA 02360-5508 Mr. Jack Alexander Manager, Reg. Relations and Quality Assurance Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5599 Mr. David F. Tarantino Nuclear Information Manager Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5599 Ms. Jane Perlov Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108 Mr. Stephen J. McGrail, Director Attn: James Muckerheide Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426

Pilgrim Nuclear Power Station (Cont.)

cc:

Mr. Gary Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. John Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. William J. Riggs Director, Nuclear Assessment Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Dan Pace Vice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Randall Edington Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John Kelly Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Senior Resident Inspector U.S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station 600 Rocky Hill Road Mail Stop 66 Plymouth, MA 02360-5508 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue, Mail Stop L-ENT-15E New Orleans, LA 70113