Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 AUG 5 2003 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.
C. 20555 Gentlemen:
In the Matter of
)
Docket No.50-390 Tennessee Valley Authority WATTS BAR NUCLEAR PLANT (WBN)
JULY 2003 MONTHLY OPERATING REPORT Enclosed is the July 2003 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4.
There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.
Sincerely, P.
L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc:
See page 2 P-inted o recycld pe-
U.S. Nuclear Regulatory Commission Page 2 AUG 1 5 2003 cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Ms. Margaret H. Chernoff, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)
MONTHLY OPERATING REPORT JULY 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER PF-90 E-1
OPERATING DATA REPORT Docket No.
Unit Name:
Date:
Completed By:
Telephone:
Reporting Period:
50-390 WBN Unit 1 August 7, 2003 P. P. Salkeld (423) 365-3635 July 2003
- 1. Design Electrical Rating (MWe-Net):
- 2.
Maximum Dependable Capacity (MWe-Net):
1155 1121*
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month 744 744 0.0 831474 Year-to-Date 4963 4946 Cumulative 58129 57846 0.0 64139224 0.0 5673155
- Adjusted based on seasonal conditions experienced during Cycle 5.
E-2
UNIT SHUTDOWNS DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-390 WBN-1 August 7, 2003 P. P. Salkeld (423) 365-3635 4
REPORT PERIOD: July 20 t............
............ u.......
'a e:
Ura 0WA:
OM ve::A
...................................I Nk....... D D........
V ekhod':'
U :
............. y em
... d... CO'. C a,.. 6.1',
iiii ( H 4 '::
........................ 4........................ I
...... I
- e.............. : C. dt
......-........... ]PW.:
ven-t R e--r-u rn -n ce,:,..........
I..................
............. I I....................
............... I........
--ffi n........ I..... I.-
'S h u
...... R.......... r... f N
.............. I
.............. I........................
......... I..........
.......................................... - I
..................... I
..........................I
........... I....................................................................
I
.......I...
........I
............................. I........I....................... I....
I........
I
.............. I........
.......... I.....
...... I
.....I................-
I.. -................
D "
- Wwwwwwww:
I
... I..........
......... I
........... I............
i !!:...
I
.................................. I....
.............. I........ I.
...................................... I........
...... I- -....
W.
I IF: Forced S: Scheduled 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain) 4Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
Summary: WBN Unit 1 operated at or near 100% power for the month of July 2003. There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month.