tNMc Committed to Nuclear Excellene Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-083 10 CFR 50, App. E August 4, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 EMERGENCY RESPONSE DATA SYSTEM Pursuant to 10 CFR 50 Appendix E, Nuclear Management Company, LLC hereby submits a copy of the "ERDS" data point library, Figures EPMPFG-09.05-07 and EPMPFG-09.05-08, and Index EPMPFG-09.05-00 from our procedure EPMP 9.5, "Control of ERDS Hardware and Software." This submittal is being sent to ensure the NRC data library used for ERDS has incorporated the revisions to these three figures.
10 CFR 50 Appendix E, section VI, "Emergency Response Data System," item 3.a, states that any hardware and software changes that affect the transmitted data points identified in the ERDS Data Point Library must be submitted to the NRC within 30 days after the changes are completed. Contrary to the above, the changes to the reactor coolant system (RCS) flow ERDS data point, submitted herein, were completed on May 17, 2003. This issue has been entered into the corrective action program.
Pursuant to 10 CFR 50.4, two additional copies of this letter and attachment are hereby submitted to Region Ill. Also, as required, one copy of this letter and attachment is submitted to the Kewaunee Nuclear Power Plant NRC Senior Resident Inspector.
This letter contains no new commitments and no revisions to existing commitments.
Thomas Coutu Site Vice-President, Kewaunee Plant GOR cc Ms. Karen B. Jackson, US NRC, Incident Response Operation, w/attach NRC Senior Resident Inspector, w/attach.
US NRC, Region Ill (2 copies), w/attach.
Electric Division, PSCW, wto attach.
QA Vault, w/attach.
(0 Attachment N490 Highway 42
- Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560
ATTACHMENT I NUCLEAR MANAGEMENT COMPANY, LLC KEWAUNEE NUCLEAR PLANT DOCKET 50-305 August 4, 2003 Letter from Thomas Coutu (NMC)
To Document Control Desk (NRC)
Change in ERDS Enclosed Pages:
Figure EPMPFG-09.05-00 Figure EPMPFG-09.05-07 Figure EPMPFG-09.05-08
= -
ERDS DATA POINT LIBRARY TABLE INDEX KEWAUNE NUCLEAR POWER PLANT FIGUREITABLE NUMBER 9.5-1 9.5-2 9.5-3 9.5-4 9.5-5 9.5-6 09.05-07 09.05-08 9.5-9 9.5-10 9.5-11 9.5-12 9.5-13 9.5-14 9.5-15 9.5-16 9.5-17 9.5-18 9.5-19 9.5-20 9.5-21 9.5-22 9.5-23 9.5-24 9.5-25 9.5-26 9.5-27 9.5-28 9.5-29 9.5-30 9.5-31 9.5-32 9.5-33 9.5-34 9.5-35 9.5-36 9.5-37 9.5-38 9.5-39 9.5-40 9.5-41 9.5-42 9.5-43 09.05-44 POINT E N8020G N70350 N8031G L8024G I11000 T0020G F80070 F8008G L8013G L8014G P8021G P8022G F8009G F801OG F8003A F8004A T0419A T0439A T0406A T0426A P8023G L8015G F0128G F80010 F80020 F0626A NOT AVAIL.
L8OOIA G00140 G0018G G0015G G0040G G0009G G0032G G0034G G0019G P8004A T1OOOA X8001A L8008A M0001A M0002G M0004A ERDSDATATYPE GENERIC DESCRIPTION NUCLEAR INSTRUMENTS, POWER RANGE NUCLEAR INSTRU, INTERMED. RANGE NUCLEAR INSTRU, SOURCE RANGE REACTOR VESSEL WATER LEVEL HIGHEST TEMP AT THE CORE EXIT SATURATION TEMP-HIGHEST CET REACTOR COOLANT FLOW LOOP A REACTOR COOLANT FLOW LOOP B STEAM GENERATOR A WATER LEVEL STEAM GENERATOR B WATER LEVEL STEAM GENERATOR A PRESSURE STEAM GENERATOR B PRESSURE STM GEN A MAIN FEEDWATER FLOW STM GEN B MAIN FEEDWATER FLOW STM GEN A AUXILIARY FW FLOW STM GEN B AUXILIARY FW FLOW STM GEN A INLET TEMPERATURE STM GEN B INLET TEMPERATURE STM GEN A OUTLET TEMPERATURE STM GEN B OUTLET TEMPERATURE REACTOR COOLANT SYSTEM PRESSURE PRIMARY SYSTEM PRESSURIZER LEVEL PRIMARY SYSTEM CHARGING FLOW HIGH PRESS SAFETY INJECTION PLOW HIGH PRESS SAFETY INJECTION FLOW LOW PRESS SAFETY INJECTION FLOW CONTAINMENT SUMP NARROW RNG LVL CONTAINMENT SUMP WIDE RNG LVL RADIOACTIVITY OF RELEASED GASSES RADIOACT. OF RELEASED LIQUIDS CONDENSER AIR EIECTOR RADIOACT.
RADIATION LEVEL IN CONTAINMENT RAD LEVEL OF RCS LETDOWN LINE STM GEN A STEAM LINE RAD LEVEL STM GEN B STEAM LINE RAD LEVEL STM GEN BLOWDOWN RAD LEVEL CONTAINMENT PRESSURE CONTAINMENT TEMPERATURE CONTAINMENT HYDROGEN CONCEN.
BORATED WATER STORAGE TANK LEVEL WIND SPEED AT REACTOR SITE WIND DIRECTION AT REACTOR SITE AIR STABILITY AT REACTOR SITE ERDS PLANTISIMULATOR DATA REV.
A A
A A
A A
M M
A A
A A
A A
A A
C C
C C
A A
A B
B A
A A
C C
C C
C C
C C
A A
A A
A A
A A
LIBRARY SHEET REVISION DATE 04/08/94 04/08194 04/08/94 04/08/94 04/08/94 04/08/94 07/29/03 07/29/03 04/08/94 04J08/94 04108/94 04/08/94 04/08/94 04/08/94 04/08/94 04/08/94 03/06195 03/06/95 03/06195 03/06/95 04/08/94 04/O8/94 04/08/94 01/13/9 01113/97 04/08/94 04//4 04/08/94 03M"595 03/06/95 03l06195 03J06/95 03/06/95 03/06(95 03/06/95 03/06/95 04/08/94 04/08194 04/08/94 04/08/94 04108/94 04/08194 04108/94 05110/01 Figure EPMPFG-09.05-00 Rev. P Date: JUL 29 2003 Page 1 of 1 REFERENCE USE
REACTOR COOLANT FLOW LOOP A KEWAUNEE NUCLEAR POWER PLANT ITEM LENm KNPP ERDS DATA ITEM
~LENGTH DATE:
(8) 0526/95 REACTOR UNIT:
(3)
KWI DATA FEEDER:
(10)
N/A NRC ERDS PARAM:
(12)
CORE FLOW POINT ID:
(12)
(40)
RCLA AVERAGE FLOW (LOOP A)
GENERIC/COND DESC:
t32)
REACTOR COOLANT FLOW LOOP A ANALOG/DIGITAL:
(Q)
A (A. D)
ENGR UNITS/DIG ST:
(12)
PCT ENGR UNITS CONVERS:
t40)
N/A MIN INSTR RANGE:
(10) 0 MAX INSTR RANGE:
(10) 110 ZERO PT REF: -
N/A-REF PT NOTES:
(40)
N/A PROC OR SENS:
(I)
P (P.S)
NUMBER OF SENSORS:
t3) 3 HOW PROCESSED:
(40)
AVERAGE' SENSOR LOCATIONS:
(40)
CONTAINMENT ALARMtRIP SET PT:
(40) 90% REACTOR TRIP NI DET PWR SUPPLY CUTOFFPWRLVL:
(15)
N/A NI DET PWR SUPPLY TURN ON PWR LVL:
115)
N/A INSTR FAIL MODE:
(30)
LOW TEMP COMP FOR DP XMTRS:
(3)
N (Y. N. N/A)
LEVEL REF LEG:
- 13)
N/A (DRY, WET)
UNIQUE SYS DESC:
(600)
INSTRUNMENTS:
FT-411, FT-412, FT-413.
100% FLOW = 96,458 GPM (NOTE: THIS NUMBER WILL CHANGE ANNUALLY BASED ON S/G TUBE PLUGGING OR SLEEVING PERFORMED.)
Figure EPMPFG-09.05-07 Rev. M Date: JUL 29 2003 Page 1 of I REFERENCE USE
REACTOR COOLANT FLOW LOOP B KEWAUNEE NUCLEAR POWER PLANT ITEM
~~FIELD ITEM KLENGTH E NPP ERDS DATA DATE:
(S) 05/26/95 REACTOR UNIT:
(3)
KW1 DATA FEEDER:
(10)
N/A NRC ERDS PARAM:
(12)
CORE FLOW POINT ID:
(12)
(40)
RCLB AVERAGE FLOW (LOOP B)
GENERIC/COND DESC:
(32)
REACTOR COOLANT FLOW LOOP B ANALOG/DIGITAL:
(1)
A (A, D)
ENGR UNITS/DIG ST:
(12)
PCT ENGR UNITS CONVERS:
(40)
N/A MIN INSTR RANGE:
(10).
0 MAX INSTR RANGE:
6i) 110 ZERO PT REF:
(6)
N/A REF PT NOTES:
(40)
N/A PROC OR SENS:
(1 P
(P, S)
NUMBER OF SENSORS:
(3) 3 HOW PROCESSED:
(40).
AVERAGE SENSOR LOCATIONS:
(40)
CONTAINMENT ALARM/TRIP SET PT:
(40) 90% REACTOR TRIP NI DET PWR SUPPLY CUTOFF PWR LVL:
(15)
N/A NI DET PWR SUPPLY TURN ON PWR LVL:
(15)
N/A INSTR FAIL MODE:
(30)
LOW TEMP COMP FOR DP XMTRS:
(3)
N (Y, N, N/A)
LEVEL REF LEG:
(3)
N/A (DRY, WET)
UNIQUE SYS DESC:
(600)
INSTRUMENTS:
FT-414, FF415, FTF416.
100% FLOW = 97,992 GPM (NOTE: THIS NUMBER WILL CHANGE ANNUALLY BASED ON S/G TUBE PLUGGING OR SLEEVING PERFORMED.)
Figure EPMPFG-09.05-08 Rev. M Date: JUL 29 2003 Page 1 of 1 REFERENCE USE