ML032240684

From kanterella
Jump to navigation Jump to search
Change Notice 03-028
ML032240684
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 08/06/2003
From:
NRC/NRR/DIPM/IIPB
To:
Klingler, G R, NRR/DIPM/IIPB, 415-3077
Shared Package
ML032260595 List:
References
03-028
Download: ML032240684 (2)


Text

Issue Date: 08/06/03 03-028 NRC INSPECTION MANUAL IIPB Change Notice 03-028 DELETED:

TRANSMITTED:

Number Date Number Date 1.

IMC 2509 08/06/03 2.

IP 35301 08/06/03 3.

IP 50090 08/06/03 4.

IP 50100 08/06/03 5.

IP 51053 08/06/03 6.

IP 51055 08/06/03 7.

IP 51061 08/06/03 8.

IP 70304 08/06/03 9.

TI 2500/020 08/06/03

10. ----

TI 2515/111 08/06/03 TRAINING:

No special training requirements have been identified for any documents issued with this change notice.

REMARKS: IMC 2509 (Browns Ferry Unit 1 Restart Project Inspection Program) is issued to address closure of open items, regulatory concerns, inspection requirements, temporary discontinuance of ROP during the BF1s restart, adoption of the traditional-form of enforcement since the SDP is not applicable from a risk perspective during the BF1 restart, and the transition into the ROP on a cornerstone by cornerstone basis.

IP 35301, Preoperational Testing - Quality Assurance IP 70304, Engineered Safety Features Test - Preoperational Test Procedure Review IP 70315, Engineered Safety Features Test - Preoperational Test Witnessing

03-028 Issue Date: 08/06/03 IP 70322, Preoperational Test Results Evaluation - ESF IP 50090, Pipe Support and Restraint Systems IP 50100, Heating, Ventilating, and Air Conditioning Systems IP 51053, Electrical Components and Systems - Work Observation IP 51055, Electrical Components and Systems - Record Review IP 51061, Electrical Cable - Procedure Review TI 2055/020, Inspection to Determine Compliance with ATWS Rule 10 CFR 50.62" TI 2515/111, Electrical Distribution System Followup Inspection The above inspection procedures and temporary instructions had been previously deleted, but are now re-activated for use with the BF1 restart program.

DISTRIBUTION: Standard END