Correction to Leak-Before-Break Safety Evaluation
ML032190086
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/15/2003
From: John Lamb
NRC/NRR/DLPM/LPD3
To: Solymossy J
Nuclear Management Co
Lamb J, NRR/DLPM, 415-1446
References
TAC MC0022, TAC MC0023
Download: ML032190086 (4)


Text

August 15, 2003 Mr. Joseph M. Solymossy Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -

CORRECTION TO LEAK BEFORE BREAK SAFETY EVALUATION REPORT (TAC NOS. MC0022 AND MC0023)

Dear Mr. Solymossy:

By letter dated July 14, 2003, the Nuclear Management Company, LLC (NMC) informed the U.S. Nuclear Regulatory Commission (NRC) that NMC discovered an apparent error in the NRC staffs safety evaluation (SE), dated December 22, 1986 (ADAMS Accession No. ML022200425), related to the Prairie Island Nuclear Generating Plant, Units 1 and 2, licensing basis for application of leak-before-break (LBB) methodology.

The SE documented the NRC staffs completion of its review of the licensees request for an exemption to allow the application of the LBB methodology as a basis for the elimination of protective devices (i.e., pipe whip restraints, jet impingement barriers, and other related changes) of the primary reactor coolant systems at Prairie Island, Units 1 and 2. The licensee provided technical information by letters dated October 24, 1984, October 21, and November 5, 1985, and supplemented by letter dated September 10, 1986, in response to NRC staff concerns.

The NRC SER states the following on pages 4 and 5:

(1) For Prairie Island Unit 1, the loads associated with the highest stressed location in the main loop primary system piping are 2,235 kips [thousand pounds] (axial),

28,422 in-kips [inch-kips] (bending moment) and result in maximum stresses of about 60% of the Service Level D limits specified in Section III of the ASME

[American Society of Mechanical Engineers] Code. For Prairie Island Unit 2, the loads associated with the highest stressed location in the main loop primary system piping are 1,623 kips (axial), 28,422 in-kips (bending moment) and result in maximum stresses of about 50% of the Service Level D limits specified in Section III of the ASME Code.

In its letter dated July 14, 2003, NMC asserts the following:

The indicated axial pipe stress of 2,235 kips at the highest stressed location in Unit 1 main loop primary system piping is not supported by WCAP-10639 [Technical Bases for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for Prairie Island Unit 1"] . WCAP-10639, Pages 3-1, 3-3 and 4-5, states that the axial force in the Unit 1 piping is 1,623 kips at the highest stressed location in the main loop primary system piping.

J. Solymossy The NRC staff has reviewed WCAP-10639 (especially pages 3-1, 3-3, and 4-5), as well as the December 22, 1986, SE. The NRC has determined that the 2,235 kips value stated in the SE was an administrative error. The NRC staff finds that the correct value should be 1,623 kips for the axial load at the critical location for the main loop primary system piping at Prairie Island, Unit 1. The NRC staff also finds that the corrected value does not change the NRC staffs conclusions made in the December 22, 1986, SE. Enclosed is a corrected page 4 for the December 22, 1986, SE.

This completes the NRC staffs efforts under TAC Nos. MC0022 and MC0023. If you have any questions, please feel free to contact me at 301-415-1446.

Sincerely,

/RA by Anthony C. McMurtray for/

John G. Lamb, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306

Enclosure:

Corrected page 4 for December 22, 1986, SE cc w/encl: See next page

ML032190086 OFFICE PDIII-1/PM PDIII-1/LA EMCB/SC PDIII-1/SC NAME JLamb RBouling TChan LRaghavan DATE 08/13/03 08/13/03 08/13/03 08/14/03 Prairie Island Nuclear Generating Plant, Units 1 and 2 cc:

Jonathan Rogoff, Esquire Tribal Council General Counsel Prairie Island Indian Community Nuclear Management Company, LLC ATTN: Environmental Department 700 First Street 5636 Sturgeon Lake Road Hudson, WI 54016 Welch, MN 55089 Manager, Regulatory Affairs Nuclear Asset Manager Prairie Island Nuclear Generating Plant Xcel Energy, Inc.

Nuclear Management Company, LLC 414 Nicollet Mall, R.S. 8 1717 Wakonade Drive East Minneapolis, MN 55401 Welch, MN 55089 John Paul Cowan Adonis A. Neblett Executive Vice President & Chief Nuclear Assistant Attorney General Officer Office of the Attorney General Nuclear Management Company, LLC 455 Minnesota Street 700 First Street Suite 900 Hudson, WI 54016 St. Paul, MN 55101-2127 Mano K. Nazar U.S. Nuclear Regulatory Commission Senior Vice President Resident Inspectors Office Nuclear Management Company, LLC 1719 Wakonade Drive East Prairie Island Nuclear Generating Plant Welch, MN 55089-9642 1717 Wakonade Drive East Welch, MN 55089 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Administrator Goodhue County Courthouse Box 408 Red Wing, MN 55066-0408 Commissioner Minnesota Department of Commerce 121 Seventh Place East Suite 200 St. Paul, MN 55101-2145 August 2003