July 15, 2003 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CONFIRMATION OF INITIAL/REQUALIFICATION OPERATOR LICENSE EXAMINATIONS: LASALLE COUNTY STATION

Dear Mr. Skolds:

In a letter dated July 18, 2002, (RS-02-123) your staff requested we schedule an initial license operator examination in May 2004. In a subsequent telephone conversation on June 20, 2003, between Mr. D. McNeil of my staff and Mr. A. Bailey, LaSalle County Station ILT Group Lead, the requested examination was tentatively scheduled to occur during the week of March 7, 2005, at the request of your staff. On-site validation of the examination will occur at the station approximately 3 weeks before the examination administration. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

As stated in your letter, your staff will develop the examination. Mr. Bailey indicated that you are training approximately six candidates for the examination. Mr. Bailey confirmed that the week of October 6, 2003, scheduled for the biennial requalification program inspection (IP 71111.11B),

was still within the anticipated requalification examination administration cycle. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for either of the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. B. Palagi of my staff at 630-829-9611.

J. Skolds In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 See attached distribution.

DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML032130660.wpd To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS RIII:DRS RIII:DRS RIII:DRS NAME MABies:sd BPalagi RDLanksbury DATE 7/15/03 7/15/03 7/16/03 OFFICIAL RECORD COPY

J. Skolds In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Roger D. Lanksbury, Chief Operations Branch Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 See attached distribution.

J. Skolds cc:

Site Vice President - LaSalle County Station LaSalle County Station Plant Manager Regulatory Assurance Manager - LaSalle Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Clinton and LaSalle Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission P. Nelson, Grundy County Board Chairman C. Dieckmann, Training Department

J. Skolds ADAMS Distribution:

AJM DFT DMS6 H. Nieh (HKN), OEDO Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG HBC RML2 DEK DRPIII DRSIII PLB1 JRK1 D. C. Trimble, NRR:DIPM:IOLB M. A. Bies, DRS

[Include only if examination is longer than one week.]