August 20, 2003 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
PILGRIM NUCLEAR POWER STATION - TECHNICAL SPECIFICATION TYPOGRAPHICAL ERROR, AMENDMENT NO. 176 (TAC NO. MB9013)
Dear Mr. Kansler:
On July 28, 1998, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 176 to Facility Operating License No. DPR-35 for the Pilgrim Nuclear Power Station. The amendment consisted of changes to the Technical Specifications (TSs) associated with the ultimate heat sink, salt service water system, and containment cooling system.
One of the changes approved by Amendment No. 176 involved administrative changes to reformat and repaginate TS Section 3.5, as described on pages 2-3 of the NRCs Safety Evaluation. However, when issuing Amendment No. 176, the revised TS page 3/4.5-8 included a typographical error which inadvertently changed a word in TS 4.5.D.1 from RCIC to HPCI.
As discussed in your letter dated August 14, 2002, the change made by error was not requested by the licensee, nor was it addressed in the notice to the public nor approved by the NRC.
The NRC staff is issuing the enclosed correction to the typographical error, as requested in your August 14, 2002, letter.
Sincerely,
/RA/
Travis L. Tate, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosure:
TS Page 3/4.5-8 cc w/encls: See next page
August 20, 2003 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
PILGRIM NUCLEAR POWER STATION - TECHNICAL SPECIFICATION TYPOGRAPHICAL ERROR, AMENDMENT NO. 176 (TAC NO. MB9013)
Dear Mr. Kansler:
On July 28, 1998, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 176 to Facility Operating License No. DPR-35 for the Pilgrim Nuclear Power Station. The amendment consisted of changes to the Technical Specifications (TSs) associated with the ultimate heat sink, salt service water system, and containment cooling system.
One of the changes approved by Amendment No. 176 involved administrative changes to reformat and repaginate TS Section 3.5, as described on pages 2-3 of the NRCs Safety Evaluation. However, when issuing Amendment No. 176, the revised TS page 3/4.5-8 included a typographical error which inadvertently changed a word in TS 4.5.D.1 from RCIC to HPCI.
As discussed in your letter dated August 14, 2002, the change made by error was not requested by the licensee, nor was it addressed in the notice to the public nor approved by the NRC.
The NRC staff is issuing the enclosed correction to the typographical error, as requested in your August 14, 2002, letter.
Sincerely,
/RA/
Travis L. Tate, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosures:
TS Page 3/4.5-8 cc w/encls: See next page DISTRIBUTION:
J. Clifford C. Anderson, RI PUBLIC C. Raynor J. Bobiak, RI PDI-2 Reading T. Tate OGC G. Hill (2), T-5C3 ACRS S. Magruder C. Holden F. Arner, RI ADAMS Accession Number: ML032130236
- See previous concurrence OFFICE PDI-2/PM PDI-2/LA OGC*
PDI-2/SC NAME TTate CRaynor AHodgdon JClifford DATE 8/15/03 8/15/03 8/7/03 8/18/03 OFFICIAL RECORD COPY
Pilgrim Nuclear Power Station cc:
Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 Dr. Robert M. Hallisey, Director Radiation Control Program Commonwealth of Massachusetts Executive Offices of Health and Human Services 174 Portland Street Boston, MA 02114 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Steve Brennion Supt., Regulatory & Industry Affairs Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road, M/S 1 Plymouth, MA 02360-5508 Mr. Jack Alexander Manager, Reg. Relations and Quality Assurance Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5599 Mr. David F. Tarantino Nuclear Information Manager Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5599 Ms. Jane Perlov Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108 Mr. Stephen J. McGrail, Director Attn: James Muckerheide Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426
Pilgrim Nuclear Power Station (Cont.)
cc:
Mr. Gary Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. John Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. William J. Riggs Director, Nuclear Assessment Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Dan Pace Vice President, Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Randall Edington Vice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John Kelly Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene Faison Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Senior Resident Inspector U.S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station 600 Rocky Hill Road Mail Stop 66 Plymouth, MA 02360-5508 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.
639 Loyola Avenue, Mail Stop L-ENT-15E New Orleans, LA 70113