Committed to Nuclear Excellene Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0061 GL 97-02 July 11, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 DOCKETS 50-266 AND 50-301 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 MONTHLY OPERATING REPORTS Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of June 2003.
Sincerely, Attachment cc:
J. D. Loock, PSCW NRC Regional Administrator NRC Resident Inspector NRC Project Manager
, '2q 6590 Nuclear Road
- Two Rivers, Wisconsin 54241 Telephone: 920.755.2321
OPERATING DATA REPORT DOCKET NO.
50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 07/02/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD June - 2003
- 1. DESIGN ELECTRICAL RATING (MWE-NET)
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 522.0 516.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE
- 5. UNIT RESERVED SHUTDOWN HOURS
- 6. NET ELECTRICAL ENERGY (MWH) 720.0 720.0 0.0 366,566.5 4,343.0 4,343.0 0.0 2,215,812.5 235,942.4 232,401.5 846.9 107,767,121.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-266 Point Beach, Unit 1 7/02/2003 Kim M. Locke 755-6420 REPORTING PERIOD:
June 2003 (Month/Year)
NO.
DATE TYPE DURATION REASON (1)
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUT1ING S:
SCHEDULED DOWN (2)
COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction
- 4. Continuation E. Operator Training/license Examination F Administrative
- 5. Other (Explain)
G. Operational Error (Explain) H.Other (Explain)
SUMMARY
Unit I average daily power for the month of June was 509.1 MWe.
Fish intrusion on 6/30/2003, reduced power to 95%
There was one LER on Unit I in the month of June, LER 266/2003-001 Degraded Grid Voltage Relays.
OPERATING DATA REPORT DOCKET NO.
50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 07/02/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD June - 2003
- 1. DESIGN ELECTRICAL RATING (MWE-NET)
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 522.0 518.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE
- 5. UNIT RESERVED SHUTDOWN HOURS
- 6. NET ELECTRICAL ENERGY (MWH) 720.0 720.0 0.0 368,435.5 4,297.0 4,255.4 0.0 2,153,594.5 230,050.1 227,021.1 302.2 106,941,398.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-301 Point Beach, Unit 2 7/02/2003 Kim M. Locke 755-6420 REPORTING PERIOD:
June 2003 (Month/Year)
NO.
DATE TYPE DURATION REASON (1)
METHOD OF CAUSEICORRECTIVE ACTIONS F:
FORCED (HOURS)
SHUTTING S:
SCHEDULED DOWN (2)
COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason A. Equipment Failure (Explain)
B. Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator Training/license Examination F Administrative G.Operational Error (Explain) H.Other (Explain)
(2) Method I Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram
- 4. Continuation
- 5. Other (Explain)
SUMMARY
Unit 2 average daily power for the month of June was 511.8 MWe.
Fish Intrusion on 6/30, reduced power to 91%
There was one LER on Unit 2 in the month of June, LER 266/2003-001 Degraded Grid Voltage Relays