May 2003 Exam 50-348/2003-301 Final Simulator Scenarios
ML032020386
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/03/2003
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Beasley J
Southern Nuclear Operating Co
References
50-348/03-301, 50-364/03-301, ES-D-1, FOIA/PA-2004-0122 50-348/03-301, 50-364/03-301
Download: ML032020386 (42)


See also: IR 05000348/2003301

Text

Final Submittal

FARLEY EXAM

50-348 & 50-364/2003-301

-

MAY I 9 26,2003

1. As Ciiven Simulator Scenario Operator Actions ES-

D-2

Appendix D Scenario Outline Form ES-D-I

Scenario NO.:^ Op-Test No.: 1

Operators: SRO

RO

BOP

Objective: Evaluate applicant response to a failed open atmospheric relief valve followed bv a feed line break

inside containment

Initial Conditions: (IC-8) 100%. BOL, 2000 MWD. Eauil Xenon, A Train on service. Boron Concentration is

1156ppm.

Turnover: Perform STP-20.2, Penetration Room Filtration Svstem Train B Monthlv Ooerabilitv Test

immediatelv after turnover..

1B MDAFP 00s for motor lube schedule (00s 1 hr, Expected RTS 4 hrs).

1A S/G has a 20 apd tube leak. Steadv for the past 2 weeks.

R70A Setpoint raised to 30 aud.

1B MDAFP tagged out.

MOV 81 12 fails to close on Phase A.

Do not start scenario until data collection is set up

1 Perform STP-20.2 N (initiate next event when BOP is in the control room and NRC

(BOP) directs).

2 IMF / PRESSURE / MS 1A ATMOS REL R 1A S/G Atmospheric fails open. Unable to close from MCB. Isolate

VLV / PK 3371A DRIVER / FAIL (ALL) in MSVR. (Set = 100%, 0 RAMP, 0 DELAY)

OUTPUT DEMAND Ramp Rx power down in response to failed open atmospheric.

1 3 1 PANELS / MCB / 1A CHG PUMP / CMF / I C (RO) I 1A Chg Pump trips. 1B Chg fails to auto start -can be manually

50G I gtartedfrom MCB. (OVERLOAD)

5 I IMFIPRESSUREILTDN HX OUTLET/ C (RO) PT-145 fails LOW. PCV-145 can be controlled in manual from MCB.

PT145 (Set = 0 , O Ramp, 0 Delay)

6 IMF / MISC / SPEED CONTROL, SGFP I (BOP) Feed water FT-508 fails high causing SGFPs to roll back to minimum.

I N I B / PT508 (Set = 1200,O Ramp, 0 Delay)

7 SYSTEMS / MECH / BOP / I B S/G M Feed Line Brcak inside CTMT. (IMFWMZSB)

(ALL) (Set = I(E6), 600sec Ramp, 0 Delay)

U

Do not reinit simulator until data is downloaded

lp-Test No.: 1 Scenario No.: 1 Event No.: 1 Page 1 of 1

vent Description: STP-20.2, Penetration Room Filtration Svstem Train B Monthlv Operability

Test

Initiatingevent: SRO direction per Turnover sheet to perform STP-20.2

immediately after turnover.

_____~ ~

Position Applicant's Actions or Behavior

BOP . Perform STP-20.2

- Close HV3538B.

- Open MOV3362B.

- Verify MOV3361B in AUTO.

- Start 1 6 PRF Recirc fan.

- Start 1 6 PRF Exhaust fan.

- Record MOV3361B local position indication.

- Record indicated pressure

PD13367A

PD13367B.

Record time and total running time Total run time per STP

>15 minutes.

IOTE: Next event can be initiated when 15 minute run time is started.

STP need not be completed.

Annunciators:

PENE RN TO ATMOS A TRN AP HI-LO (BK1)

PENE RN TO ATMOS B TRN AP HI-LO (BK2)

SRO Review STP and verify proper ACCEPTANCE CRITERIA

>p-TestNo.: 1 Scenario No.: 1 Event No.: 2 Page 1 of 1

ivent Description: 1A S/G Atmospheric fails open. Unable to close from MCB. Isolate in MSVR.

Rx power exceeds 100%

lnitiatina event: NRC Direction

~ ~

Position ADulicant's Actions or Behavior

RO/BOP Recognize Rx power increasing to >loo%

Tave decreasing

Przr Level decreasing

SF/FF increasing

Recognize 1A S/G Atmospheric failed open

Attempt to take manual control and close

Call Rover to manually isolate

Possibly will call TB SO to check MSVR Roof

Possibly will enter AOP-14.0, SECONDARY SYSTEM LEAKAGE

Annunciators:

PR OVERPOWER AUTO/MAN ROD STOP (FD2)

(Annunciator possible)

RO Control Reactor:

Tavenref

Rods

BOP Set in ramp per UOP-3.1

Select target and ramp rate

DEH to " G O

SRO Direct crew to ramp to e 100% IAW UOP-3.1

Notify OSS

Check TS far atmospherics OPERABILITY 3.7.4

SOP-0 - notifications NOUE

Notiify Switchyard

)p-Test No.: A Scenario No.: 1 Event No.: 3 Page 1 of 1

ivent Description: 1A CharQinQPump Trips (1B Fails to Auto Start - Can be manuallv started)

Initiating event: NRC Direction

Position Applicant's Actions or Behavior

RO Recognize 1A Charging Pump Tripped

- Charging flow decreasing.

- VCT level increasing

- Seal inj flow decreasing

- Pressurizer level trending down

Start 1B Charging Pump

- Adjust Chg Flow

- Adjust Seal Inj Flow (if req'd)

Annunciators:

- CHG PUMP OVERLOAD TRIP (EB1)

- RCP SEAL INJ FLOW LO (DD1)

- CHG HDR FLOW HI-LO (EA2)

BOP Place turbine on hold (if necessaty)

SRO Ensure operators take actions required by ARPs.

Consult Tech Specs:

3.5.2, TR13.1.5

Investigate and call for repairs and inform OSS

Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Page 1 of 1

Event Description: PT-145 Fails Low (PCV-145 can be manuallv controlled)

Initiating event: NRC Direction

Time Position Applicant's Actions or Behavior

RO Recognize indications of PCV-145 failing closed.

Increasing letdown pressure (indicated)

Annunciators:

LTDN ORIF IS0 VLV REL LINE TEMP HI (DE3)

RO may take manual control of PCV-145 and restore Letdown flow.

Another alternative is to secure letdown.

If Letdown is isolated, Then restore Letdown or place Excess Letdown in service

IAW AOP-16 or SOP-2.1

I I

SRO Ensure board operators take ARP actions.

lp-Test No.: 1 Scenario No.: 1 Event No.: 5 Page 1 of 4

Event Description: PT-508 fails High (SGFPs roll back to minimum)

Initiating event: NRC Direction

Time Position Applicant's Actions or Behavior

-

BOP Recognize indications of SGFP speed control failure

- Decrease in SGFP speeds, flow

- FRV Position increases to full open

Annunciators:

- lA/B/C SG LVL DEV (JF1/2/3)

- lA/lB/lC SG STM FLOW > FEED FLOW (JB1/2/3)

BOP Check SGFP speeds, disch press, flows

Determine SGFP speed control failure

Shift SGFP speed control to Manual; restore program FRV AP

If necessary, take manual control of FRVs and restore SG levels to normal

SRO Refer to ARPs and direct supplementary actions

May cause a Rx trip: Go to next event when directed by NRC

3p-Test No.: 1 Scenario No.: 1 Event No.: 6 Page 1 of 3

Event Description: 18 S/G Feedline Break Inside CTMT

Initiating event: Initiate upon completion of regaining feed control

Time Position Applicant's Actions or Behavior

BOP Respond to annunciators

Recognize problem in CTMT

Increasingfeed flow

Decreasing SG levels

Rapidly rising CTMT Pressure

Annunciators:

- LIQ OR GAS PROC PNL ALARM (MK4)

- l A / I B / l C SG STM FLOW > FEED FLOW (JB1/2/3)

- lA/B/C SG LVL DEV (JF1/2/3)

- CTMT PRESS HI 1 ALERT (EE1)

- CTMT PRESS HI-1 RX TRIP SI (GF1)

- BOP PANELS ALARM (BE3)

- CTMT SUMP LVL HI-HI OR TRBL (PG3 BOP)

- CTMT TO PENE RM AP HI LO (BG5)

- CTMT AIR TEMP HI (BB3)

- CTMT CLR DRN LVL HI (BB1)

I

SRO Direct Rx Trip and Safety Injection and transition to EEP-0

SRO Enter EEP-0, Reactor Trip or Safety Injection

Direct subseauent actions of EEP-0

ROlBOP Perform immediate actions of EEP-0 without reference:

-Check Rx tripped

RTBs & associated bypass bkrs open

NI power falling

Rod bottom lights lit

-Check turbine tripped

- Verify at least one train of 4160 V ESF busses energized

-Check SI actuated

3p-Test No.: 1 Scenario No.: 1 Event No.: 7 Page 2 of 3

-=vent Description: 1B SIG Feedline Break Inside CTMT

Time Position Applicant's Actions or Behavior

Crew -Verify each SW train has 2 SW pumps started

-Verify each train of CCW started

ccw flow > 0

SW Flow > 0

-Verify one Chg pump in each Train Started- amps > 0.

-Verify RHR pumps started amps > 0

-Check HHSl flow > 0 gpm

RCS Press >265

-Verify ctmt vent isolation

Ctmt purge dampers -closed

Mini purge dampers - closed

Stop mini purge supp/exh fan

- Verify ctmt fan cooler alignment

At least one ctmt fan started in slow

Associated emer SW outlet vlv open

- Verify AFW pumps started - amps >O and flow to each SG > 0 gpm

- Verify MFW status

Verify MFW flow control & bypass vlvs closed

Verify both SG feed pumps tripped

Verify SG blowdown isolated

- Check no MSL is0 signal present

- Check that ctmt press has remained c 27 psig

- Verify Phase A ctmt is0

Verify Ph A ctmt is0 actuated

-_ * Check all MLB-2 lights lit. NO - 5.1 & 15.1 Not Lit (MOV8112 &

Critical MOV8100 closed).

Manually close MOV8112 & MOV8100.

- Announce "Unit 1 reactor trip and Safety Injection"

- Verify all Rx trip and bypass bkrs open

-Trip CRDM MG set supply breakers

3p-Test No.: 1 Scenario No.: 1 Event No.: 7 Page 3 of 3

vent Description: 1B S/G Feedline Break Inside CTMT

Position Applicant's Actions or Behavior

CREW

- Check AFW status

Total AFW flow > 395 gpm or any NR level >31%

Control MDAFWP and TDAFWP flow for 31% to 65% NR level

'

When two SG NR levels >28% and TDAFWP not required, stop

TDAFWP

- Verify two trains of ECCS equipment aligned

Bkrs DFOI, DF02, DG15, and DG02 closed

Two trains of battery chargers energized

Two trains of ESF equip aligned

All MLB-1 lights lit

Chg pump suction and discharge vlvs open

All post accident ctmt air mixing fans started

- Secure secondary components

Both heater drain pumps

All but one cond pump

Align backup cooling to cond pumps

- Check RCS avg temp stable at or approaching 547 deg

- Check Pzr PORVs & Spray valves

-Check RCP trip criteria; subcooling > 16 deg

- Monitor chg pump miniflow criteria

- Check SGs not faulted; no SG falling in uncontrolled manner or less than

50 psig

- 1B S/G is faulted. RNO - Go to EEP-2, FAULTED STEAM

GENERATOR ISOLATION

- * Crew should Transition to EEP-2

Zri

SRO Direct transition to EEP-2, Faulted Steam Generator Isolation

_ *_ *Transition to EEP-I .O,

Zritical

- f

__ *Exit EEP-1.O and transition to ESP-I.1, SI TERMINATION

Zritical

7/9/2003

OPERATING TEST 1

SCENARIO 1

Initial Conditions: 100% power, BOL, 2000 MWD, Equilibrium Xenon, A Train O B ,

RCS boron concentration is 1156 ppm.

1B MDAFP tagged out for motor bearing lube schedule. (00s 1 hr.) Expected RTS in 4

hrS.

1A S/G tube leak approximately 20 gpd. Steady for 3 weeks.

R70A, Secondary tube leak detection monitor for the 1A S/G, setpoint raised to 30 gpd.

STPs/Evolutions: Perform STP-20.2, Penetration Room Filtration System Train B

Monthly Operability Test immediately after turnover.

Set in:

1A SG tube leak 20 gpd.

1B MDAFP tagged out.

1B Chg Pump fails to auto start.

MOV 8100/8112 fails to auto close.

Event 1 - Perform STP-20.2, Penetration Room Filtration System Train B Monthly

Operability Test.

Event 2 - 1A SG Atmospheric fails open. Unable to close from MCB. Isolate in MSVR.

Rx power exceeds 100%

Ramp Rx power down in response to failed open atmospheric.

Event 3 - 1A Chg Pump trips. IB Chg Pump fails to auto start (can be manually started).

Event 4 - PT-145 fails low. PK-145 can be manually controlled from MCB.

Event 5 -Feedwater press PT-508 fails high causing SGFPs to roll back to minimum.

Event 6- Feed Line Break inside containment (1 E6).

STP-20.2/UOP-3.l/AOP-14.0/EEP-O/EEP-2/EEP-I/ESP-l. 1

7/9/2003

OPERATING TEST 1

SCENARIO 1

COMMUNICATIONS SHEET

Event 1 - Perform STP-20.2, Penetration Room Filtration System Train B Monthly

Operability Test.

When requested

Rad Man reports: MOV3361B local position is 100% open.

Event 2 - 1A SG Atmospheric fails open.

If asked Report that there is steam coming from the top of the MSVR, cannot tell what it

is from.

When requested to isolate: Ramp manual isolation valve closed 5 min delay, 5 min ramp.

ROVER reports: 1A S/G Atmospheric Relief is manually isolated.

Event 3 -lA Chg pump Trips. 1B Chg fails to auto start.

ROVER reports overcurrent trip on 1A Chg Pump Bkr DF06

Rad Man reports strong insulation smell at pump

Event 4 - PT-145 fails low. PK-145 can be manually controlled from MCB.

Event 5 -Feedwater press PT-508 fails high causing SGFPS to roll back to minimum

Event 6 - Feed Line break inside containment (1E6)

Procedures used:

STP-20.2/UOP-3.1/AOP-l4.0/EEP-O/EEP-2IEEP-1/ESP-l. 1

SHIFT SUPERVISOR RELIEF CHECKSHEET FARLEY NUCLEAR PLANT

UnitNo. ONE

Offgoing Supv. 1 Oncoming ~ u p v . 1O N OD OE

Part I - To be reviewed by the oncoming Supervisor prior to assuming the shift.

Unit Status loo%, BOL, 2000 MWD, Equil. Xenon, A Train on service.

RCS boron concentration is 1156ppm.

STPs/Evolutions (completedin progress/planned)

Perform STP-20.2, Penetration Room Filtration System Train B Monthly

Operability Test immediately after turnover.

General Information and Equipment Status

1B MDAFP is tagged out for motor bearing lube schedule. (00s-1 hour)

Expected RTS in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />

1A S/G has a 20 gpd tube leak. Steadyfor thepast 3 weeks.

R70A Selpoint raised to 30 gpd.

Waste Management Status

LCO Status 3.7.5 Condition B: 1B MDAFP

Night Orders

Part 11 P.O. Logbook, Chemistry Report, Shift Complement, Tag Order Index, reviewed as early in

shift as possible

IXI Part III STP-1.0 P.O. Logbook UOIOATC Logs Keys

reviewedhigned reviewedhitialed reviewedinitialed turned over

IXIYes IXI Yes Yes IXI Yes

OPS-I -1 Rev. 23

Simulator

4/2/2003

Appendix D Scenario Outline Form ES-D-1

Event Malf. No. Event Event

No. Type* Description

0 SNAPSHOTSI EXAM IIC-1 -_.--_- 20.25% EOL, ramping up, A Train on sewice.

0 READ SCENARIO ITST IIC-5 ____._

~

0 ~

PANELS IMCB I 1B MDAFW / CMFI -_.--CONT POWER BREAKER 72 IOPEN

0 PANELS I MCB I 1A CCW Pump I CMF C 1A CCW Pump fails to start. (Must secure 1C CHG & 18 RHR)

I50G (ALL) (OVERLOAD)

0 SYSTEMS I MECH IBOP I1A SIG -_.--Set tube leak = 20 gpd.

0 NA ._____ Tag 1B MDAFW pump

0 Raise setpoint on R-70A _._._Set to 30 gpd

Do not start scenario until data collection is set UP

- marked up

~

1 STP-80.1, 1B DG Operability test N Need to provide STP-80.1 to student

(BOP)

2 1 NIA I R(RO. I RamDto33%Power

3 PANELS I EPB IVA3 C High Temperature alarm on 1 8 DG (DB SO will inform EPB of

(BOP) Annun. on DLCP). (ALARM)

4 SYSTEM IELECTRICAL I120 VAC Dist. C (RO, Open supply breaker to 1A Vital Instrument bus

I12Ov Vital TRN A BOP) (OPEN)

5 IMF IPRESS IPRZR CONT IPT444 I (RO) PT-444 Fails HIGH.

(SetS500; Ramp 5 sec, 0 Delay)

6 Panels / MCB ISI HS IOVERRIDE I I (ALL) lnadveltent SI

contact closed Clear after SI initiated

7 SYS I Mech IRCS IPRZR IBreak Icon M Pzr steam space leak

1 (ALL) 1 JMLPRSl (Set = 250 gpm, Ramp 0, Delay 0)

  • (N)ormal, (R)eactivity, (I)nstrument, . (C)omponent, (M)ajor

Do not reinit simulator until data is downloaded

Aopendix D Operator Actions Form ES-D-2

Op-Test No.: 1 ScenarioNo.: 2 Event No.: 1 Page 1 of 1

Event Description : Perfonn STP-80.1 DG 1B OPERABILITY TEST- (Fast speed start on header #1)

Initiating event: NRC DIRECTION/ Turnover Sheet

Place MSS in Mode 2

Prepare SST - timer

Start DG and time the start

Adjust Voltage and Freq.

Synchronize DG to grid (DG08)

9 Synch switch to MAN

9 Adjust volt / freq

9 Synch scope to 12:00, close DG08

9 Raise load to 50 kw

9 Synch switch to OFF

9 slowly load DG

9RO Ensure board operators take appropriate actions per STP

I

ADDendix D ODerator Actions Form ES-D-2

Op-Test No.: 1 Scenario No.: 2 Event No.: 2 Page 1 of 1

/I

I

Event Description:

Time Position

RamD to 33% Dower

Initiating event: NRC DIRECTION/ turnover sheet

Applicants Actions or Behavior

RO Begin raising turbine load to 33% per UOP-3.1

Monitor plant parameters and start HDPs as necessary

Maintain T a v f l e f matched

SRO Ensure board operators fake proper actions per UOP-3.1

_ _ .~

Form ES-D-2

3p-Test No.: 1 ScenarioNo.: 2 Event No.: 3 Page 1 of 1

Event Description : 1B DG High Lube Oil Temperature

Initiating event: NRC DIRECTION / Annunciator VA3 on EPB

Time Position Applicants Actions or Behavior

BOP Call DBSO to find out alarm status

b DBSO reports Local panel #21 in alarm - LO Temperature High

And that the LO temp is 173°F and increasing slowly.

(DG would trip at 18OOF)

Commence Shutdown of DG IAW STP-80.1

Proceed to step 5.1 1 and complete the following:

b Decrease load on DG

b Adjust VoltIFreq ( not necessary but may be done IAW

procedure)

b Stop DG

b Place in Mode 3 if determined to be INOPERABLE

1 Complete rest of procedure and sign-offs as time allows

Address Tech Spec Operability - 3.8.1 Condition A

Call the following:

b oss

~~

Amendix D Overator Actions Form ES-D-2

Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Page

Event Description: Loss of 1A Vital Instrument Bus -put in before 30% power / P-8 bistables come i

Initiating event: NRC DIRECTION

Time Position Applicant's Actions or Behavior

tO/BOP Recognize failure 1A Vital Instrument Bus

I 1A Inverter amps = 0

Annunciators:

- WDl, 1A INV FAULT

- EC4, SSPS A TRN TRBL

- ECI, PROC CAB PWR FAILURE

- FD3, OP DELTA T AUTOMAN ROD STOP

- FD4, O T DELTA T AUTOMAN ROD STOP

- KG4, TURB TV CLOSED ALERT

- KH5, TUREl AUTO/STOP OIL PRESS LOW

- DF1,LTDN TO DEMW DIVERTED-TEMP HI

- DF2, LTDN DIVERTEED TO RHT- VCT LVL HI

- FD2, PROVERPOWER AUTOMAN ROD STOP

- FC5, PR CH DEV

No amperage on inverter 1A ammeter

Recognize loss of NI-41,31and 35

3R0 Ensure board operators take immediate actions per ARPs

Direct subsequent actions per ARPs

2REW Recognize loss of 1A Vital panel

Secure auto makeup (if makeup was in AUTO, it will start)

Place LCV-115A in VCT position

SRO Notify I&C to determine the cause and correct the fault

Inform OSS of conditions and make recommendations.

Refer to Tech Spec:

3.8.7

~

Amendix D Operator Actions Form ES-D-2

Op-Test No.: 1 Scenario No.: 2 Event No.: 5 Page 1 (

Event Description: P u Pressure Xmtr PT-444 fails HIGH

Initiating event: NRC DIRECTION

~

Applicants Actions or Behavior

- failure of Pu uressure Xmtr PT-444

Recognize

- Both spray valtes open

- PORV PCV-444B opens

Annunciators:

PRZR PORV TEMP HI ( H M )

PZR SAFETY VLV TEMP HI (HA4)

PRZR PRESS HI-LO (HC1)

PRZR CONT PRESS OUTPUT HI (HD3)

PRT TEMP HI IHE3)

REL VLV 444B1445A OPEN (HE1)

Ensure board operators take immediate actions per ARPs

Direct subsequent actions per ARPs

Determine actual Pzr pressure

Attempt to close PORV PCV-444B, then close Block Valve

Take manual control of heaters and spray valves; close spray valves

Monitor actual pressure against DNB LCO (2209 psig)

Return actual pressure to the normal band

Notify I&C to determine the cause and correct the fault

Inform OSS of conditions and make recommendations.

Refer to LCOs 3.3.1 I 8 a, M and b, E

3.3.2 I 1 d, D

3.4.1 and

3.4.11 / B

Amendix D ODerator Actions Form ES-D-2

p-Test No.: 1 ScenarioNo.: 2 Event No.: 6 Page 1 of 3

vent Description: Inadvertent Safety Iniection

iitiating event: NRC DIRECTION

~

Time Position Applicants Actions or Behavior

-

REw Recognize Safety Injection

Reactor trip

RO Enter EEP-0, Reactor Trip or Safety Injection

Direct subseauent actions of EEP-0

<O/BOP Perform immediate actions of EEP-0 without reference:

-Check Rx tripped

RTBs & associated bypass bkrs open

NI power falling

Rod bottom lights lit

- Check turbine tripped

-Verify at least one train of 4160 V ESF busses energized

- Check SI actuated

Crew -Verify each SW train bas 2 SW PUMPS started

-Verify each train CCW - started by CCW & SW Flow

- A CCW PUMP does not start

Crew shouldsecure IC HHSIAND I B RHR Pumus

- Start one Chg pump in each Train - amps > 0

- Verify RHR pump started amps > 0 start 1A RHR wmD

- Check HHSI flow > 0 gpm - yes

- Check RCS press > 265 psig - yes

- Check LHSI flow > 1500 gpm - yes

- Verify ctmt vent isolation

Ctmt purge dampers - closed

Mini purge dampers -closed

Stop mini purge supp/exh fan

- Verify ctmt fan cooler alignment

At least one ctmt fan started in slow

Associated emer SW outlet vlv open

- Verify AFW pumps started - amps >O and flow to each SG > 0 gpm

- Verify MFW status

Verify MFW flow control &bypass vlvs closed

Verify both SG feed pumps tripped

Verify SG blowdown isolated

- Check no MSL is0 signal present

- Check that ctmt press has remained < 27 psig

Appendix D Onerator Actions Form ES-D-2

)p-Test No.: Scenario No.: 2 Event No.: 7 Page 2 of 3

3vent Description: Inadvertent Safety Injection

nitiating event: NRC DIRECTION

__

-

-Time

__

Position _. Actions or Behavior

Applicants

CREW .Verify Phase A ctmt is0

Verify Ph A ctmt is0 actuated

Check all MLB-2 lights lit- Initiate action to make all MLB-1 lights lit

.Announce Unit 1 reactor trip and Safety Injection

- Verify all Rx trip and bypass bkrs open

- Trip CRDM MG set supply breakers

.Check AFW status

Total AFW flow > 395 gpm or any NR level >30%

Control MDAFWP and TDAFWP flow for 30% to 60% NR level

When two SG NR levels >25% and T D m P not required, stop TDAFWP

.Verify two trains of ECCS equipment aligned Align all A Train components

Both trains of SI actuated

Bkrs DFO1, DF02, DG15, & DG02 closed

Two trains of battery chargers energized

Two trains of ESF equip aligned

All MLB-1 lights lit

Chg pump suction and discharge vIvs open

All post accident ctmt air mixing fans stated

- Secure secondary components

Both heater drain pumps

All but one cond pump

Align backup cooling to cond pumps

- Check RCS avg temp stable at or approaching 547 deg

- If heatup is in progress attempt to dump steam to condenser

- If heat up continues, dump steam to atmosphere

- Direct counting room to perform CCP-645, Main Steam Abnormal

Environmental Release.

- Check Pzr pressure & PORVs

PRT parameters

- Check RCP trip criteria; subcooling > 16 deg

- Monitor chg pump miniflow criteria

- Check SGs not faulted; no SG falling in uncontrolled manner or less than 50 psig

- Check SGs not ruptured (Step 27)

_ *_ Secondary rad indication normal - YES

Critical No SG level rising in uncontrolled manner -

  • - Check RCS intact - NO - Ctmt rad in alann / ctmt press increasing

Check Transition criteria to ESP-1.1

~~~

ApDendix D ODerator Actions Form ES-D-2

Op-Test No.: 1 ScenarioNo.: 2 Event No.: 7 Page 3 of 3

Event Description: Pzr Steam Space leak

Initiating event: Immediately upon transition to ESP-1.1

Position Applicants Actions or Behavior

SRO Direct transition to ESP-1.1

Inform OSS of conditions an$ direct cla.;sifications ... . . -.

BOPRO Recognix Sream.space leak/ RCS PRESSUKE FALLING

Recognize transition to ESP-1.2 at step G

CREW

TRANSITION TO ESP-1.2, POST LOCA COOLDOWN AND

DEPRESSURIZATION

- Monitor RWST level

- Verify SI, PHASE A and PHASE B RESET

- Verify 4160 v busses energized

- Check LHSI pumps - STOPPED

- Check Intact SG NR level > 31%, maintain 3165%

- Begin RCS cooldown to cold shutdown

- Using steam dumps

- Cooldown < 100°F in any GO min period

- Block Low steam line pressure SI when P-12 lit

- Check SI in service HHSI flow > 0 gpm

- Turn OFF Pzr heaters

- Check PZR level > 15% - should be SOLID

- Check if a RCP should be stopped

- Stop all but 1 RCP- preferably leave IB RCP running

- Check if one chg pump should be stopped - only 1 running

- Establish Normal charging

- Control RCS pressure by controlling subcooling

Continue with procedure until NRC recommends securinp,

OPERATING TEST 1

SCENARIO 2

Need to sign off SOP-28.1 up to step 4.9.2 :increasinp load to 170 MW

UOP-1.2 Sign off steps 5.36 - 5.40.1,

NA 5.40.2

unsigned 5.40.3,

sign 5.41142143.1 45 and 47,

unsigned 5.43.2

Initial Conditions: 22% power, EOL, Ramping up, A Train O/S

1B MDAFW Pump (placed out of service 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago; expected back in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />)

1 "A"SIG tube leak approximately 20 gpd. Steady for 3 weeks.

R-70A Setpoint has been raised to 30 gpd.

OSS directions are to ramp up at 2 MW/min to 33% and hold for chemistry.

OSS directions are to complete STP-80.1 IMMEDIATELY after turnover.

Set in:

1B MDAFWP Tagged out

1A CCW Pump will trip on overload when started.

Event 1 - Start 1B DG STP-80.1

Event 2 - Ramp to 33% power.

Event 3 - High Temperature on 1B DG LO.

Event 4 - 1A Vital Instrument panel input breaker trips open.

Event 5 - PT-444 fails high.

Event 6 - Inadvertent SI

Event 7 - Pzr Steam Space Leak = 250 gpm

Procedure use-

STP-80.1 / UOP-3.1 / EEP-0 / ESP-1.1 / ESP- 1.2

OPERATING TEST 1

SCENARIO 2

COMMUNICATIONSSHEET

Event 1 - Start 1B DG

DB SO: Communications necessary to start DG. (ie. Check list complete, LO level SAT,

etc.)

Event 2 -Ramp to 33% Power

Event 3 - 1B DG High temperature alarm

DB SO: When called DLCP annunciator #21 in alarm - LO Temperature High

The LO temp is 173'F and increasing slowly.( approx. l"F/min, IFG asked)

Event 4 - 1A 12Ov Vital Instrument panel de-energized.

Rover: Breaker #8 in Regulated AC Distribution Panel 1G is closed

If asked, 1A Vital panel input breaker is tripped open

Rad side SO: FAF5L IS CLOSED

Event 5 - PT-444 Failure

Event 6 - Inadvertent SI

Event 7 - Pzr Steam Space Leak

Procedure use-

STP-80.1 / UOP-3.1 / EEP-0 / ESP-1.1 / ESP- 1.2

SHIFT SUPERVISOR RELIEF CHECKSHEET FARLEY NUCLEAR PLANT

UnitNo. ONE

Date

1A S/G has a 20 gpd tube leak. Steadyfor the past 3 weeks.

R70A Setpoint has been raised to 30 gpd.

Waste Management Status

LCO Status 3.7.5 Condition B: I B MDAFP

Night Orders

Part 11 P.O. Logbook, Chemistry Report, Shift Complement, Tag Order Index, reviewed as early in

shift as possible

Part III STP- 1.O P.O. Logbook UOIOATC Logs Keys

reviewedsigned reviewedinitialed reviewedinitialed turned over

Yes [XI Yes IXI Yes IXI Yes

OPS-1-2 Rev. 23

Simulator

Appendix D Operator Actions Form ES-D-2

Appendix D Scenario Outline Form ES-D-1

Facility: Farlev Scenario NO.:^ Op-Test No.: 1

Examiners: Operators: SRO

RO

BOP

Objective: Evaluate applicant response to an ATWT event with a failure of ALL AFW pumps to Auto-start

Initial Conditions: [IC-9) 100%. EOL, 15000 MWD. Eauil Xenon, A Train on service. Boron Concentration is

211 ppm.

Turnover: Decrease Load to 60% power to remove I A SGFP from service.

1B MDAFP 00s for motor lube schedule (00s I hr. Expected RTS 4 hrs).

EventN Malf. No. Event Event

Type* Description

0 SNAPSHOTS I TRN I EOL I IC- 9 ._.__. 100% EOL, 15000 MWD, Equil. Xenon, A Train on service.

0 READ SCENARIO / TST I IC- 6 _.._..

0 PANELS I MCB I 1B MDAFW I CMF I ._.._ CONT POWER BREAKER 72 I OPEN

0 PANELS I MCB I TDAFWP I CMF I __._LEFT AND RIGHT MR 11 CONTACT I OPEN

(TDAFP fails to auto start)

0 PANELS I MCB / 1A MDAFWP I CMF I C 1A MDAFWP trips on overcurrent when started

50G (ALL) (OVERLOAD)

0 PANELS / MCB I 1B EH PUMP I CMF I ._.._ 63X CONTACT I OPEN

(1B EH Pump fails to AUTO start. Can be started manually.)

0 PANELS I MCB I RX TRIP BREAKERS I RT52A AND RT52B / CLOSED

CMF I (Fail A M B reactor trip breakers closed)

0

0

PANELS I MCB I 1A CRDM MG SET I

CMF I

PANELS / MCB I PCV 445A I CMF I

I C C

BRK TRIP BOX / Fail

1A CRDM MG SET fails to trip.

PORV fails to close when opened.

OPTIONS I MECH I STICK (Set = 100, Ramp 0, Delay 0, Link to RRC445A > 0.9)

0 1B MDAFW pump ._. Place HOLD tag on HS

Amendix D ODerator Actions Form ES-D-2

Do not start scenario until data collection is set up

1 Swap air ejectors Swap air ejectors

2 IMFIPRESSUREISTM HDR / PT-464 PT-464 slowlv fails hiah (Set = 1200. 60 sec RamD. 0 Delav)

3 SYS / MECH IRCS I LETDOWN ILEAK Letdown HX Leak

ICON OC (Set = lo%, Ramp 0, Delay 0)

4 lMF/ PRESSURE/ PRZR CONTl PT-445 Xmtr Fails HIGH. PORV fails to close. Block valve can be

PT-445 manually closed) ( (Sek2500; Ramp 0, Delay 0)

5 Ramp Ax power down to 60% power to remove 1A SGFP from

setvic:p

6 PANELS IMCB / 1A EH PUMP ICMF I 1A EH pump has degraded head. 1B does not auto start. (Can be

options Imech IDegraded head manually started). @E%, 30 sec ramp)

6 Bring KG1 into alarm after it has come in

and cleared due to starting 1 6 EH pump

When desired ramp is reached m, bring into alarm KG1

PANELS IMCB IANNUN KG1 (ALARM)

TB SO reDorts leak on 1A SGFP.

6 PANELS IMCB / ANNUN KG2 5 minutes after reporting leaklmakeup commenced, bring into alarm

KG2.

TB SO reDorts leak getting worse. Need more EH Fluid.

PANELS / MCB I1B EH PUMP ICMF / WHEN directed and rapid ramp has started, trip 1 B EH pump

600V BKR 52 (OPEN)

7 Failure of Rx to TRIP either Auto or M Already in scenario

manually (ALL)

ment, (M)ajor

Do not reinit simulator until data is downloaded

ADpendix D Ooerator Actions Form ES-D-2

OpTest No.: 1 Scenario No.: 3 Event No.: 1 Page 1 of 1

Event Description: Swap SJAEs

Initiating event: turnover sheet

-

I

Time Position Applicant's Actions or Behavior

BOP Station appropriate personnel at SJAEs

Open the SJAE isolation valves on MCB

I Have SO check valves, etc

Close SJAE isolation valves on MCB

Monitor condenser vacuum

SRO Review ARPs KKI and KK2

~ ~~ ~

ADuendix D Ouerator Actions Form ES-D-2

Ip-Test No.: 1 Scenario No.: 3 Event No.: 2 Page 1 of 1

vent Description: PT-464 fails Hiah (SGFPs roll UD to maximum SDeed)

Initiating event: NRC Direction

Time Position Applicant's Actions or Behavior

Recognize indications of SGFP speed control failure

- Increase in SGFP speeds, flow

- FRV Position decreases to a minimum position

Annunciators:

- 1NWC SG LVL DEV (JF1/2/3)

BOP Check SGFP speeds, disch press, flows

Determine SGFP speed control failure

Shift SGFP speed control to Manual: restore program FRV AP

If necessary, take manual control of FRVs and restore SG levels to normal

SRO Refer to ARPs and direct supplementary actions

~~

Aumndix D Ouerator Actions Form ES-D-2

Ip-Test No.: 1 Scenario No.: 3 Event No.: 3 Page 1

vent Description: Small Letdown Hx leak >10 a m

- lnitiatinq event: NRC Direction

-Time Position

RO R17 6 in alarm

Applicant's Actions or Behavior

Notice rise in CCW surge tank level

Notice drop in Letdown flow

Notice drop in Chg flow

Isolate letdown, Place Excess letdown OIS IAW AOP-16.0 or SOP-2.1

ANNUNCIATORS:

RMS Hi RAD (FH1)

CCW SRG TK LVL A (6)TRN HI -LO (AA4, AB4)

SRO Direct Placing Excess letdown O/S IAW AOP-16.0 or SOP-2.1

Notify OSS

-

Appendix D ODerator Actions Form ES-D-2

3p-Test No.: 1 Scenario No.: 3 Event No.: 4 Page 1 of 1

vent Description: PT-445 Fails Hiah

lnitiatina event: NRC Direction

Time Position Applicant's Actions or Behavior

SRO Direct crew to r a m to c 100% IAW UOP-3.1

Recognize failure of Pzr pressure Xmtr PT-445

- Both spray valves open

- PORV PCV-445A opens

Annunciators:

PRZR PORV TEMP HI (HA5)

PZR SAFETY VLV TEMP HI (HA4)

PRZR PRESS HI-LO (HCI)

PRT TEMP HI (HE3)

REL VLV 44481445A OPEN 1HEI)

PRZRPRESS REL VLV 445A OR BIU HTRS ON (HD1)

~

SRO Ensure board operators take immediate actions per ARPs

Direct subsequent actions per ARPs

RO Determine actual Pzr pressure

Attempt to close PORV PCV-445A, then close Block Valve

Monitor actual pressure against DNB LCO (2209 psig)

Return actual pressure to the normal band

SRO Notify I&C to determine the cause and correct the fault

Inform OSS of conditions and make recommendations

Refer to LCOs 3.3.1 18 a, M and b, E

3.3.2 I 1 d, D

3.4.land

3.4.1 1I B

~

ADDendix D ODerator Actions Form ES-D-2

Op-Test No.: A Scenario No.: 3 Event No.: 5 Page 1 of 1

Event Description: RamD Rx Dower down to 60% Dower.

Initiating event: NRC direction / OSS phone call to remove 1A SGFP from

service

Time Position Applicants Actions or Behavior

SRO Direct crew to ramp to 60% IAW UOP-3.1

RO Control Reactor

Tavenref

Rods

BOP Set in ramp per UOP-3.1

Select target and ramp rate

DEH to G O

Op-Test No.: 1 Scenario No.: 3 Event No.: 6 Page 1 of 2

Event Description: Event Description: 1A EH FLUID PUMP has deqraded head

Initiating event: NRC DIRECTION

Applicant's Actions or Behavior

Recognize indications of 1A EH Fluid pump HEAD DEGRADATION:

- Lowering pressure of EH Fluid system

- Possible turbine throttle and governor valves going shut

Possible SGFP trip Annunciators:

- DEH TRBL (LBl)

- EH FLUID SYS TRBL (KG1)

Ensure conditions return to normal

Ensure board operators take ARP actions and start the 1B EH fluid pump.

Amendix D Ouerator Actions Form ES-D-2

Op-Test No.: 1 Scenario No.: 3 Event No.: 6 Page 2 of 2

Event Description: EH FLUID LEAK- annunciator KG1 in alarm

Initiating event: When directed by NRC

Time Position Applicant's Actions or Behavior

BOP Recognize annunciator in alarm

BOP Upon receiving call from TB SO report to SRO conditions of losing EH fluid

from 1A SGFP and make up to the EH System is in progress, maintaining

level steady at present.

Bring KG2 into alarm per NRC signal to initiate Rapid Ramp.

I I

SRO Evaluate situation and order ramp to 60%, then take 1A SGFP out of selvice

and isolate leak.

- Enter AOP - 17, RAPID LOAD REDUCTION

- may enter AOP-13, LOSS OF SGFP ramp would be very quick.

CREW Co-ordinate to ramp unit to 60% per AOP-17.

. - Auto rodcontrol

- Reduce turbine load at desired rate

- Maintain TavgKref wh 5 deg F

- Maintain Delta I w/i limits

- Control SGWL

- Przrlevel

- Pressure within limits.

I I

Go to next event when NRC directs: ie enough of Rapid Ramp complete

I

Auoendix D Ouerator Actions Form ES-D-2

Op-Test No.: A Scenario No.: 3 Event No.: 7 Page 1 of 4

Event Description: 1B EH FLUID PUMP TRiPS

Initiating event: when unit has been ramoed down and KG2 is in alarm as

directed by NRC

E Position Applicant's Actions or Behavior

BOP Recognize annunciator KG2 in alarm

- EH FLUID LEVEL LO-LO (KG2)

Recognize indications of 1B EH Fluid pump tripping:

- Lowering pressure of EH Fluid system

- Possible turbine throttle and governor valves going shut

- Possible SGFP trip

Annunciators:

- DEH TRBL (LB1)

- EH FLUID SYS TRBL (KG1)

- TURB AUTO STOP OIL TURB TRIP (GH2)RX TRIP CAUSED BY

TURBTRIP (GF4)

SRO Ensure board operators take Immediate actions of EEP-0

- Turbine trio without a Reactor Trio

- Direct trio of Reactor - botn handsw tches

- Direct trio of CRDM MG sets SUDP~Vbreaders

ROIBOP Perform immediate actions of EEP-0 without reference:

- Check Rx triDDed

RTB's & associated bypass bkrs open

NI power falling

Rod bottom lights lit

- Trip of Reactor - both handswitches

- * - Trio of CRDM MG sets SUDD~V . . breakers

~

Critical * Enter FRP-S.1

Drive rods in AUTO (>48 spm) or MANUAL

- CREW - Check turbine tripped

- * Verifv AFW ournos runninq (TDAFW PUMP will not AUTO start)

Critical

- * Emergency Borate

- - Establish adequate charging fiow/letdown flow

Critical - Verify containment ventilation isolated

- Check Rx trip brkers open - call for Rover to open -(wait 3 min. from

call)

- Check turbine stop valves closed

- Monitor CST level

- Check S/G levels > 31%

- Verify dilution flow paths isolated

- Check for uncontrolled cooldown

- Check S/G's not faulted

- Check CETC's < 1200 deg F

- Check if Rx critical

- Transition to EEP-0

Amendix D Operator Actions Form ES-D-2

Event Description: ATWT- 1A EH FLUID PUMP TRIPS

-

lnitiatina event: when unit has been ramped down and KG2 is in alarm as

directed by NRC

Position Applicant's Actions or Behavior

E-Enter EEP-0

erform actions of EEP-0:

CREW

Check Rx tripped

RTBs & associated bypass bkrs open

NI power falling

Rod bottom lights lit

Check turbine tripped

Verify at least one train of 4160 V ESF busses energized

Check SI actuated Direct subsequent actions of EEP-0

rew may not have a Safety Injection signal. If NOT, transition

hould be made to ESP-0.1

Check Rx tripped

RTBs & associated bypass bkrs open

NI power falling

Rod bottom lights lit

Check turbine tripped

Verify at least one train of 4160 V ESF busses energized

heck SI actuated Direct subsequent actions of EEP-0

Verify one CHG PUMP in each train started -amps > 0

Verify at least one RHR pump started - amps > 0

Check SI flow

- HHSl FLOW > 0 gpm

- RCS pressure e 265 psig

- LHSl flow >1500 gpm

Verify ctmt vent isolation

Ctmt purge dampers - closed

-

Mini purge dampers closed

Stop mini purge supplexh fan

Verify ctmt fan cooler alignment

At least one ctmt fan started in slow

ssociated emer SW outlet vlv open

Verify at least one SW train has 2 SW pumps started

Verify at least one CCW pump started

Verify AFW flow to each SG > 0 gpm and amps >O

Check TDAFWP start required

erify MFW status

Verify MFW flow control & bypass vlvs closed

Verify both SG feed pumps tripped

Verify SG blowdown isolated

heck no MSL is0 signal present - if present MSIV's need to be manually

osed

heck that ctmt press has remained e 27 psig

~~~

Auoendix D Operator Actions Form ES-D-2

lp-Test No.: A Scenario No.: 3 Event No.: 7 Page 3 of 4

ivent Description: ATWT- 1A EH FLUID PUMP TRIPS

Initiating event: when unit has been ramped down and KG2 is in alarm as

directed bv NRC

=

Time Position Applicant's Actions or Behavior

=

REW -Verify Phase A ctmt is0

Verify Ph A ctmt is0 actuated

Check all MLB-2 lights lit

- Announce "Unit 1 reactor trip and Safety Injection"

- Verify all Fix trip and bypass bkrs open

- Trip CRDM MG set supply breakers

- Check AFW status

Total AFW flow > 395 gpm or any NR level >30%

Control MDAFWP and TDAFWP flow for 30% to 60% NR level

When two SG NR levels 225% and TDAFWP not required, stop TDAFWP

- Verify two trains of ECCS equipment aligned

Both trains of SI actuated

Bkrs DFOl, DF02, DG15, & DG02 closed

Two trains of battery chargers energized

Two trains of ESF equip aligned

All MLB-1 lights lit

Two SW pumps running in both SW trains

Chg pump suction and discharge vlvs open

All post accident ctmt air mixing fans started

- Secure secondary components

Both heater drain pumps

All but one cond pump

Align backup cooling to cond pumps

-Check RCS avg temp stable at or approaching 547 deg RNO

- Verify stm dumps closed.

- Atmospherics closed

- Isolate TB loads

- Minimize AFW flow

- Close MSIV's

-Check Pzr pressure

- Check RCP trip criteria: subcooling > 16 deg

- Monitor chg pump miniflow criteria

Amendix D ODerator Actions Form ES-D-2

1 Op-Test No.: A Scenario No.: 3 Event No.: 7

Time Position Applicant's Actions or Behavior

CREW Check SGs not faulted; no SG falling in uncontrolled manner or less than 50

psig

-- SRO Direct Transition to ESP-1.1

-

Critical Update and Inform OSS of plant conditions

7/9/2003

OPERATING TEST 1

SCENARIO 3

Initial Conditions: 100% power, EOL, 15000 MWD, Equilibrium Xenon, A Train O/S,

RCS boron concentration is 21 1 ppm.

1B MDAFP tagged out for motor bearing lube schedule. (00s 1 hr.) Expected RTS in 4

hS.

STPs/Evolutions:

Expect to ramp down to remove 1A SGFP from service this shift to clean the LO

strainer.

SwapSJAEs

Set in:

1B MDAFP tagged out.

TDAFWP FAILS TO AUTOSTART

1B EH Fluid pump fails to auto start.

Rx trip breakers fails to open

1A CRDM MG set breaker fails to trip

PCV-445A sticks open when it lifts.

Event 1 - Swap SJAEs

Event 2 - PT-464 fails high

Event 3 -Letdown Heat exchanger leak.

Event 4 - PT-445 fails high. PORV will stick open.

Event 5 -Ramp down to remove 1A SGFP from service UOP-3.1

Event 6 - EH Fluid pump degraded head

Event 6 - EH Fluid leak on 1A SGFP to include losing EH Fluid level and Fast ramp.

Event 7 -lB EH pump trip - ATWT event. FRP-S.1

Procedures used:

SOP-28.5/SOP-2.1or AOP-l6/UOP-3.l/AOP-l7.0/EEP-O/FRP-S. l/EEP-O/ESP-1.lor

ESP-0.1

OPERATING TEST 1

SCENARIO 3

COMMUNICATIONS SHEET

Event 1 - Swap SJAEs

Event 2 - PT-464 fails high

If requested:

TB Man reports: Both SGFPs are running at approx. 3500 rpm.

Event 3 - Letdown Heat exchanger leak.

ROVER reports: The CCW surge tank vents are closed.

Event 4 - PT-445 fails high

Event 5 - Ramp down to remove 1A SGFP from service UOP-3.1

Event 6 - EH Fluid pump degraded head

TB Man reports: There is a leak on the 1A SGFP.

Event 6 -

TB Man reports: I am making up to the EH reservoir.

Later report: The leak is getting worse. Leak can be isolated if SGFP taken off line.

Event 7 - 1B EH pump trips ATWT event. FRP-S.1

Procedures used:

SOP-28.5/SOP-2.1 or AOP- 16/UOP-3.UAOP- 17.0/EEP-O/FRP-S.I/EEP-O/ESP-1.l or

ESP-0.1

SHIFT SUPERVISOR RELIEF CHECKSHEET FARLEY NUCLEAR PLANT

Unit No. ONE

Offgoing Supv. Oncoming Supv. ON OD OE

Date

RCS boron concentration is 211 ppm.

STPs/Evolutions (completedhn progress/planned)

Swap on service sections of both SJAEs immediately after shift turnover

for Engineering Support testing

Expect to remove 1A SGFPfrom service to clean the lube oil strainer later

in shift.

General Information and Equipment Status

1B MDAFP is tagged out for motor bearing lube schedule. (00s-1 hour)

Expected RTS in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />

~

Waste Management Status

LCO Status 3.7.5 Condition B: 1B MDAFP

Night Orders

[XI Part 11 P.O. Logbook, Chemistry Report, Shift Complement, Tag Order Index, reviewed as early in

shift as possible

Part 111 STP- 1 .O P.O. Logbook UOIOATC Logs Keys

reviewedisigned reviewedhnitialed reviewedinitialed turned over

[XI Yes [XI Yes [XI Yes [XI Yes

OPS-1-3 Rev. 23

Simulator