June 2003 Monthly Operating Report for Palo Verde Units 1, 2 & 3
ML032020212
Person / Time
Site: Palo Verde  
Issue date: 07/10/2003
From: Danni Smith
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
219-02858-DMS/JMM
Download: ML032020212 (5)


Text

10.'7 A subsidiaty of Pinnace West Capital Corporation David M. Smith Operations Director Palo Verde Nuclear Generating Station Tel. 602-393-2656 Fax 602-393-1806 e-mail:

David M Smith(apsc.com Mail Station 7294 PO Box 52034 Phoenix, Arizona 85072-2034 July 10, 2003 21 9-02858-DMS/JMM U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-52815291530 Monthly Operating Reports for JUNE 2003 Enclosed are the Monthly Operating Reports for JUNE 2003, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.

If you have any questions, please contact Judy Mellody at (623) 393-6422.

Sicrely, DMS/JMM/mb

Enclosures:

JUNE 2003 Monthly Operating Reports cc:

E. W. Merschoff PVNGS Resident Inspector INPO Records Center Utility Data Institute (all w/enclosures) 9)4

Page Two NRC Monthly Operating Report Distribution List 219-02858-DMS/JMM July 10, 2003 k

bcc:

J. E. Orsborn M. Van Dop J.

Simpkins D. L. Sills G. R. Overbeck File Copy C. D. Mauldin M. K. Banks C. R. Emmett D. G. Marks C. K. Seaman B. J. Hansen C. L. Jury J. E. McDonald S. M. Foote J. M. Levine W. L. Stewart (3146) (all w/enclosures)

(7512)

(7512)

(7565)

(7602)

(7602)

(7605)

(7615)

(7615)

(7636)

(7636)

(7693)

(8983)

(8508)

(8508)

(9046)

(9082)

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-528 PVNGS-1 07/10/03 J. M. Mellodv (623) 393-6422 Reporting Period:

June 2003

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

1243 3.

4.

5.

6.

Unit I Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 720.0 4,241.8 118,403.0 Hours Generator was On-Line 720.0 4,232.8 117,016.2 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 891,377 5,228,822 140,897,406 UNIT SHUTDOWNS Outage Duration Hours Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No.

Date Type1 Reason2 No reactor shutdowns occurred during the month of June 2003.

1F-Forced S-Scheduled 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-529 PVNGS-2 07/10/03 J. M. Mellody (623) 393-6422 Reporting Period:

June 2003

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

1243 3.

4.

5.

6.

Unit 2 Generating Statistics This Month Yr. To Date Cumulative Hours Reactor was Critical 720.0 4,344.0 118,255.5 Hours Generator was On-Line 720.0 4,344.0 116,923.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 908,380 5,508,039 142,451,720 UNIT SHUTDOWNS Outage Duration Hours Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No.

Date Type1 Reason2 No reactor shutdowns occurred during the month of June 2003.

IF-Forced S-Scheduled 2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip I Scram 4-Continuation 5-Other-(Explain)

SUMMARY

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-530 PVNGS-3 07/10/03 J. M. Mellodv (623) 393-6422 Reporting Period:

June 2003

1.

Design Electrical Rating (Net MWe):

1269

2.

Maximum Dependable Capacity (Net MWe):

1247 3.

4.

5.

6.

Unit 3 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 669.8 3,525.9 113,709.6 Hours Generator was On-Line 637.0 3,471.6 112,667.5 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 699,688 4,232,342 137,739,501 UNIT SHUTDOWNS Outage Duration Hours Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No.

Date Typel Reason2 03-02 06/18/03 S

83.1 B

1 Manual RX trip for repairs to AR piping.

IF-Forced S-Scheduled 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY