June 2003 Monthly Operating Report for Watts Bar Nuclear Plant
ML032020113
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 07/15/2003
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML032020113 (5)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 jUL 1 5.2003 U.S. Nuclear Regulatory Comission ATTN:

Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket No.

50-390 Tennessee Valley Authority WATTS BAR NUCLEAR PLANT (WBN)

JUNE 2003 MONTHLY OPERATING REPORT Enclosed is the June 2003 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4.

There are no regulatory conunitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.

Sincerely, P.

L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc:

See page 2 Printed n ecyded pW

U.S. Nuclear Regulatory Commission Page 2 JUL 15 2003 cc (Enclosure):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. K. N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Ms. M. H. Chernoff, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)

MONTHLY OPERATING REPORT JUNE 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1

OPERATING DATA REPORT Docket No.

50-390 Unit Name:

WBN Unit 1 Date:

July 9, 2003 Completed By:

P. P. Salkeld Telephone:

(423) 365-3635 Reporting Period:

June 2003

1. Design Electrical Rating (MWe-Net):

1155

2.

Maximum Dependable Capacity (MWe-Net):

1125 Month

3.

Number of Hours Reactor was Critical 720

4.

Hours Generator On-Line 720

5.

Unit Reserve Shutdown Hours 0.0

6.

Net Electrical Energy Generated (MWh) 815140 Year-to-Date 4219 4202 0.0 4841681 Cumulative 57385 57102 0.0 63307749 E-2

UNIT SHUTDOWNS DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-390 WBN-1 July 9, 2003 P. P. Salkeld (423) 365-3635

'F: Forced S: Scheduled 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-C)peratcr Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain) 4 Istructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(N EG - 1022)

Sumnunary: WBN Unit 1 operated at or near 100% power for the month of June 2003. There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month.

E-3