ML031970439
| ML031970439 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 07/10/2003 |
| From: | Baucom C Progress Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RNP-RA/03-0085, TRM 6.2 | |
| Download: ML031970439 (3) | |
Text
TS 5.6.4 TRM 6.2 Cj Progress Energy Serial: RNP-RA/03-0085 JUL 1 0 2003 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 MONTHLY OPERATING REPORT Ladies and Gentlemen:
In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications (TS) Section 5.6.4, "Monthly Operating Reports," and HBRSEP, Unit No. 2, Technical Requirements Manual (TRM) Section 6.2, "Monthly Operating Report," Progress Energy Carolinas, Inc., submits the attached report of operating statistics and shutdown experience for the month of June 2003.
If you have any questions concerning this matter, please contact me.
Sincerely, C. T. Baucom Supervisor - Licensing/Regulatory Programs CTB/jwv Attachment c:
NRC Resident Inspector, HBRSEP L. A. Reyes, NRC, Region II C. P. Patel, NRC, NRR Progress Energy Carolinas. Inc.
Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550 a)5a
Attachment to Serial: RNP-RA/03-0085 Page 1 of 2 MONTHLY OPERATING REPORT DOCKET NO. 050-0261 UNIT H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP). UNIT NO. 2 DATE 717/2003 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: JUNE 2003 1.
2.
DESIGN ELECTRICAL RATING (NET MWE):
MAX DEPENDABLE CAPACITY (NET MWE):
765 710 THIS MONTH YRTO DATE 4343.0 4343.0 0.00 3214138.00 3.
4.
5.
6.
NUMBER OF HOURS REACTOR CRITICAL HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELEC. ENERGY GENERATED (MWH) 720.00 720.00 0.00 522429.00 CUMULATIVE 216140.99 212821.26 23.20 139151596.00
Attachment to Serial: RNP-RA/03-0085 Page 2 of 2 DOCKET NO. 050-0261 UNIT NAME HBRSEP, UNIT NO. 2 DATE 7/07/03 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: JUNE 2003 No.
Date Type Duration Reason1 Method of Shutting Down Cause / Corrective Actions / Comments F: Forced (Hours) the Reactor or Reducing Power2 6: Scheduled t
2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Ucense Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation 5-Other (Explain)
SUMMARY
- The unit operated at approximately full power for the entire month.