Letter Sequence Approval |
---|
|
|
MONTHYEARML0319601302003-08-28028 August 2003 Issuance of Amendment Nos. 217 & 211, Respectively, Revising the Licensing Basis as Described in the Updated Safety Analysis Report Project stage: Approval 2003-08-28
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000254/20230042024-02-0505 February 2024 Integrated Inspection Report 05000254/2023004 and 05000265/2023004 ML24004A0052024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0042 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval IR 05000254/20234032023-12-22022 December 2023 Public- Quad Cities Nuclear Power Station Security Baseline Inspection Report 05000254/2023403 and 05000265/2023403 IR 05000254/20230102023-12-20020 December 2023 Comprehensive Engineering Team Inspection Report 05000254/2023010 and 05000265/2023010 ML23349A1622023-12-17017 December 2023 Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days ML23339A1762023-12-0505 December 2023 Notification of NRC Baseline Inspection and Request for Information (05000265/2024001) ML23319A3342023-11-20020 November 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2 and 10 CFR 50.69 RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000254/20230032023-11-0909 November 2023 Integrated Inspection Report 05000254/2023003 and 05000265/2023003 RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23206A0382023-09-21021 September 2023 Proposed Alternative to the Requirements of the ASME Code IR 05000254/20230112023-09-20020 September 2023 Safety-Conscious Work Environment Issue of Concern Team Inspection Report 05000254/2023011 and 05000265/2023011 RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval SVP-23-038, Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities2023-08-14014 August 2023 Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities IR 05000254/20230022023-08-0808 August 2023 Integrated Inspection Report 05000254/2023002 and 05000265/2023002 ML23178A0742023-08-0707 August 2023 Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location ML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI ML23216A0562023-08-0404 August 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 SVP-23-031, Regulatory Commitment Change Summary Report2023-07-14014 July 2023 Regulatory Commitment Change Summary Report ML23181A1062023-06-30030 June 2023 Postponement- Information Meeting (Open House) with a Question-And-Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23179A1932023-06-28028 June 2023 07122023 Letter-Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Quad Cities Nuclear Plant for Performance for 2022 Calendar Year IR 05000254/20234012023-06-26026 June 2023 Cyber Security Inspection Report 05000254/2023401 and 05000265/2023401 IR 05000265/20230402023-06-22022 June 2023 Reissue Quad Cities Nuclear Power Station 95001 Supplemental Inspection Supplemental Report 05000265/2023040 and Follow Up Assessment Letter RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23167B1722023-06-16016 June 2023 95001 Supplemental Inspection Report 05000265/2023040 and Follow-Up Assessment Letter RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23144A3632023-05-26026 May 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23033A4042023-05-15015 May 2023 Exemption from the Requirements of 10 CFR Part 2, Section 2.109(B) Related to Submission of Subsequent License Renewal Application Letter IR 05000254/20234022023-05-15015 May 2023 Security Baseline and ISFSI Inspection Reports 05000254/2023402, 05000265/2023402, 07200053/2023401 ML23132A2022023-05-12012 May 2023 Annual Radiological Environmental Operating Report ML23125A0612023-05-0808 May 2023 Proposed Alternative to the Requirements of the ASME Code IR 05000254/20230012023-05-0808 May 2023 Integrated Report 05000254/2023001 and 05000265/2023001 RS-22-067, 10 CFR 50.46 Annual Report2023-05-0404 May 2023 10 CFR 50.46 Annual Report ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell SVP-23-018, Radioactive Effluent Release Report for 20222023-04-28028 April 2023 Radioactive Effluent Release Report for 2022 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23110A0622023-04-25025 April 2023 Transmittal of Final Quad Cities Nuclear Power Plant, Unit 1 Accident Sequence Precursor Report (Licensee Event Report 254-2022-001) ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration 2024-02-05
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23349A1622023-12-17017 December 2023 Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23178A0742023-08-0707 August 2023 Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML22347A2412023-02-0606 February 2023 Issuance of Amendment Nos. 294 and 290 Control Rod Scram Times (Public) - ML22298A0022022-12-15015 December 2022 Issuance of Amendment Nos. 293 and 289 Transition to GNF3 Fuel (EPID L-2021-LLA-0159) (Public) ML22217A0442022-12-0707 December 2022 Issuance of Amendment Nos. 292 and 288 Control Rod Scram Times ML22308A1602022-12-0202 December 2022 Issuance of Amendment Nos. 291 and 287 New Fuel Vault and Spent Fuel Storage Pool Criticality Methodologies ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21307A3422021-12-0707 December 2021 Issuance of Amendments to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) ML21301A2192021-11-10010 November 2021 Request for Withholding Information from Public Disclosure for Quad Cities Nuclear Power Station, Units 1 and 2 License Amendment Request Regarding Transition to GNF3 Fuel ML21301A2202021-11-10010 November 2021 Request for Withholding Information from Public Disclosure for Quad Cities Nuclear Power Station, Units 1 and 2 License Amendment Request Regarding Transition to GNF3 Fuel ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20150A3282020-06-26026 June 2020 Issuance of Amendment Nos. 281 and 277 to Increase Allowable Main Steam Isolation Leakage ML20094F8332020-04-0909 April 2020 Issuance of Amendment No. 276, Revise Technical Specification 3.6.1.3 Related to Increased Allowed Main Steam Isolation Valve Leakage (Emergency Circumstances) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML19301A3392019-12-0404 December 2019 Issuance of Amendments to Revise Technical Specification 2.1.1, Reactor Core Safety Limits, the Minimum Critical Power Ration Safety Limits ML19266A5272019-10-0808 October 2019 Issuance of Amendments to Eliminate Second Completion Times from Technical Specifications RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control2019-06-14014 June 2019 Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control ML18353A2292019-01-28028 January 2019 Issuance of Amendment Nos. 273 and 268 Regarding Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18254A3672018-10-29029 October 2018 County 1 & 2; and Quad Cities 1 & 2 - Issuance of Amendments 220, 259, 252, 231, 217, 271 and 266 to Revise Technical Specification Requirements for Inoperable Snubbers ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML17311A1622017-12-0101 December 2017 Issuance of Amendments Regarding Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17073A0672017-05-26026 May 2017 Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) ML17037D2122017-02-16016 February 2017 Issuance of Amendments to Revise Surveillance Requirement for Secondary Containment Access Doors ML16218A4852016-10-20020 October 2016 DNPS Unit Nos. 2 and 3, QCNPS Unit Nos. 1 and 2 - Issuance of LAR to Renewed Facility Operating License Nos. DPR-19, 25, 29, 30 TS Revision to Support Areva Atrium 10XM Fuel Transition ML16231A1312016-10-17017 October 2016 Issuance of Amendments Regarding Spent Fuel Pool Criticality Methodology for Fuel Channel Bow/Bulge (Cac. Nos. MF7160 and MF7161) RS-16-133, Certification of Permanent Cessation of Power Operations2016-06-20020 June 2016 Certification of Permanent Cessation of Power Operations ML16111A1042016-05-11011 May 2016 Issuance of Amendments to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core SLs (CAC Nos. MF6640-MF6644) ML15324A4392015-12-17017 December 2015 Issuance of Amendments (CAC Nos. MF5471-MF5476) ML15183A3512015-08-0505 August 2015 Issuance of Amendments Concerning Adding Topical References to Technical Specifications (TAC Nos. MF3359, MF3363, MF3361, and MF3362)(RS-13-288) ML15153A2822015-07-30030 July 2015 Issuance of Amendments Revising the Completion Date for Milestone 8 of the Cyber Security Plan (TAC Nos. MF4728, MF4729, MF4730, MF4731, MF4732, MF4733, MF4734, MF4735, MF4736, MF4737, MF4738, MF4739, MF4740 ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML15114A1882015-06-19019 June 2015 Issuance of Amendments Adoption of Technical Specification Task Force (TSTF) Traveler-523, Generic Letter 2008-01, Managing Gas Accumulation ML15106A9472015-04-24024 April 2015 Correction to Amendments Regarding Battery Surveillance Requirements (TAC Nos. MF4589 and MF4590) ML14323A5222015-04-0808 April 2015 Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training ML15056A7722015-03-30030 March 2015 Issuance of Amendments Regarding 2023-08-07
[Table view] Category:Safety Evaluation
MONTHYEARML23349A1622023-12-17017 December 2023 Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23206A0382023-09-21021 September 2023 Proposed Alternative to the Requirements of the ASME Code ML23178A0742023-08-0707 August 2023 Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location ML23125A0612023-05-0808 May 2023 Proposed Alternative to the Requirements of the ASME Code ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23041A4262023-02-14014 February 2023 Proposed Alternative to the Requirements of the ASME OM Code ML22347A2412023-02-0606 February 2023 Issuance of Amendment Nos. 294 and 290 Control Rod Scram Times (Public) - ML22332A5492022-12-21021 December 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22298A0022022-12-15015 December 2022 Issuance of Amendment Nos. 293 and 289 Transition to GNF3 Fuel (EPID L-2021-LLA-0159) (Public) ML22217A0442022-12-0707 December 2022 Issuance of Amendment Nos. 292 and 288 Control Rod Scram Times ML22308A1602022-12-0202 December 2022 Issuance of Amendment Nos. 291 and 287 New Fuel Vault and Spent Fuel Storage Pool Criticality Methodologies ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22311A0032022-11-0909 November 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22256A1152022-09-29029 September 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22265A0862022-09-28028 September 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22264A1752022-09-28028 September 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22094A0012022-04-15015 April 2022 Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21267A3172021-12-13013 December 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting (6th ISI Interval) (Epids L-2021-LLR 0029, 0030) ML21307A3422021-12-0707 December 2021 Issuance of Amendments to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21166A1682021-06-25025 June 2021 ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML21005A0612021-01-14014 January 2021 Proposed Alternatives to Extend the Safety Relief Valve Testing Interval (EPID L-2020-LLR-0014 Through L-2020-LLR-0018) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20169A5842020-07-15015 July 2020 Relief from the Requirements of the ASME Code ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20150A3282020-06-26026 June 2020 Issuance of Amendment Nos. 281 and 277 to Increase Allowable Main Steam Isolation Leakage ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20094F8332020-04-0909 April 2020 Issuance of Amendment No. 276, Revise Technical Specification 3.6.1.3 Related to Increased Allowed Main Steam Isolation Valve Leakage (Emergency Circumstances) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML19301A3392019-12-0404 December 2019 Issuance of Amendments to Revise Technical Specification 2.1.1, Reactor Core Safety Limits, the Minimum Critical Power Ration Safety Limits ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML19036A5862019-03-21021 March 2019 Issuance of Amendments to Revise the Emergency Response Organization Staffing Requirements ML18353A2292019-01-28028 January 2019 Issuance of Amendment Nos. 273 and 268 Regarding Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18348B2512019-01-15015 January 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC Nos. MF4460 & MF4461; EPID L-2014-JLD-0054) 2023-09-21
[Table view] |
Text
August 28, 2003 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS RE: REACTOR VESSEL SPECIMEN REMOVAL SCHEDULE (TAC NOS. MB7008 AND MB7009)
Dear Mr. Skolds:
The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment No. 217 to Facility Operating License No. DPR-29 and Amendment No. 211 to Facility Operating License No. DPR-30 for the Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2, respectively. The amendments consist of changes to the Updated Final Safety Analysis Report (UFSAR) in response to your application dated December 20, 2002, as supplemented May 30, 2003.
The amendments revise the licensing basis as described in the UFSAR to implement the Boiling Water Reactor Vessel and Internals Project reactor pressure vessel integrated surveillance program as the basis for demonstrating the compliance of QCNPS, Units 1 and 2, with the requirements of Appendix H to 10 CFR Part 50.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
/RA/
Carl F. Lyon, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-254 and 50-265
Enclosures:
- 1. Amendment No. 217 to DPR-29
- 2. Amendment No. 211 to DPR-30
- 3. Safety Evaluation cc w/encls: See next page
August 28, 2003 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS RE: REACTOR VESSEL SPECIMEN REMOVAL SCHEDULE (TAC NOS. MB7008 AND MB7009)
Dear Mr. Skolds:
The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment No. 217 to Facility Operating License No. DPR-29 and Amendment No. 211 to Facility Operating License No. DPR-30 for the Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2, respectively. The amendments consist of changes to the Updated Final Safety Analysis Report (UFSAR) in response to your application dated December 20, 2002, as supplemented May 30, 2003.
The amendments revise the licensing basis as described in the UFSAR to implement the Boiling Water Reactor Vessel and Internals Project reactor pressure vessel integrated surveillance program as the basis for demonstrating the compliance of QCNPS, Units 1 and 2, with the requirements of Appendix H to 10 CFR Part 50.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
/RA/
Carl F. Lyon, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-254 and 50-265
Enclosures:
- 1. Amendment No. 217 to DPR-29
- 2. Amendment No. 211 to DPR-30
- 3. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
PUBLIC PD3-2 Reading WRuland AMendiola FLyon PCoates WBeckner SCoffin LLois JHoncharik JUhle GHill (4)
OGC ACRS GGrant, RIII MRing, RIII ADAMS Accession Number: ML031960130 *SE dated 6/30/03 OFFICE PDIII-2/PM PDIII-2/LA EMCB/SC OGC PDIII-2/SC NAME FLyon PCoates BElliot for SCoffin* SCole AMendiola DATE 07/22/03 07/22/03 6/30/03 07/29/03 08/28/03 OFFICIAL RECORD COPY
Quad Cities Nuclear Power Station Units 1 and 2 cc:
Site Vice President - Quad Cities Nuclear Power Station Exelon Generation Company, LLC Illinois Emergency Management 22710 206th Avenue N. Agency Cordova, IL 61242-9740 Division of Disaster Assistance &
Preparedness Quad Cities Nuclear Power Station Plant Manager 110 East Adams Street Exelon Generation Company, LLC Springfield, IL 62701-1109 22710 206th Avenue N.
Cordova, IL 61242-9740 Document Control Desk - Licensing Exelon Generation Company, LLC Regulatory Assurance Manager - Quad Cities 4300 Winfield Road Exelon Generation Company, LLC Warrenville, IL 60555 22710 206th Avenue N.
Cordova, IL 61242-9740 Senior Vice President - Nuclear Services Exelon Generation Company, LLC Quad Cities Resident Inspectors Office 4300 Winfield Road U.S. Nuclear Regulatory Commission Warrenville, IL 60555 22712 206th Avenue N.
Cordova, IL 61242 Vice President - Operations Support Exelon Generation Company, LLC David C. Tubbs 4300 Winfield Road MidAmerican Energy Company Warrenville, IL 60555 One River Center Place 106 E. Second, P.O. Box 4350 Chief Operating Officer Davenport, IA 52808-4350 Exelon Generation Company, LLC 4300 Winfield Road Vice President - Law and Regulatory Affairs Warrenville, IL 60555 MidAmerican Energy Company One River Center Place Vice President - Licensing and Regulatory 106 E. Second Street Affairs P.O. Box 4350 Exelon Generation Company, LLC Davenport, IA 52808 4300 Winfield Road Warrenville, IL 60555 Chairman Rock Island County Board of Supervisors Director Licensing 1504 3rd Avenue Mid-West Regional Operating Group Rock Island County Office Bldg. Exelon Generation Company, LLC Rock Island, IL 61201 4300 Winfield Road Warrenville, IL 60555 Regional Administrator U.S. NRC, Region III Senior Counsel, Nuclear 801 Warrenville Road Exelon Generation Company, LLC Lisle, IL 60532-4351 4300 Winfield Road Warrenville, IL 60555
Quad Cities Nuclear Power Station Units 1 and 2 cc:
Manager Licensing - Dresden and Quad Cities Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
EXELON GENERATION COMPANY, LLC AND MIDAMERICAN ENERGY COMPANY DOCKET NO. 50-254 QUAD CITIES NUCLEAR POWER STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.217 License No. DPR-29
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Exelon Generation Company, LLC (the licensee) dated December 20, 2002, as supplemented May 30, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, paragraph 3.B. of Facility Operating License No. DPR-29 is hereby amended to read as follows:
B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 217, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. In addition, the licensee shall include the revised information in the Updated Final Safety Analysis Report submitted to the NRC, pursuant to 10 CFR 50.71(e), as described in the licensees application dated December 20, 2002, as supplemented May 30, 2003, and evaluated in the staffs safety evaluation for this amendment.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Date of Issuance: August 28, 2003
EXELON GENERATION COMPANY, LLC AND MIDAMERICAN ENERGY COMPANY DOCKET NO. 50-265 QUAD CITIES NUCLEAR POWER STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 211 License No. DPR-30
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Exelon Generation Company, LLC (the licensee) dated December 20, 2002, as supplemented May 30, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, paragraph 3.B. of Facility Operating License No. DPR-30 is hereby amended to read as follows:
B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 211, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. In addition, the licensee shall include the revised information in the Updated Final Safety Analysis Report submitted to the NRC, pursuant to 10 CFR 50.71(e), as described in the licensees application dated December 20, 2002, as supplemented May 30, 2003, and evaluated in the staffs safety evaluation for this amendment.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Date of Issuance: August 28, 2003
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 217 TO FACILITY OPERATING LICENSE NO. DPR-29 AND AMENDMENT NO. 211 TO FACILITY OPERATING LICENSE NO. DPR-30 EXELON GENERATION COMPANY, LLC AND MIDAMERICAN ENERGY COMPANY QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-254 AND 50-265
1.0 INTRODUCTION
By application dated December 20, 2002 [Reference 1], as supplemented by letter dated May 30, 2003 [Reference 2], Exelon Generation Company, LLC (EGC, or the licensee) requested changes to the licensing basis as described in the Updated Final Safety Analysis Report (UFSAR) for the Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2. The supplement dated May 30, 2003, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staffs original proposed no significant hazards consideration determination as published in the Federal Register on February 4, 2003 (68 FR 5669).
Specifically, EGC requested Nuclear Regulatory Commission (NRC) review and approval of a license amendment to modify the basis for their compliance with the requirements of Appendix H to Title 10 of the Code of Federal Regulations Part 50 (Appendix H to 10 CFR Part 50),
Reactor Vessel Material Surveillance Program Requirements. In their license amendment submittal, EGC requested that they be approved to implement the Boiling Water Reactor Vessel and Internals Project (BWRVIP) reactor pressure vessel (RPV) integrated surveillance program (ISP) as the basis for demonstrating the compliance of QCNPS, Units 1 and 2 with the requirements of Appendix H to 10 CFR Part 50.
The BWRVIP RPV ISP was submitted for NRC staff review and approval in topical reports BWRVIP-78, BWR Vessel and Internals Project, BWR Integrated Surveillance Program Plan, and BWRVIP-86, BWR Vessel and Internals Project, BWR Integrated Surveillance Program Implementation Plan [References 3,4]. Additional information necessary to establish the technical basis for, and proposed implementation of, the BWRVIP ISP was provided in letters from the BWRVIP to the NRC dated December 15, 2000, and May 30, 2001 [References 5,6].
The NRC staff approved the proposed BWRVIP ISP in a safety evaluation (SE) which was provided to the BWRVIP by letter dated February 1, 2002 [Reference 7]. However, the NRC staffs SE required that plant-specific information be provided by BWR licensees who wish to
implement the BWRVIP ISP for their facilities. EGCs December 20, 2002, and May 30, 2003, submittals addressed the plant-specific information required in the NRC staffs February 1, 2002, BWRVIP ISP SE.
2.0 REGULATORY EVALUATION
Nuclear power plant licensees are required by Appendix H to 10 CFR Part 50 to implement RPV surveillance programs to monitor changes in the fracture toughness properties of ferritic materials in the reactor vessel beltline region...which result from exposure of these materials to neutron irradiation and the thermal environment. Two specific alternatives are provided with regard to the design of a facilitys RPV surveillance program which may be used to address the requirements of Appendix H to 10 CFR Part 50.
The first alternative is the implementation of a plant-specific RPV surveillance program consistent with the requirements of American Society for Testing and Materials (ASTM)
Standard Practice E 185, Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels. In the design of a plant-specific RPV surveillance program, a licensee may use the edition of ASTM Standard Practice E 185 which was current on the issue date of the American Society of Mechanical Engineers (ASME) Code to which the reactor vessel was purchased, or later editions through the 1982 edition.
The second alternative provided in Appendix H to 10 CFR Part 50 is the implementation of an ISP. An ISP is defined in Appendix H to 10 CFR Part 50 as occurring when the representative materials chosen for surveillance for a reactor are irradiated in one or more other reactors that have similar design and operating features. Five specific criteria are stated in Section III.C.1 of Appendix H to 10 CFR Part 50 which must be met to support approval of an ISP:
- a. The reactor in which the materials will be irradiated and the reactor for which the materials are being irradiated must have sufficiently similar design and operating features to permit accurate comparisons of the predicted amount of radiation damage.
- b. Each reactor must have an adequate dosimetry program.
- c. There must be adequate arrangement for data sharing between plants.
- d. There must be a contingency plan to assure that the surveillance program for each reactor will not be jeopardized by operation at reduced power level or by an extended outage of another reactor from which data are expected.
- e. There must be substantial advantages to be gained, such as reduced power outages or reduced personnel exposure to radiation, as a direct result of not requiring surveillance capsules in all reactors in the set.
As noted in Section 1.0 above, the NRC staff approved the proposed BWRVIP ISP in Reference 7. All of the criteria cited above for approval of the ISP were addressed either completely or partially in Reference 7. For those criteria which could not be fully addressed in Reference 7, plant-specific information would be required from licensees who wished to implement the BWRVIP for their facilities. As stated in Reference 7:
[L]icensees who wish to participate in the BWR ISP must provide, for NRC staff review and approval, information which defines how they will determine RPV and/or surveillance capsule fluences based on the dosimetry data which will be available for their facilities. This information must be submitted concurrently with each licensees submittal to replace their existing plant-specific surveillance program with the BWR ISP as part of their facilitys licensing basis. The information submitted must be sufficient for the staff to determine that:
(1) RPV and surveillance capsule fluences will be established as based on the use of an NRC-approved fluence methodology that will provide acceptable results based on the available dosimetry data, and (2) if one methodology is used to determine the neutron fluence values for a licensees RPV and one or more different methodologies are used to establish the neutron fluence values for the ISP surveillance capsules which represent that RPV in the ISP, the results of these differing methodologies are compatible (i.e., within acceptable levels of uncertainty for each calculation).
This plant-specific information was required by the NRC staff to ensure that criterion III.C.1.b of Appendix H to 10 CFR Part 50 for an ISP could be met by each facility, and to confirm that data which would be shared as part of the BWRVIP ISP could be effectively utilized by each licensee for the monitoring of RPV embrittlement for their facility.
3.0 TECHNICAL EVALUATION
In References 1 and 2, EGC submitted information for QCNPS, Units 1 and 2, which addressed the information requested by the NRC staff in Reference 7. In Reference 2, EGC proposed a revision to UFSAR Section 5.3.1.4, which stated:
Regulatory Guide 1.190 Regulatory Guide (RG) 1.190 provides state of the art calculation and measurement procedures that are acceptable to the NRC for determining Reactor Pressure Vessel neutron fluence. RPV fluence has been evaluated using a method in accordance with the recommendations of RG 1.190. Future evaluations of RPV fluence will be completed using a method in accordance with the recommendations of RG 1.190 (as noted in Reference 3 [letter approving Quad Cities participation in ISP]).
In addition, EGC proposed a revision to UFSAR Section 5.3.2, which stated:
More recently, the NRC issued Regulatory Guide (RG) 1.190, which provides state of the art calculation and measurement procedures that are acceptable to the NRC for determining Reactor Pressure Vessel neutron fluence. Quad Cities RPV fluence has been evaluated using a method in accordance with the recommendations of RG 1.190.
Future evaluations of RPV fluence will be completed using a method in accordance with the recommendations of RG 1.190 (as noted in Reference 3).
The NRC staff has concluded that the inclusion of these statements in the QCNPS, Units 1 and 2, UFSAR is sufficient to address both items (1) and (2) from Reference 7. Regarding item
(1), the licensees use of a methodology for determining the QCNPS, Units 1 and 2, RPV neutron fluence values which is consistent with the attributes of RG 1.190, and has been approved by the NRC staff, will provide acceptable results based upon the available dosimetry data. Regarding item (2), RPV surveillance capsules tested under the BWRVIP ISP will have their fluences determined by the use of a methodology which is consistent with the attributes of RG 1.190 and has been approved by the NRC staff. The NRC staff has concluded that any two (or more) different fluence methodologies will provide compatible (as defined in Reference 7) results provided that the best estimate fluence values are within each others uncertainty bounds.
EGC proposed a revision to UFSAR Section 5.3.1.6 to document the licensees incorporation of the BWRVIP ISP into the QCNPS, Units 1 and 2, licensing basis:
Table 5.3-1 provides the location and status of the material specimens.
In 2003, the NRC approved Quad Cities participation in the BWR Vessel and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) as described in BWRVIP-78 and BWRVIP-86 in Reference 2 [BWRVIP-86-A: BWR Vessel and Internals Project, Updated BWR Integrated Surveillance Program (ISP), Final Report, October 2002].
The NRC approved the ISP for the industry in Reference 2 and approved Quad Cities participation...The ISP meets the requirements of 10 CFR 50 Appendix H and provides several advantages over the original program....
The current withdrawal schedule for both units is based on the NRC-approved revision of BWRVIP-86 (Reference 2). Based on this schedule, Quad Cities is not scheduled to withdraw an additional material specimen.
The proposed revision is acceptable. In addition, EGC proposed a revised withdrawal schedule for QCNPS, Units 1 and 2, in UFSAR Table 5.3-1, in accordance with the NRC staff-approved BWRVIP-86. The proposed schedule is acceptable.
Based on the information provided by EGC, as discussed above, the NRC staff has concluded that the BWRVIP ISP, as approved in Reference 7, can be implemented for QCNPS, Units 1 and 2, as the basis for demonstrating the facilitys continued compliance with the requirements of Appendix H to 10 CFR Part 50.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Illinois State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 or change an inspection or a surveillance requirement. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a
proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (68 FR 5669). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
7.0 REFERENCES
[1] M. P. Gallagher (EGC and AmerGen) to U.S. NRC Document Control Desk, Request for License Amendment Regarding Reactor Vessel Specimen Removal Schedule, December 20, 2002.
[2] K. R. Jury (EGC and AmerGen) to U.S. NRC Document Control Desk, Additional Information Supporting the Request for License Amendment Regarding Reactor Vessel Specimen Removal Schedule, May 30, 2003.
[3] C. Terry (BWRVIP) to U.S. NRC Document Control Desk, Project No. 704 - BWR Vessel and Internals Project, BWR Integrated Surveillance Program Plan (BWRVIP-78), December 22, 1999.
[4] C. Terry (BWRVIP) to U.S. NRC Document Control Desk, Project No. 704 -
BWRVIP-86: BWR Vessel and Internals Project, BWR Integrated Surveillance Program Implementation Plan, EPRI Technical Report 1000888, December 22, 2000.
[5] C. Terry (BWRVIP) to U.S. NRC Document Control Desk, PROJECT NO. 704 -
BWRVIP Response to NRC Request for Additional Information Regarding BWRVIP-78, December 15, 2000.
[6] C. Terry (BWRVIP) to U.S. NRC Document Control Desk, PROJECT NO. 704 -
BWRVIP Response to Second NRC Request for Additional Information on the BWR Integrated Surveillance Program, May 30, 2001.
[7] W. H. Bateman (USNRC) to C. Terry, Safety Evaluation Regarding EPRI Proprietary Reports BWR Vessel and Internals Project, BWR Integrated Surveillance Program Plan (BWRVIP-78) and BWRVIP-86: BWR Vessel and Internals Project, BWR Integrated Surveillance Program Implementation Plan, February 1, 2002.
Principal Contributors: J. Honcharik L. Lois Date: August 28, 2003