Revision 6 to EP-PS-325, Systems Lead Engineer: Emergency Plan-Position Specific Procedure.
ML031920258
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/27/2003
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML031920258 (9)


Text

Jun. 27, 2003 Page 1 of 1 MANUAL HARD COPY ISTRIBUTION OCJUMENT TRANSMITTAL 2003-30772 USER NFO I Name:G H*ROSE M EMPL#:28401 CA#:0363 Address: A2 Phone#: 254-3 4 TRANSM T INFORMATION:

TO: -LIlrrviJir 06/27/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

325 - 325 - SYSTEMS LEAD ENGINEER: EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 06/24/2003

' ,:ADD MANUAL TABLE OF CONTENTS DATE: 06/26/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-325 REMOVE: REV:5 ADD: REV: 6 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

PROCEDURE COVER SHEET PPL SUSQUEHANNA, LLC NUCLEAR DEPARTMENT PROCEDURE SYSTEMS LEAD ENGINEER: EP-PS-325 Emergency Plan-Position Specific Instruction Revision 6 Page 1 of 3 QUALITY CLASSI FICATION: APPROVAL CL ASIFICATION:

( ) QA Program (X) Non-QA Program ( ) Plan, /\( ) Non-Plant (X) Instr ctkion/

EFFECTIVE DATE: ,

PERIODIC REVIEW FREQ +JtNCY. ' Two Years PERIODIC REVIEWDUE DATA: _ ___-__

RECOMMENDED REVIEWS: /-

ALL Proedur Owner: Nuclear Emergency Planning R onsible Supervisor: Primary Engineering Support Supervisor Responsible FUM: Supervisor-Nuclear Emergency Planning Responsible Approver: General Manager-Plant Support FORM NDAP-QA-0002-1, Rev. 3, Page 1 of 1

EP-PS-325 Revision 6 Page 2 of 3 SYSTEMS LEAD- ENGINEER: Emergency Plan Position Specific Procedure WHEN: When the EOF is activated HOW NOTIFIED: Paged/Telenotifications Systems WHERE TO REPORT: General Office AND Emergency Operations Facility REPORT TO: Engineering Support Supervisor OVERALL DUTY:

Provide technical data and advice to the Engineering Support Supervisor in support of dose projections, emergency classifications, protective action recommendations, and information dissemination.

MAJOR TASKS: TAB: REVISION:

Provide required support for the Emergency TAB A 6 Operations Facility.

Support dose projections, emergency TABB -5 classifications, protective action recommendation process, and information dissemination.

EP-PS-325 Revision 6 Page 3 of 3 SUPPORTING INFORMATION: TAB:

Emergency Telephone Instructions TAB 1 Emergency Organization TAB 2 Dose Projection Worksheet TAB 3 Intentionally Blank TAB 4 Emergency Classification TAB 5 Public Protective Action Recommendation Guide TAB 6 Core Damage Estimate I TAB 7 Core Damage Estimate II TAB 8

REFERENCES:

NRC RTM 92, Nuclear Regulatory Commission Response Team Manual SSES Emergency Plan NUREG 0654, Planning Standards and Evaluation Criteria NUREG 0731, Guidelines for Utility Management Structure and Technical Resources, Sept. 1980 NUREG 0696, Functional Criteria for Emergency Response Facilities NEDO 22215, Procedure for the Determination of the Extent of Core Damage Under Accident Conditions

TAB A EP-PS-325-A Revision 6 Page 1 of 3 MAJOR TASK:

Provide required support for the Emergency Operations Facility.

SPECIFIC TASK: HOW:

NOTE:

This position Is NOT required for EOF activation. It Is desired within 90 minutes of an activation event. One individual reports to General Office and one to EOF.

1. Log in upon arrival. 1a. Augmented support staff will log in on the Ingress/Egress Log located at the EOF Entrance.

(1) Clip on the position specific title badge located on table at entrance to the EOF.

2. Notify the Engineering Support 2a. Initial support staff in the G.O. will Supervisor of your arrival. establish a conference bridge with the TSC and EOF. Use this bridge to notify the Engineering Support Supervisor of your arrival.

NOTE:

Conference bridge telephone numbers are available In the Emergency Telephone Directory located at each work station.

2b. Augmented EOF Engineering Support Staff, upon arrival in the EOF, will notify the Engineering Support Supervisor of your arrival.

3. Verify engineering support equipment 3a. Verify telephones are functional.

is operational.

3b. Verify Computer terminals and associated printers are operational.

TAB A EP-PS-325-A Revision 6 Page 2 of 3 SPECIFIC TASK: HOW:

3c. Verify PICSY is operational.

NOTE:

Report all equipment problems to the NEP Duty Planner.

4. Obtain sufficient knowledge of the 4a. Obtain information from the Engineering event to allow assumption of duties. Support Supervisor, Shift Technical Advisor, Technical Support Center or other accurate source.

4b. Ensure knowledge of:

(1) Affected UWit (2) Emergency Classification (3) Any Protective Action Recommendation (4) Source term size (5) Release flowpath NOTE:

Augmented EOF staff can obtain additional information from data posted In the facility.

4c. Review and understand status of the event.

5. Provide a briefing on information obtained to the Engineering Support Supervisor upon his arrival at the EOF.
6. Inform the Engineering Support Supervisor of readiness to support the Engineering Support Function.

TAB A EP-PS-325-A Revision 6 Page 3 of 3 SPECIFIC TASK: HOW:

7. Maintain open line of communications 7a. Maintain the conference bridge between engineering groups located established by the initial Engineering in the GO, TSC and EOF. Support Staff.

NOTE:

Conference bridge telephone numbers are available in the Emergency Telephone Directory located at each work station.

TAB B EP-PS-325-B Revision 5 Page 1 of 2 MAJOR TASK:

Support dose projections, emergency classifications, protective action recommendation process, and information dissemination.

SPECIFIC TASK: HOW:

1. Complete "DOSE PROJECTION HELP WORKSHEET" to support dose DOSE PROJECTION WORKSHEET projections and protective action See TAB 3 recommendations.
2. Review the current Emergency 2a. Notify the Engineering Support Classification and monitor for potential Supervisor or Recovery Manager if the upgrade. potential for escalation of the emergency classification exists.

HELP EMERGENCY CLASSIFICATION See TAB 5

3. Maintain ongoing awareness of plant 3a. At a minimum, ensure ongoing status. awareness of the following:

(1) Status of reactivity control (2) Decay heat removal (3) Backup heat removal capability (4) Integrity of fuel cladding, RX vessel, primary containment, and secondary containment (5) Hydrogen generation (6) Status of radiological release

4. Provide technical information to the NRC Response Team and MOC Technical Briefer(s), when requested.
5. Update the Engineering Support 5a. Advise the ESS immediately if you Supervisor (ESS), when new become aware of information that could information becomes available. change the emergency classification or PAR.

TABB EP-PS-325-B Revision 5 Page 2 of 2 SPECIFIC TASK: HOW:

5b. Advise the ESS immediately if you provide information believed to be incomplete or inaccurate in a briefing.

5c. Use three part communications during exchange of critical information.