Revision to EP-PS-307, Engineering Support Manager Emergency Plan-Position Specific Procedure
ML031920256
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/27/2003
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML031920256 (9)


Text

Jun. 27, 2003 Page l of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-30696 USER INFORMATION Name OSE M

EMPL#:28401 CA#:0363 Addre TRANSMITTAL INFORMATION:

TO:

06/27/2003 LOCATION: DOCUMENT CONTROL DESK FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER {NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED-':--

TO YOU:

307 -

307 -

ENGINEERING SUPPORT MANAGER:

EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 06/24/2003

.ADD MANUAL TABLE OF CONTENTS DATE: 06/26/2003 CATEGORY:

PROCEDURES TYPE: EP ID:

EP-PS-307 REMOVE:

REV:7 ADD:

REV: 8 REMOVE:

PCAF 2003-1000 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY.

FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

4,,45

PROCEDURE COVER SHEET PPL SUSQUEHANNA, LLC NUCLEAR DEPARTMENT PROCEDURE ENGINEERING SUPPORT SUPERVISOR:

EP-PS-307 Emergency Plan-Position Specific Instruction Revision 8 Page 1 of 3 QUALITY CLASSIFICATION:

APPROVAL C I

4 fFIC TJON:

( ) QA Program (X)

Non-QA Program

(

)

Plan t Non-Plant (X)

InsteUction /

EFFECTIVE DATE:

PERIODIC REVIEW FREQL1ENQYi:

Three Year PERIODIC REVIEy U131IDAT:

RECOMMENDED REVIEWS:

ALL Proedure er:

Nuclear Emergency Planning Relprisie Supervisor:

Primary Engineering Support Supv.

Responsible FUM:

Supervisor-Nuclear Emer. Planning Responsible Approver:

General Manager-Plant Support FORM NDAP-QA-0002-1, Rev. 3, Page 1 of 1

EP-PS-307 Revision 8 Page 2 of 3 ENGINEERING SUPPORT SUPERVISOR Emergency Plan Position Specific Procedure WHEN:

When the EOF is activated HOW NOTIFIED:

Paged/Telenotifications System WHERE TO REPORT:

Emergency Operations Facility REPORT TO:

Recovery Manager OVERALL DUTY:

Act as a technical resource for plant data and information, performing assessments to support dose projections, protective action recommendations and emergency-classifications.

MAJOR TASKS:

TAB:

REVISION:

Obtain information on plant status to support dose projections, protective action recommendations, emergency classifications, and information dissemination.

Support dose assessment calculations, communicating results to the Dose Assessment Staff.

Establish and maintain contact with the Department of Environmental Protection/Bureau of Radiation Protection (Technical), Nuclear Regulatory Commission, and the Media Operations Center.

TAB A 11 TAB B 5

TAB C 5

EP-PS-307 Revision 8 Page 3 of 3 SUPPORTING INFORMATION:

TAB:

Emergency Organization TAB 1 NERO Technical Support Overview TAB 2 Emergency Classifications TAB 3 Public Protective Action Recommendation Guide TAB 4

REFERENCES:

NRC RTM 92, Nuclear Regulatory Commission Response Team Manual SSES Emergency Plan NUREG 0654, Planning Standards and Evaluation Criteria NUREG 0731, Guidelines for Utility Management Structure and Technical Resources, Sept. 1980 NUREG 0696, Functional Criteria for Emergency Response Facilities NEDO 22215, Procedure for the Determination of the Extent of Core Damage Under Accident Conditions

TAB A EP-PS-307-A Revision 1 1 Page 1 of 5 MAJOR TASK:

Obtain information on plant status to support dose projections, protective action recommendations, event classifications, and information dissemination.

SPECIFIC TASK:

HOW:

1.

Log in upon arrival.

1a.

Sign Ingress/Egress Log located at the entrance into the EOF.

1 b.

Clip-on the position specific name badge.

1 c.

Sign-in on board in conference area if you are the initial responder.

2.

Notify the Recovery Manager of your arrival.

3.

Provide Engineering Support to the EOF Staff.

NOTE:

If the Recovery Manager is delayed In arriving at the EOF, prepare the facility for turnover, (reference EP-PS-200, Recovery Manager Emergency-Plan-PosItion Specific Instruction), but do not accept turnover until his arrival.

3a.

Only the Engineering Support Supervisor is required for EOF activation.

3b.

Obtain required engineering information from the TSC until arrival of additional engineering staff in GOIEOF.

3c.

The following personnel are desired within 90 minutes:

(1)

Systems Lead Engineer (EOF AND GO)

(2)

Fuels Lead Engineer (EOF AND GO)

(3)

Mechanical Engineer (EOF)

(4)

Electrical Engineer (EOF)

TABA EP-PS-307-A Revision 1 1 Page 2 of 5 SPECIFIC TASK:

HOW:

3d.

Call the General Office if you are the initial responder. (Conference bridge telephone line may be used.)

3e.

If additional support is required, request the EOF Support Supervisor or NEP Duty Planner to obtain needed disciplines.

4.

Determine readiness of Engineering Support Staff to support EOF functions for this event.

4a.

Verify engineering equipment is operational (phones, PICSY terminals, network terminals, Fax machine, etc.).

4b.

Brief Engineering Support Staff as time permits. (Staff can be briefed after EOF activation.)

5.

Obtain sufficient knowledge of event to allow assumption of duties.

5a.

Review data posted in the Command and Control, Site Support, and Engineering Support areas.

5b.

Obtain event information from Recovery Mgr., TSC, or other accurate source.

Ensure knowledge of:

(1)

Affected Unit (2)

Emergency Classification (3)

Any Protective Action Recommendations (4)

Source term size (5)

Release flowpath (6)

Review and understand status of unaffected unit.

TABA EP-PS-307-A Revision 1 1 Page 3 of 5 SPECIFIC TASK:

HOW:

6.

Perform turnover of notification of DEP/BRP Technical from the TSC Engineering Staff to the EOF. (This can be done at any time but is REQUIRED at first notification after TSCIEOF turnover).

6a.

Contact the TSC Tech Support Coordinator and obtain time that next notification is due. Accept responsibility for next notification of DEP/BRP Technical. (REQUIRED at first notification after TSC/EOF turnover).

6b.

DEP/BRP communications are due hourly.

7.

Maintain ongoing awareness of plant status.

8.

Review plant status with the Recovery Manager. Assist in classification and reclassification of the event, and in determining the need for Protective' Action Recommendations.

7a.

Ensure an ongoing awareness of at least the following:

(1)

Status of Reactivity control (2)

Decay heat removal (3)

Backup heat removal capability (4)

Integrity of fuel cladding, Rx vessel, primary containment, and secondary containment (5)

Hydrogen generation (6)

Status of rad release 8a.

Assign personnel to trend the following data, immediately advise you of significant changes:

(1) The release path:

a.

Barriers breached

b.

Barriers threatened, (no decay heat removal, over pressurization, etc.)

c.

Mitigation in progress (2)

Source term

a.

Type and amount of fuel damage

b.

Mitigation in progress (3)

Present classification and bases

a.

Potential for upgrade

TAB A EP-PS-307-A Revision I 1 Page 4 of 5 SPECIFIC TASK:

HOW:

9.

Establish/maintain an Engineering Support Priorities List.

9a.

Assign a staff member to maintain a list of Engineering Support Priorities utilizing the 8white boards or easels in the Engineering Support Office, including:

(1) initial time (2) disposition (open/closed)

(3) time of closure

10.

Establish/maintain a list of current/concurrent EAL's.

10a.

Ensure tracking of concurrent EAL's at all emergency levels.

1Ob.

Provide information to Recovery Manager for downgrade discussions.

11.

Update Recovery Manager as new information becomes available.

11a.

Brief Engineering Support Staff personnel to:

(1)

Advise you immediately if they become aware of information that could change the Emergency Classification or PAR.

(2)

Advise you immediately if you provide information believed to be incomplete or inaccurate in a briefing.

(3)

Use three-part communications during exchanges of critical information.

TAB A EP-PS-307-A Revision 1 1 Page 5 of 5 SPECIFIC TASK-HOW:

12.

Succeed the Recovery Manager as required.

1 2a.

If the Recovery Manager becomes unable to perform his functions during the emergency and another Recovery Manager is not present, assume the duties of Recovery Manager.

12b.

Ensure a replacement Recovery Manager is immediately called to the EOF.