Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML19004A3022018-12-19019 December 2018 Emergency Plan Changes Revision 61 to Revision 62 ML17006A3862017-01-0505 January 2017 FEMA - Submittal of After Action Report/Improvement Plan for Susquehanna Steam Electric Station 2016 Plume Exercise Evaluated on October 18, 2016 ML15264A6932015-09-21021 September 2015 SSES EAL Scheme Bases Document Redline Strike-out in Support of 9/23 Public Meeting PLA-7285, Revision (X) to EP-RM-004, EAL Classification Bases2015-03-19019 March 2015 Revision (X) to EP-RM-004, EAL Classification Bases PLA-7279, Submittal of Revision 56 to Emergency Plan2015-01-19019 January 2015 Submittal of Revision 56 to Emergency Plan ML0627801812006-09-22022 September 2006 Rev. 4 to TSB2, Technical Specifications Bases Unit 2 Manual and Rev. 75 to Manual Table of Contents ML0519904452005-07-0707 July 2005 Technical Specification Bases Unit 1 Manual, Revision 1 ML0410505062004-04-0707 April 2004 EP-PS-137, Rev 0, TSC NRC Communicator. ML0410504572004-04-0707 April 2004 Transmittal of Emergency Plan Implementing Procedure, EP-PS-126, Control Room (CR) Communicator. ML0410503912004-04-0707 April 2004 Transmittal of EP-PS-135, NRC Communicator: Emergency Plan Position Specific Procedure ML0410504682004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure EP-PS-243, Rev 5, Radiological Liaison. ML0410504632004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure EP-PS-221-1, Nearsite Emergency Monitoring Team: Emergency Plan-Position Specific Procedure. ML0410504602004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure, EP-PS-248, Environmental Sample Director. ML0409904242004-04-0101 April 2004 to EP-PS-248, Environmental Sample Director. ML0409004192004-03-23023 March 2004 EP-PS-113, Security Coordinator: Emergency Plan-Position Specific Procedure. ML0408406142004-03-10010 March 2004 EP-PS-101, Emergency Director (Ed). ML0408406122004-03-0808 March 2004 EP-PS-307, Engineering Support Manager. ML0408406062004-03-0808 March 2004 EP-PS-102, Technical Support Coordinator. ML0405503942004-02-16016 February 2004 Revision 10 to EP-PS-351, News Manager. ML0405503912004-02-16016 February 2004 EP-PS-367, General Office Operations Manager. ML0403502512004-01-28028 January 2004 EP-PS-245, Dose Assessment Supervisor. ML0403502642004-01-27027 January 2004 EP-PS-130, Rev 17, HP II Dose Calculator. ML0403502692004-01-27027 January 2004 EP-PS-244, Rev 7, Dose Assessment Staffer. ML0403502602004-01-27027 January 2004 EP-PS-104, Rev 17, Radiation Protection Coordinator (Rpc). ML0403502562004-01-27027 January 2004 EP-PS-105, TSC Dose Calculator. ML0402906032004-01-19019 January 2004 EP-PS-104, Rev. 17, Radiation Protection Coordinator (Rpc). ML0402905562004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-207, Rev. 11, EOF Support Supervisor: Emergency Plan Position Specific Procedure. ML0402905652004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-200, Rev. 16, Recovery Manager: Emergency Plan Position Specific Instruction. ML0402905412004-01-19019 January 2004 Revision 19 to EP-PS-100, Emergency Director/Control Room. ML0402905752004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-127, Rev. 16, TSC Emergency Plan Communicator: Emergency Plan Position Specific Procedure. ML0402905822004-01-19019 January 2004 EP-PS-114, Chemistry Coordinator. ML0402905942004-01-19019 January 2004 EP-PS-248, Environmental Sample Director. ML0402905982004-01-19019 January 2004 EP-PS-243, Radiological Liaison. ML0402906052004-01-19019 January 2004 Revision 19 to EP-PS-101, TSC Emergency Director. ML0402906082004-01-19019 January 2004 Revision 18 to EP-PS-212, EOF Communicator. ML0402905872004-01-19019 January 2004 EP-PS-247, Rev. 2, Field Team Director. PLA-5644, Proposed Emergency Plan Revision Requiring NRC Approval2004-01-16016 January 2004 Proposed Emergency Plan Revision Requiring NRC Approval ML0336405902003-12-19019 December 2003 Transmittal of EP-PS-100, Rev. 19 Emergency Director/Control Room: Emergency Plan-Position Specific Procedure. ML0335703252003-12-12012 December 2003 EP-PS-126, Revision 19, Control Room Communicator ML0335702972003-12-12012 December 2003 EP-PS-100, Emergency Director/Control Room. ML0335702992003-12-12012 December 2003 EP-PS-354, Media Operations Center (MOC) Communicator. ML0335703002003-12-12012 December 2003 EP-PS-212, Rev 18, EOF Communicator. ML0335703012003-12-12012 December 2003 EP-PS-207, Rev 11, Site Support Manager. ML0335703212003-12-12012 December 2003 EP-PS-137, Rev 0, TSC NRC Communicator. ML0335703232003-12-12012 December 2003 EP-PS-135, Rev 0, NRC Communicator. ML0335703242003-12-12012 December 2003 EP-PS-127, Rev 16, Technical Support Center (TSC) Communicator. ML0335703292003-12-12012 December 2003 EP-PS-114, Rev 10, Chemistry Coordinator: Emergency Plan-Position Specific Procedure. ML0335703302003-12-12012 December 2003 EP-PS-111, Rev 4, TSC Lead Engineer. ML0335703322003-12-12012 December 2003 EP-PS-103, Rev 6, Operations (OPS) Coordinator. ML0335703342003-12-12012 December 2003 EP-PS-102, Rev 23, Technical Support Coordinator. 2018-12-19
[Table view] Category:Manual
MONTHYEARML23345A0672023-11-28028 November 2023 Technical Specifications Bases Manual ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual ML23345A0842023-11-28028 November 2023 Technical Requirements Manual ML23345A0882023-11-28028 November 2023 Technical Requirements Manual ML23195A0342023-07-0606 July 2023 Technical Requirements Manual, Revision 21 ML23195A0352023-06-30030 June 2023 Revisions to Technical Requirements Manual ML23195A0332023-06-29029 June 2023 Technical Requirements Manual ML23107A1292023-03-31031 March 2023 Technical Specifications Bases, Unit 2 ML23107A1322023-03-31031 March 2023 Technical Requirements Manual, Unit 2 ML23025A0362023-01-16016 January 2023 Technical Specifications Bases Manual ML23017A0462023-01-0606 January 2023 Technical Specifications Bases, Manual ML23017A0552023-01-0606 January 2023 Technical Specification Bases, Manual ML22363A0972022-12-15015 December 2022 Technical Requirements Manual, Revision1 ML22363A0982022-12-15015 December 2022 Technical Requirements Manual, Rev. 1 for Section 4.7 ML22363A0992022-12-14014 December 2022 Technical Requirements Manual, Revision 28 ML22363A1022022-12-14014 December 2022 Technical Requirements Manual, Revision 29 ML22363A1012022-12-0909 December 2022 Technical Requirements Manual, Rev. 12 for Section 2 ML22363A1002022-12-0707 December 2022 Technical Requirements Manual, Rev.11 ML22287A1192022-10-0606 October 2022 Technical Requirement Manual ML22287A1202022-10-0606 October 2022 Technical Requirement Manual ML22180A1942022-06-10010 June 2022 Technical Specification Bases Unit 1 Manual ML22180A1952022-06-10010 June 2022 Technical Specifications Bases Unit 2 Manual ML22136A1582022-04-29029 April 2022 Technical Specification Bases Manual ML22123A0582022-04-22022 April 2022 Transmittal of Technical Requirements Manual ML22123A0752022-04-22022 April 2022 Technical Requirements Manual Unit 2 ML22101A0282022-03-30030 March 2022 Revised Technical Specification Bases Unit 1 Manual ML22101A0442022-03-30030 March 2022 Technical Requirements Manual ML22039A0352022-01-18018 January 2022 Technical Requirements Manual, Revision 4 ML22039A0462022-01-18018 January 2022 Technical Specifications Bases Manual, Revision 8 ML22039A0322022-01-17017 January 2022 Technical Requirements Manual, Rev. 4 ML22011A1392022-01-0404 January 2022 Electrical Station - Technical Requirements Manual, Unit 1 ML22011A1452022-01-0404 January 2022 Electrical Station, Unit 2 - Technical Requirements Manual Unit 2 ML21224A1882021-08-0202 August 2021 Technical Specifications Bases Unit 2 Manual ML21224A1892021-08-0202 August 2021 Technical Requirements Manual Unit 2 ML21209A5212021-07-16016 July 2021 Technical Requirements Manual ML21209A5202021-07-16016 July 2021 Technical Requirements Manual ML21202A1512021-07-0202 July 2021 Technical Requirements Manual ML21202A1592021-07-0202 July 2021 Technical Requirements Manual ML21190A0522021-06-24024 June 2021 Technical Requirements Manual ML21196A1812021-06-24024 June 2021 Technical Requirements Manual PLA-7927, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-79272021-04-26026 April 2021 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-7927 ML21091A2232021-03-19019 March 2021 Technical Requirements Manual ML21070A1812021-02-26026 February 2021 Transmittal of Technical Requirements Manual ML21070A1822021-02-26026 February 2021 Technical Requirement Manual, Unit 2 ML21014A4452020-12-17017 December 2020 Technical Specifications Bases Manual ML21029A0572020-12-17017 December 2020 Technical Specification Bases Manual, Revision 16 ML21014A2252020-12-0101 December 2020 Technical Requirements Manual ML20304A1562020-10-13013 October 2020 Technical Requirements Manual ML20304A1582020-10-13013 October 2020 Technical Requirements Manual ML20129J9042020-04-23023 April 2020 Technical Requirements, Unit 1, Manual 2023-07-06
[Table view] |
Text
Jun. 27, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-30917 USER INFORMATIeO:
Nam GERLAC ROSE M EMPL#:28401 CA#:0363 Address CSA2 Phone#: 3194 T ITTAL INFORMATION:
fl TO: f X 06/27/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
328 - 328 - ELECTRICAL SUPPORT ENGINEER REMOVE MANUAL TABLE OF CONTENTS DATE: 06/24/2003
,ADD MANUAL TABLE OF CONTENTS DATE: 06/26/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-328 REMOVE: REV:1 ADD: REV: 2 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX;
PROCEDURE COVER SHEET PPL SUSQUEHANNA, LLC I NUCLEAR DEPARTMENT PROCEDURE ELECTRICAL SUPPORT ENGINEER: EP-PS-328 Emergency Plan-Position Specific Instruction Revision 2 Page 1 of 3 QUALITY CLASSIFICATION: APPROVAL CLASSIFIATiON:
( ) QA Program (X) Non-QA Program ( ) Pla~t- At ) Non-Plant
( X) Instruc;tionq/
EFFECTIVE D~TE: o -SX 3 PERIODIC REVIEW FREQUENC;. Two Years PERIODIC REVlEWDJ; DAL 6- c&-z RECOMMENDED REVIEWS: /
ALL Procedu( Owner: Nuclear Emergency Planning R'isponsible Supervisor: Primary Engineering Support Supervisor Responsible FUM: Supervisor-Nuclear Emergency Planning Responsible Approver: General Manager-Plant Support FORM NDAP-QA-0002-1, Rev. 3, Page 1 of 1
EP-PS-328 Revision 2 Page 2 of 3 EOF SUPPORT ENGINEER: Emergency Plan Position Specific Procedure WHEN: When the EOF is activated HOW NOTIFIED: Paged/Telenotifications Systems REPORT TO: Emergency Operations Facility WHERE TO REPORT: Engineering Support Supervisor OVERALL DUTY:
Provide technical data and advice to the Engineering Support Supervisor in support of emergency classifications, protective action recommendations, and information dissemination.
MAJOR TASKS: TAB: REVISION:
Provide required support for the Emergency TAB A 2 Operations Facility upon arrival.
Support emergency classifications, protective action TAB B 1 recommendation process, and information dissemination.
EP-PS-328 Revision 2 Page 3 of 3 SUPPORTING INFORMATION: TAB:
Emergency Telephone Instructions TAB 1 Emergency Organization TAB 2 Emergency Classification TAB 3 Public Protective Action Recommendation Guide TAB 4 Intentionally Blank TAB5 Determining Affected Unit Status TAB 6
REFERENCES:
NRC RTM 92, Nuclear Regulatory Commission Response Team Manual SSES Emergency PleLn NUREG 0654, Planning Standards and Evaluation Criteria NUREG 0731, Guidelines for Utility Management Structure and Technical Resources, Sept. 1980 NUREG 0696, Functional Criteria for Emergency Response Facilities
TAB A EP-PS-328-A Revision 2 Page 1 of 2 MAJOR TASK:
Provide required support for the Emergency Operations Facility upon arrival.
SPECIFIC TASKS: HOW:
NOTE:
This position is NOT required for EOF activation. ft Is desired within 90 minutes of an activation event.
- 1. Log in upon arrival. 1a. Sign in on Ingress/Egress Log located at entrance to EOF.
1b. Clip-on the position specific name badge (applies only to Augmented staff in EOF)
- 2. Notify the Engineering Support 2a. If part of initial responding staff, establish Supervisor of your arrival. a telephone bridge connection with the EOF and TSC.
NOTE:
Telephone and conference bridge numbers are located In the "Emergency Telephone Directory" available at each work station.
- 3. Obtain sufficient knowledge of event 3a. Review data posted in the Command to allow assumption of duties. and Control, Site Support and Engineering Support areas.
3b. Obtain event information from the Engineering Support Supervisor, Shift Technical Advisor (STA), TSC, or other accurate source. Ensure knowledge of:
(1) Affected Unit (2) Emergency Classification (3) Any Protective Action Recommendation(s)
(4) Source term size (5) Release flowpath (6) Review and understand status of unaffected unit.
TAB A EP-PS-328-A Revision 2 Page 2 of 2 SPECIFIC TASKS: HOW:
- 4. Verify engineering equipment is 4a. Verify telephones in the Engineering operational. Support area are functional.
4b. Verify Plant Integrated Computer System, (PICSY) terminals are functional.
4c. Verify computer terminals in the Engineering Support area are functional.
NOTE:
Report any problems to the NEP Duty Planner or EOF.Support Supervisor.
- 5. Establish communications between 5a. Establish communications between the the EOF, TSC and General Office. EOF Engineering Support, TSC Tech Support and GO Engineering Support Groups using a telephone bridge connection. Maintain an open line to establish continuous communications links.
NOTE:
Telephone numbers are located in the "Emergency Telephone Directory" available at each work station.
TAB B EP-PS-328-B Revision 1 Page 1 of 2 MAJOR TASK:
Support emergency classifications, protective action recommendation process, assessment of plant status, and information dissemination.
SPECIFIC TASKS: HOW:
- 1. Monitor and trend data using the Plant 1a. Utilize white boards in the Engineering Integrated Computer System (PICSY). Support Office to trend important plant parameters in support of dose projections, emergency classifications, protective action recommendations, and information dissemination.
1b. Notify Engineenrnig Support Supervisor or Recovery Manager if significant changes occur in the data trending.
- 2. Determine potential for upgrade of the 2a. Review Emergency Classifications to Emergency Classification. monitor for potential upgrade.
2b. Notify the Engineering Support Supervisor or Recovery Manager if potential for escalation of the emergency classification exists.
2c. Maintain status of Emergency Action Levels (EALs) being monitored on 'white boards in the Engineering Support area.
HELP EMERGENCY CLASSIFICATION See TAB 3
- 3. Maintain ongoing awareness of plant 3a. Ensure an ongoing awareness of at least status. the following:
(1) Status of Reactivity control (2) Decay heat removal (3) Backup heat removal capability (4) Integrity of fuel cladding, Rx Vessel, primary containment and secondary containment (5) Hydrogen generation (6) Status of radiological release
TAB B EP-PS-328-B Revision 1 Page 2 of 2 SPECIFIC TASKS: HOW:
HELP DETERMINING AFFECTED UNIT STATUS See TAB 6 HELP PUBLIC PROTECTIVE ACTION RECOMMENDATIONS See TAB 4
- 4. Establish/maintain an Engineering 4a. Maintain a list of Engineering Support Support Action Items List. action items utilizing the 'white boards' or easels in the Engineering Support area, including:
(1) initial time (2) disposition (open/closed)
(3) time of closure 4b. Periodically brief the Engineering Support Supervisor on status of engineering support activities and assignments.