ML031840385
| ML031840385 | |
| Person / Time | |
|---|---|
| Site: | Oconee, Mcguire, Catawba, McGuire |
| Issue date: | 06/26/2003 |
| From: | Tuckman M Duke Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML031840385 (5) | |
Text
_ Duke MICHAEL S.
TUCKMAN L#Pokw wer.
Executive Vice President A Duke Energy Company Nuclear Generation Duke Power P.O. Box 1006 Charlotte, NC 28201-1006 Mailing Address:
526 South Church Street Charlotte, NC 28202 704 382 2200 704 382 4360 fax June 26, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Duke Energy Corporation Oconee Nuclear Station, Units 1, 2, and 3 NRC Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 NRC Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 NRC Docket Nos. 50-413, 50414 RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION RE: RESPONSE TO NRC ORDER FOR COMPENSATORY MEASURES RELATED TO ACCESS AUTHORIZATION, (B. 1.3(c))
In accordance with 10 C.F.R. § 50.4, Duke Energy Corporation ("Duke") hereby submits its response to the March 20, 2003, Request For Additional Information ("RIA") regarding Duke's response to the Order For Compensatory Measures Related To Access Authorization ("Order") issued by the United States Nuclear Regulatory Commission ("NRC") on January 7, 2003. The purpose of this response is to provide clarification regarding Duke's compliance with the Order's compensatory measure B.1.3(c).
This response provides clarification as requested without modifying or changing the remaining aspects of Duke's January 22, 2003 response.
In the January 22, 2003 response, in describing Duke's contemplated action, Duke quoted compensatory measure B.1.3(c), stating that it would complete the required inquires to the "fullest extent possible."
A more accurate statement of Duke's contemplated action as it relates to compensatory measure B.1.3(c) and the appropriate quote from the Order is that Duke will complete the required inquiries "to the extent possible." That is, Duke will confirm eligibility for employment to the extent achievable in accordance with the requirements of the 1-9 process, "Employment Eligibility Verification," from the Bureau of Citizenship and Immigration Service (formerly INS), United States Department Of Homeland Security.
www. duke-energy. corn
U.S. Nuclear Regulatory Commission June 26, 2003 Page 2 If you have any questions regarding this clarification, please contact Dana L. Boies, Nuclear Regulatory & Industry Affairs, at (704) 382-1694.
Very truly yours, VM-f.6 M. S. Tuckman Attachments
U.S. Nuclear Regulatory Commission June 26, 2003 Page 3 M. S. Tuckman, affirms that he is the person who subscribed his name to the foregoing statement, and that all the matters and facts set forth herein are true and correct to the best of his knowledge.
M. S. Tuckman Subscribed and sworn to me:
A 2.y )&6'3 Date Notary Publici My Commission Expires:
Date SEAL
-I C
U.S. Nuclear Regulatory Commission June 26, 2003 Page 4 xc:
S. J. Collins, Director E. F. Guthrie Office of Nuclear Reactor Regulation NRC Senior Resident Inspector U. S. Nuclear Regulatory Commission Catawba Nuclear Station Mail Stop 5 E7 Washington, DC 20555-0001 L. A. Reyes, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303-8931 L. N. 01shan (addressee only)
NRC Senior Project Manager (ONS)
U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 R. E. Martin (addressee only)
NRC Senior Project Manager (CNSIMNS)
U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 Christopher Gratton (addressee only)
NRC Senior Project Manager, Section 1 Project Directorate II Division of Licensing Project Management U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 M. C. Shannon NRC Senior Resident Inspector Oconee Nuclear Station J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station
U.S. Nuclear Regulatory Commission June 26, 2003 Page 5 bxc:
L. E. Nicholson - ON03RC C. J. Thomas - MG01RC G. D. Gilbert - CNO1RC W. W. Foster - ONO1VP B. J. Dolan - MGOlVP R. L. Sweigart - CNOISA P. R. Fowler - EC03P T. W. King - ONOISC W. A. Evans - MGOISC W. T. Byers - CNOISC T. Shafeek - PBO5 L. F. Vaughn - PBO5 NCMPA-1 SREC PMPA NCEMC ONS Master File - ON03DM (File OS 801.01)