December 2003 - Corporate Notification Letter
ML031780395
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/27/2003
From: Gody A
Operations Branch IV
To: Ray H
Southern California Edison Co
References
50-361/03-301, 50-362/03-301 50-361/03-301, 50-362/03-301
Download: ML031780395 (5)


Text

June 27, 2003 Harold B. Ray, Executive Vice President San Onofre, Units 2 and 3 Southern California Edison Co.

P.O. Box 128, Mail Stop D-3-F San Clemente, California 92674-0128

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION - NRC INITIAL OPERATOR LICENSING EXAMINATION NOTIFICATION (EXAMINATION REPORT 50-361; 50-362/03-301)

In a telephone conversation on June 26, 2003, between Messrs. A. Hagemeyer, Manager, Operator Licensing and Simulator, and T. F. Stetka, Chief Examiner, arrangements were made for the administration of licensing examinations at your San Onofre Nuclear Generating Station during the week of December 15, 2003.

As agreed during the telephone conversation, your staff will prepare the operating test and the NRC will prepare the written examination based on the guidelines in Revision 8, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." Your staff will be given the opportunity to review the examinations during the week of October 20, 2003.

To meet the above schedule, it will be necessary for your staff to furnish the reference materials and the operating test integrated outlines by August 11, 2003. Pursuant to 10 CFR 55.40(b)(3),

an authorized representative of the facility licensee shall approve the outlines, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

Southern California Edison Co. and waiver requests (if any)(OMB approval number 3150-0090) no later than November 10, 2003. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date or no later than December 1, 2003.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its enclosure(s), and your response will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Hagemeyer has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Tom Stetka at (817) 860-8247, or myself at (817) 860-8159.

Sincerely,

/RA/

A.T. Gody, Jr., Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-361; 50-362 License Nos.: NPF-10; NPF-15

Southern California Edison Co. cc:

Alan Hagemeyer, Manager, Operator Licensing and Simulator Southern California Edison Co.

San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128 Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Gary L. Nolff Power Projects/Contracts Manager Riverside Public Utilities 2911 Adams Street Riverside, California 92504 Eileen M. Teichert, Esq.

Supervising Deputy City Attorney City of Riverside 3900 Main Street Riverside, California 92522 Joseph J. Wambold, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128 David Spath, Chief Division of Drinking Water and Environmental Management California Department of Health Services P.O. Box 942732 Sacramento, California 94234-7320 Michael R. Olson San Onofre Liaison San Diego Gas & Electric Company P.O. Box 1831 San Diego, California 92112-4150 Ed Bailey, Radiation Control Program Director Radiologic Health Branch California Department of Health Services P.O. Box 942732 (MS 178)

Sacramento, California 94234-7320

Southern California Edison Co. Mayor City of San Clemente 100 Avenida Presidio San Clemente, California 92672 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)

Sacramento, California 95814 Douglas K. Porter, Esq.

Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, California 91770 Dwight E. Nunn, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128 Dr. Raymond Waldo Southern California Edison Company San Onofre Nuclear Generating Station P. O. Box 128 San Clemente, California 92674-0128 A. Edward Scherer Southern California Edison San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128

Southern California Edison Co. Electronic distribution by RIV:

Acting Regional Administrator (TPG)

DRP Director (ATH)

Acting DRS Director (TWP)

Senior Resident Inspector (CCO1)

Branch Chief, DRP/C (KMK)

Senior Project Engineer, DRP/C (WCW)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

ADAMS: G Yes G No Initials: ______

G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive SOE:OB C:OB TFStetka ATGody

/RA/

/RA/

6/27/03 6/28/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax