May 2003 Monthly Operating Report for Palo Verde, Units 1, 2, and 3
ML031760189
Person / Time
Site: Palo Verde  
Issue date: 06/20/2003
From: Danni Smith
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
219-02855-DMS/JMM
Download: ML031760189 (5)


Text

A subsidiary of Pinnacle West Capital Corporation David M. Smith Operatons Director Palo Verde Nudear Generatng Staton Tel. 602-393-2656 Fax 602-393-1806 e-mail:

David M Smith(aipsc.com Mail Station 7294 PO Box 52034 Phoenix, Arizona 85072-2034 June 10, 2003 21 9-02855-DMS/JMM U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for MAY 2003 Enclosed are the Monthly Operating Reports for MAY 2003, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.

If you have any questions, please contact Judy Mellody at (623) 393-6422.

Sincerely, DMS/JMM/mb

Enclosures:

MAY 2003 Monthly Operating Reports cc:

E. W. Merschoff PVNGS Resident Inspector INPO Records Center Utility Data Institute (all w/enclosures)

, ' <

4 i;,"F

Page Two NRC Monthly Operating Report Distribution List 219-02855-DMS/JMM June 10, 2003 bcc:

J. E. Orsborn M. Van Dop J.

Simpkins D. L. Sills G. R. Overbeck File Copy C. D. Mauldin M. K. Banks C. R. Emmett D. G. Marks C. K. Seaman B. J. Hansen C. L. Jury J. E. McDonald S. M. Foote J. M. Levine W. L. Stewart (3146) (all w/enclosures)

(7512)

(7512)

(7565)

(7602)

(7602)

(7605)

(7615)

(7615)

(7636)

(7636)

(7693)

(8983)

(8508)

(8508)

(9046)

(9082)

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Reporting Period:

50-528 PVNGS-1 06/10/03 J. M. Mellodv (623) 393-6422 May 2003

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

1243 3.

4.

5.

6.

UNIT SHUTDOWNS Reason2 Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of May 2003.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

Unit I Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 3,521.8 117,683.0 Hours Generator was On-Line 744.0 3,512.8 116,296.2 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 924,337 4,337,444 140,006,028 No.

Date Outage Duration Hours Typel

'F-Forced S-Scheduled

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Reporting Period:

50-529 PVNGS-2 06/10/03 J. M. Mellodv (623) 393-6422 May 2003

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

1243 3.

4.

5.

6.

UNIT SHUTDOWNS Reason2 Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of May 2003.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

Unit 2 Generatlng Statistics This Month Yr. To Date Cumulative Hours Reactor was Critical 744.0 3,624.0 117,535.5 Hours Generator was On-Line 1

744.0 3,624.0 116,203.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 940,506 4,599,659 141,543,340 No.

Date Outage Duration Hours Type1 1F-Forced S-Scheduled

NRC MONTHLY OPERATINd DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Reporting Period:

50-530 PVNGS-3 06/10/03 J. M. Mellodv (623) 393-6422 May 2003

1.

Design Electrical Rating (Net MWe):

1269

2.

Maximum Dependable Capacity (Net MWe):

1247 Unit 3 Generating Statistics This Month Yr. to Date Cumulative

3.

Hours Reactor was Critical 744.0 2,856.1 113,039.8

4.

Hours Generator was On-Line 744.0 2,834.6 112,030.5

5.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

6.

Net Electrical Energy Generated (MWh) 877,295 3,532,655 137,039,814 UNIT SHUTDOWNS Reason2 Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of May 2003.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

No.

Date Outage Duration Hours Type1 IF-Forced S-Scheduled