Text
Duke
~~~~~~~~~~~~~~~~~~~~Duk Energy Corporation DEuke 526 South Church Street nergy.O.
Box 1006 Charlotte, NC 28201-1006 June 16, 2003 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555
Subject:
Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Monthly Performance and Operation Status-May, 2003 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of May, 2003 and Revision 1 of the Personnel Exposure page, and the unit 1 Monthly Refueling Information Request page for the month of April, 2003.
Please be advised the year-to-date and cumulative values for the gross thermal energy generated (MWM) has been in error from June, 1999 to April, 2003 for units 1 and
- 2. Please advise if these reports submitted in this timeframe should be resubmitted. However this specific data element was omitted for reporting per Generic Letter 97-02 issued May 15, 1997.
Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.
Sincerely, s--,
M. S. Tuckman Executive Vice President Nuclear Generation Duke Power Attachment XC:
L. A. Reyes, Regional Administrator USNRC, Region II Bob Martin, Senior Project Manager USNRC, ONRR
Document Control Desk U.S. NRC -
McGuire INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Scott Schaeffer, Senior Resident Inspector bxc:
C. J. Thomas (MGOlRC)
RGC Site Licensing File ELL (ECO50)
Operating Data Report Docket No.
Date Completed By Telephone Operating Status
- 1. Unit Name:
McGuire 1
- 2. Reporting Period:
May 1, 2003 - May 31, 2003
- 3. Licensed Thermal Power (MWt):
3411
- 4. Nameplate Rating (Gross MWe):
1305 *
- 5. Design Electrical Rating (Net Mwe):
1180
- 6. Maximum Dependable Capacity (Gross MWe):
1144
- 7. Maximum Dependable Capacity(Net MWe):
1100
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-369 June 16.2003 Rofer Williams 704-382-5346
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month
- 11. Hours in Reporting Period 744.0
- 12. Number of Hours Reactor was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator On-Line 744.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Thermal Energy Generated (MWH) 2520829
- 17. Gross Electrical Energy Generated (MWH) 876559
- 18. Net Electrical Energy Generated (MWH) 845098
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (Using MDC Net) 103.3
- 22. Unit Capacity Factor (Using DER Net) 96.3
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Initial Criticality Initial Electricity Commercial Operation YTD 3623.0 3623.0 0.0 3623.0 0.0 12243607 4292586 4145364 100.0 100.0 104.0 97.0 0.0 Cumulative 188447.0 146648.5 0.0 145347.5 0.0 469148862 161795244 155061207 77.1 77.1 72.6 69.7 9.2 Achieved Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50369 UNIT NAME: McGuire 1 DATE: June 16.2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: May. 2003 (1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-616/2003 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
MONTHLY REFUELING INFORMATION REOUEST
- 1.
Facility name:
McGuire Unit 1
- 2.
Scheduled next refueling shutdown: March 2004
- 3.
Scheduled restart following refueling: April 2004 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN TIlS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool:
0I I
- 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
- 9.
Projected date of last refueling which can be accomnodated by present license capacity:
November 2005 DUKE POWER COMPANY DATE: June 16.2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
Operating Data Report Docket No.
Date Completed By Telephone Operating Status
- 1. Unit Name:
McGuire 2
- 2. Reporting Period:
May 1, 2003 - May 31, 2003
- 3. Licensed Thermal Power (MWt):
3411
- 4. Nameplate Rating (Gross MWe):
1305 *
- 5. Design Electrical Rating (Net Mwe):
1180
- 6. Maximum Dependable Capacity (Gross MWc):
1144
- 7. Maximum Dependable Capacity(Net MWe):
1100
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-370 June 16.2003 Roger Williams 704-382-5346
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month
- 11. Hours in Reporting Period 744.0
- 12. Number of Hours Reactor was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator On-Line 744.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Thermal Energy Generated (MWH) 2471433
- 17. Gross Electrical Energy Generated (MWH) 860798
- 18. Net Electrical Energy Generated (MWH) 829515
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (Using MDC Net) 101.4
- 22. Unit Capacity Factor (Using DER Net) 94.5
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
YTD 3623.0 3623.0 0.0 3623.0 0.0 12175249 4263883 4114708 100.0 100.0 103.2 96.2 0.0 Cumulative 168743.0 139409.8 0.0 138156.0 0.0 456363609 158819988 152497502 81.9 81.9 80.1 76.6 5.4
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Comnmercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Comnercial Operation Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page ii, NUREG-0020.
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: June 16. 2003 COMPLETED BY: Rower Williams TELEPHONE: 704-382-5346 REPORT MONTH: My, 2003 (1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C. 6162o03 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
MONTHLY REFUELING INFORMATION REOUEST
- 1.
Facility name:
McGuire Unit 2
- 2.
Scheduled next refueling shutdown: September 2003
- 3.
Scheduled restart following refueling: October 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Comnittee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1061 (c) in the ISFSI: 320
- 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
- 9.
Projected date of last refueling which can be accommodated by present license capacity:
June 2003 DUKE POWER COMPANY DATE: Jne 16.2003 Name of
Contact:
R. A. Williams Phone:
704) - 382-5346
McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT APRIL 2003
- 1.
Personnel Exposure -
The total station liquid release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
Revision 1 McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT MARCH 2003
- 1.
Personnel Exposure -
The total station liquid release for MARCH has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for MARCH has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
REVISION I MONTHLY REFUELING INFORMATION REOUEST
- 1.
Facility name:
McGuire Unit 1
- 2.
Scheduled next refueling shutdown: March 2004
- 3.
Scheduled restart following refueling: April 2004 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1031
- 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
- 9.
Projected date of last refueling which can be accommodated by present license capacity:
November 2005 DUKE POWER COMPANY DATE: May 15.2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346