NRC Ltr Dated 6/13/03 - Senior Reactor Operator and Reactor Operator Initial Examinations (Re-take) - Indian Point Energy Center, Unit 2
ML031640597
Person / Time
Site: Indian Point 
(DPR-026)
Issue date: 06/13/2003
From: Conte R
NRC/RGN-I/DRS/OSB
To: Dacimo F
Entergy Nuclear Operations
Shared Package
ML031631236 List:
References
Download: ML031640597 (4)


Text

June 13, 2003 Mr. Fred Dacimo Vice President - Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 2 P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

SENIOR REACTOR OPERATOR AND REACTOR OPERATOR INITIAL EXAMINATIONS (RE-TAKE) - INDIAN POINT ENERGY CENTER, UNIT 2

Dear Mr. Dacimo:

In telephone conversations on June 12, 2003, between Mr. Todd Fish, Examiner/Inspector, and Mr. William Altic, Senior Instructor, arrangements were made for the administration of re-take licensing examinations (operating test, category C, only) at Indian Point, Unit 2 during the week of August 11, 2003.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors", Revision 8, Supplement 1. The NRC regional office will discuss with your staff any changes that might be necessary before the examination is administered.

To meet the above schedule, it will be necessary for your staff to furnish the examinations and the supporting reference materials identified in Attachment 2 of ES-201 by July 7, 2003.

Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the examination before it is submitted to the NRC for review and approval. All materials should be complete and ready-to-use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examination to be rescheduled.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the examinations are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary senior reactor operator and reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certification (OMB approval number 3150-0024), and waiver requests (OMB approval number 3150-0090) at least 30 days before the examination date. If the application is not received at least 30 days before the examination date, a postponement may be necessary. The signed application certifying that all training has been completed should be submitted at least 14 days before the examination date.

Mr. Fred Dacimo 2

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on April 30, 2003. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Altic has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. Fish at (610) 337-5369, or me at (610) 337-5183.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No.

50-247 License No.

DPR-26 cc w/encl:

G. J. Taylor, Chief Executive Officer, Entergy Operations M. R. Kansler, President - Entergy Nuclear Operations, Inc.

J. Herron, Senior Vice President and Chief Operating Officer C. Schwarz, General Manager - Plant Operations D. Pace, Vice President, Engineering R. Edington, Vice President, Operations Support J. McCann, Manager, Nuclear Safety and Licensing J. Kelly, Director, Nuclear Safety Assurance J. Comiotes, Director, Nuclear Safety Assurance C. Faison, Manager, Licensing H. Salmon, Jr., Director of Oversight J. Fulton, Assistant General Counsel, Entergy Nuclear Operations, Inc.

P. Smith, Acting President, New York State Energy, Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. Eddy, Electric Division, New York State Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

Mr. Fred Dacimo 3

T. Walsh, Secretary, NFSC, Entergy Nuclear Operations, Inc.

D. ONeill, Mayor, Village of Buchanan J. G. Testa, Mayor, City of Peekskill R. Albanese, Executive Chair, Four County Nuclear Safety Committee S. Lousteau, Treasury Department, Entergy Services, Inc.

Chairman, Standing Committee on Energy, NYS Assembly Chairman, Standing Committee on Environmental Conservation, NYS Assembly Chairman, Committee on Corporations, Authorities, and Commissions M. Slobodien, Director, Emergency Planning B. Brandenburg, Assistant General Counsel P. Rubin, Operations Manager Assemblywoman Sandra Galef, NYS Assembly C. Terry, Niagara Mohawk Power Corporation County Clerk, Westchester County Legislature A. Spano, Westchester County Executive R. Bondi, Putnam County Executive C. Vanderhoef, Rockland County Executive E. A. Diana, Orange County Executive T. Judson, Central NY Citizens Awareness Network M. Elie, Citizens Awareness Network D. Lochbaum, Nuclear Safety Engineer, Union of Concerned Scientists Public Citizen's Critical Mass Energy Project M. Mariotte, Nuclear Information & Resources Service F. Zalcman, Pace Law School, Energy Project L. Puglisi, Supervisor, Town of Cortlandt E. Libby, Manager - Operations Training (FOR DRS EXAM REPORTS ONLY)

Congresswoman Sue W. Kelly Congresswoman Nita Lowey Senator Hilary Rodham Clinton Senator Charles Schumer J. Riccio, Greenpeace A. Matthiessen, Executive Director, Riverkeepers, Inc.

M. Kapolwitz, Chairman of County Environment & Health Committee A. Reynolds, Environmental Advocates M. Jacobs, Director, Longview School D. Katz, Executive Director, Citizens Awareness Network P. Gunter, Nuclear Information & Resource Service P. Leventhal, The Nuclear Control Institute K. Copeland, Pace Environmental Litigation Clinic R. Witherspoon, The Journal News W. DiProfio, PWR SRC Consultant W. Poole, PWR SRC Consultant W. Russell, PWR SRC Consultant Distribution w/encl:

Mr. Fred Dacimo 4

Region I Docket Room (with concurrences)

P. Habighorst, SRI - NRC Resident Inspector H. Miller, RA J. Wiggins, DRA H. Nieh, RI EDO Coordinator P. Eselgroth, DRP R. Laufer, NRR P. Milano, PM, NRR G. Vissing, PM, NRR (Backup)

W. Cook, DRP R. Martin, DRP T. Fish, DRS C. Buracker, DRS DRS Files DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML031640597.wpdADAMS PKG: ML031631236 After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBuracker TFish RConte DATE 06/12/03 06/12/03 06/12/03 OFFICIAL RECORD COPY