Text
Duke MICHAEL S.
TUCKMAN EPowere Executive Vice President A Duke Energy Company Nuclear Generation Duke Power P.O. Box 1006 Charlotte, NC 28201-1006 Mailing Address:
526 South Church Street Charlotte, NC 28202 704 382 2200 704 382 4360 fax June 2, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Duke Energy Corporation Oconee Nuclear Station, Units 1, 2, and 3 NRC Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 NRC Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 NRC Docket Nos. 50-413, 50-414 ANSWER, RESPONSE AND REQUEST FOR CLARIFICATION TO APRIL 29, 2003 NRC ORDER FOR COMPENSATORY MEASURES RELATED TO TRAINING ENHANCEMETS ON TACTICAL AND FIREARMS PROFICIENCY AND PHYSICAL FITNESS APPLICABLE TO ARMED NUCLEAR POWER PLANT SECUR1TY FORCE PERSONNEL (EA-03-039)
Section IV of the April 29, 2003, Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Personnel (EA-03-039) ("Order") states that, in accordance with 10 C.F.R. §2.202, a licensee must submit an answer to the Order and may request a hearing on the Order within 35 days of the date of the Order.
Duke Energy Corporation ("Duke") hereby submits its answer (pursuant to 10 C.F.R.
§2.202 and Section IV of the Order) and response (pursuant to 10 C.F.R. §50.4 and Sections III B.1, B.2, and C.1 of the Order) for 50-269, 50-270, 50-287, Oconee Nuclear Station, 50-369, 50-370, McGuire Nuclear Station, and 50-413, 50-414, Catawba Nuclear Station.
Duke consents to the Order and does not request a hearing. As Duke fully intends to comply with the Order, the schedule for achieving compliance with each requirement in Attachment 2 to the Order is enclosed as Attachment 1 to this letter.
However, because the NRC has used force-on-force testing as a standard by which compliance with the DBT was evaluated and because the tactics and capabilities associated with the DBT influence the training prescribed in the Order, Duke requests that the NRC provide a clear definition of the objectives and criteria for force-on-force www. duke-energy. com
U.S. Nuclear Regulatory Commission June 2, 2003 Page 2 exercises so that appropriate revisions can be made to safeguards contingency plans, security plans and security officer training and qualification plans.
Specifically, Duke needs a clear explanation of the purpose of the force-on-force exercise (e.g., is the purpose of force-on-force exercises for security officer training, or to evaluate licensee compliance with the Design Basis Threat?). Similarly, the success criteria for the force-on-force exercise needs to be established (e.g., is the criterion prevention of a large offsite release which would be consistent with the basis for risk-informing NRC regulations, or some other criteria?). Finally, if a force-on-force exercise is going to be used as a performance test of the licensee's ability to protect against the Design Basis Threat, a clear definition of adversary rules of engagement and adversary tactics is needed to provide appropriate predictability and stability in the regulatory program.
Absent these clarifications, the standard by which licensee performance will be measured will continue to be a constantly moving target which is counter to the Commission's Principles of Good Regulation.
To enable Duke to meet the compliance dates specified in the Order, the requested clarifications are needed as soon as possible. If the clarifications cannot be provided by October 1, 2003, we respectfully request that the Director, Nuclear Reactor Regulation extend the dates for full implementation of the Order on a day-for-day basis until such clarifications are provided.
Duke also confirms its understanding that the Commission intends to exercise enforcement discretion to accommodate issues which may arise as licensees, in good faith, take reasonable actions to implement the specific requirements of this Order. We further understand that the Commission will exercise enforcement discretion for the period necessary to resolve such issues and to integrate the requirements of this Order with the orders issued February 25, 2002, as well as with other pertinent regulatory requirements, and our safeguards contingency plans, security plans and security officer training and qualification plans.
If you have any questions regarding this submittal, please contact Dana L. Boies, Nuclear Regulatory & Industry Affairs, at (704) 382-1694.
Very truly yours,
-41..
M. S. Tuckman Attachments
U.S. Nuclear Regulatory Commission June 2, 2003 Page 3 M. S. Tuckman, affinns that he is the person who subscribed his name to the foregoing statement, and that all the matters and facts set forth herein are true and correct to the best of his knowledge.
M. S. Tuckman Subscribed and swom to me:
dt7)-
2 2003 Date Notary 0blicj My Commission Expires: Uj vJ D2 MX Date SEAL
U.S. Nuclear Regulatory Commission June 2, 2003 Page 4 xc:
S. J. Collins, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 5 E7 Washington, DC 20555-0001 Annette L. Vietti-Cook, Secretary of the Commission U. S. Nuclear Regulatory Conmission ATIN: Rulemakings and Adjudications Staff Washington, D. C. 20555-0001 (and by e-mail to hearingdocket@nrc.gov)
D. C. Dambly, Assistant General Counsel for Materials Litigation and Enforcement Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 (and by e-mail to OGCMailCenter@nrc.gov)
L. A. Reyes, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303-8931 L. N. Olshan (addressee only)
NRC Senior Project Manager (ONS)
U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-001 R. E. Martin (addressee only)
NRC Senior Project Manager (CNSIMNS)
U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 M. C. Shannon NRC Senior Resident Inspector Oconee Nuclear Station J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station E. F. Guthrie NRC Senior Resident Inspector Catawba Nuclear Station
U.S. Nuclear Regulatory Commission June 2, 2003 Attachment, Page 1 of 1 Schedule For Implementation Of Compensatory Measures Related To Training Enhancements On Tactical And Firearms Proficiency And Physical Fitness Applicable To Armed Nuclear Power Plant Security Force Personnel C. 1 Implementation of the requirements of this section began immediately upon receipt of the Order and will continue through October 29, 2004.
C. 2. a. 1-5 Lesson plans and training programs consistent with these requirements will be developed and approved no later than October 31, 2003. Individual training components of these requirements will be completed no later than October 29, 2004.
C. 2. a. 6 Current program meets these requirements. No additional actions are required.
C.2.b This requirement will be implemented prior to the implementation of the individual training components as listed in C. 2. a. 1-5.
C. 3. a. 1 This requirement will be completed by October 29, 2004 C. 3. a. 2-3 Procedures will be revised to meet these requirements no later than October 31, 2003.
C.4 Current program meets these requirements. No additional actions are required.