Transmittal of Emergency Plan Implementing Procedure, EP-PS-247
ML031560700
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/29/2003
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML031560700 (7)


Text

May. 29, 2003 Page of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMI-TTAL 2003-26079 EMPL#:28401 CA#:0363 TRANSMITTAL INFORMA]

TO: 'JTIfl3E 05/29/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY-OR ELECTRONIC: MANUAL ASSIGNED TO YOU:

247 - 247 - FIELD TEAM DIRECTOR REMOVE MANUAL TABLE OF CONTENTS DATE: 03/06/2003 D MANUAL TABLE OF CONTENTS DATE: 05/28/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-247 ADD: PCAF 2003-1378 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

<2'

-, 2 PROCEDURE CHANGE PROCESS FORM

1. PCAF NO. 'O3-/3 7?8 2. PAGE 1 OF 5-6 fly 13. PROC. NO. EP-PS-247 REV. 1
4. FORMS REVISED - E R,- R_, - R-, - R_ - R_,- _ R
5. PROCEDURE TITLE Field Team Director
6. REQUESTED CHANGE PERIODIC REVIEW NO Ii YES INCORPORATE PCAFS 3 NO E1 YES # _ _ -

RE VISION PCAF DELETION* (CHEC"KONE ONLY)

7.

SUMMARY

OF/REASON FOR CHANGE /

Correction of premature incorporation of text wording. The text in the instruction's Tab E is not scheduled to be there until late June 2003. The correction will make the letter Tab E match the method in numeric Tab 4.

The methodology in Tab 4 is correct and would have enabled correct calculation of PAG fraction and correct use of the PAR process.

The change in w6fding of Tab E is considered administrative because it provides dlrection to use the method in Tab 4, which is correct. The premature incorporation of wording may lead to confusion among users, so should be corrected. (Wording approximately the same as what isthere now will be placed back into the procedure at about the end of June 2003, consistent with changes then to the methodology in Tab 4.)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ ~~~~~~~~~~~~~Continued

8. DETERMINE COMMITTEE REVIEW REQUIREMENTS (Refer to Section 6.1.4) ,=

PORC REVIEW REQ'D? NO ,' YES 9. PORC MTG# - A BLOCKS 11 THRU 16 ARE ON PAGE 2 OF FORM

17. Richard L. Doty ,1x220-7932 / 01723 18COMNCATION OF CHANGE REQUIRED?

PREPARER +ETNi,:

- DATE O 3NO [1YES (TYPE)'

(Print or Type) ,N, ' -

SIGNATURE ATTESTS THAT RESPONSIBLE SUPERVISOR HAS

. r {: < :CONDUCTED QADR AND TECHNICAL REVIEW UNLESS OTHERWISE V% nE  :: VI RSE NSI O

_- s C lIt o> DOCUMENTED IN BLOCK 16 OR ATTACHED REVIEW FORMS.

~~~~~~~CROSS DISCIPLINE REVIEW (IF REQUIRED) HAS BEEN COMPLETED R*SNSIP'E SUPERVISOR <DATE BY SIGNATURE IN BLOCK 16 OR ATTACHED REVIEW FORMS.

I UM APPROVAL DATE

21. RESPONSIBLE APPROVER ENTER N/A IFFUM HAS APPROVAL AUTHORITY IIT S DATE

.,,ii il MAY F 21 - g I

- FORM NDAP-QA-0002-8, Rev. 8, Page 1 of 2 (Electronic Form) i

PROCEDURE CHANGE PROCESS FORM l1. PCAF NO. a12. PAGE 20F 13. PROC. NO. EP-PS-247 REV. 1

11. This question documents the outcome of the 50.59 and 72.48 Review required by NDAP-QA-0726. Either lla, b, c or d must be checked "YES" and the appropriate form attached or referenced.
a. This change is an Administrative Correction for which 50.59 and 72.48 are not Z YES LI N/A applicable.
b. This change is a change to any surveillance, maintenance or administrative F YES S N/A procedure for which 50.59 and 72.48 are not applicable.
c. This change is bounded by a 50.59172.48 Screen/Evaluation, therefore, no new 2 YES z N/A 50.59172.48 Evaluation is required.

Screen/Evaluation No.

d. 50.59 and/or 72.48 are applicable to this change and a 50.59/72A8 F YES 3 N/A Screen/Evaluation is attached.
12. This change is consistent with the FSAR or an FSAR change is required. Z YES Change Request No.
13. Should this change be reviewed for potential effects on Training Needs or Material? YES Z NO If YES, enter arrAction Item @ NIMS/Action/Gen Work Mech/PICN
14. Is a Surveillance Procedure Review Checklist required per NDAP-QA-0722? LI YES s NO
15. Is a Special, Infrequent or Complex Test/Evolution Analysis Form required per YES Z NO NDAP-QA-0320? (SICT/E form does not need to be attached.)
16. Reviews may be documented below or by attaching Document Review Forms NDAP-QA-0101-1.

REVIEWED BY WITH DATE REVIEW NO COMMENTS QADR TECHNICAL REVIEW REACTOR ENGINEERING/NUCLEAR FUELS * - _

IST OPERATIONS NUCLEAR SYSTEMS ENGINEERING NUCLEAR MODIFICATIONS MAINTENANCE HEALTH PHYSICS NUCLEAR TECHNOLOGY CHEMISTRY OTHER 10CFR 50.54Q 7?A7-a

  • Required for changes that affect, or have potential for affecting core reactivity, nuclear fuel, core power level indication or impact the thermal power heat balance. (58)

Required for changes to Section Xi Inservice Test Acceptance Criteria.

FORM NDAP-QA-0002-8, Rev. 8, Page 2 of 2 (Electronic Form)

PAGE

> 3 O F EP-PS-247 Page 2 of 3 FIELD TEAM DIRECTOR: Emergency-Plan-Position-Specific Instruction WHEN: Activation of the Emergency Operations Facility HOW NOTIFIED: Paged/Telephone REPORT TO: Dose Assessment Supervisor WHERE TO REPORT: Emergency Operations Facility OVERALL DUTY:

Direct the emergency environmental field monitoring efforts to determine the sigjificance of airbome and liquid releases MAJOR TASKS: TAB: REVISION:

Initial actions and status determination for the TAB A 0 Field Team Director.

Field Team monitoring with the Remote TAB B 0 Monitoring System, (RMS), fully operational.

Field Team monitoring with the RMS partially TAB C operational:

  • Loss of Locational Telemetry and/or
  • Loss of Radiological Telemetry Field Team monitoring with the RMS TAB D 0 inoperable.

Performance of liquid release calculations TAB E Shift Tumover TAB F 0

i PCAF #L60 .- t TAB E PAGE4Of-~ Revision VIj Page of 3

,z MAJOR TASK:

i Performance of liquid release calculations SPECIFIC TASKS: HOW:

Confirm a liquid release into the l a. Contact the TSC Chemistry Coordinator Susquehanna river, to confirm there has been a liquid release into the river equal to or exceeding Technical Requirements.

NOTE:

Technical Requirements limits are ten times the effluent cgrncentrations; for Unrestricted areas as listed in Appendix B, Table 2, 10 CFR20.1001-20.2402.

I b. Obtain the following release information:

(1) Time release started (2) Time release stopped (if applicable)

(3) Cooling Tower blowdown discharge line rate.

(4) Cooling tow6r blowdown discharge to the river.

(5) Spray pond release rate (if applicable)

(6) Spray pond water elevation (if applicable)

(7) Radionuclide(s) and activities in the release (8) River depth (at river intake or Env. Lab.)

(9) Sample locations (10) Previous liquid release calculations (11) Notifications made

F'AF # +/-3]S TAB E PAGF .0F G-mr.- Revision .e EP-PS-247-E Page 2 of 3 SPECIFIC TASKS: HOW:

2. Notify the Dose Assessment NOTE:

Supervisor, (DASU), when a liquid Remind the DASU to ensure the release into the river is equal to or Radiological Liaison notifies the Danville exceeds Technical Requirements Water Company of the release and limits. activation of the SSES Emergency Plan.

NO RECOMMENDATIONS SHOULD BE MADE TO THE DANVILLE WATER COMPANY.

3. Notify the Public Information Manager NOTE:

when-a liquid release into the river is Telephone numbers-are located in the equal to or exceeds Technical Emergency Telephone Directory Requirements. available at each workstation.

4. Perform a liquid release calculation to HELP facilitate a PAR determination. -Liquid Discharge Data Sheets See TAB 4 4a. Obtain the results of the gamma analysis for a sample of the water being released into the Susquehanna river from the TSC Chemistry Coordinator.

4b. Determine which of thefiften TAB. Z radionuclides listed in -prts 1,11 andl11 of the "Liquid Discharge Data Sheet" have been identified in the sample.

4c. Enter the activity concentrations, (uCi/ml), for these radionuclides in the appropriate table in the applicable part of the "Liquid Discharge Data Sheet".

Enter zeros for the activity concentrations of the listed radionuclides that were not identified in the sample.

PA-5 4d. Determine the EG-fraction for each individual radionuclide identified in the sample using either Part 1,11or I ftthe "Liquid Discharge Data Sheet". of

-,fAF 4 ruAF # r42~-7(*Z72 PAGE G OF. .. _ TABE EP-PS-247-E

- Revision4G I Page 3 of 3 SPECIFIC TASKS: HOW:

PA-6 4e. Determine the diluted sum of the [C fractions at Danville using Pert of the "Liquid Discharge Data Sheet". rzt-*

4f. Notify the DASU when the diluted sum of the EC fractions at Danville exceed 0.85.

5. Direct Emergency Environmental 5a. Reference EP-PS-248, ("Environmental Sampling Teams in the monitoring of Sampling Director' instruction), Tab E.

an unusual liquid release.

5b. When necessary, call out a second FTD to perform the function of Environmental Sampling Director.