ML031530723

From kanterella
Jump to navigation Jump to search
April 18, 2003 - RIC 2003 Presentation - F3 - Ellis W. Merschoff - Region IV Breakout
ML031530723
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/18/2003
From: Kane W, Merschoff E, Overbeck G
Arizona Public Service Co, NRC/EDO, NRC Region 4
To:
References
Download: ML031530723 (23)


Text

RIC 2003 Region IV Breakout Session F3 NRC Decision Making Process April 18, 2003 Ellis W. Merschoff Regional Administrator, Region IV USNRC William F. Kane, Deputy Executive Director for Reactor Programs Executive Director for Operations USNRC Gregg Overbeck, Senior Vice President Arizona Public Power Company

April 18, 2003 Page 2 Industry and Public Participation NRC Decision-Making Process



Event Response



Significance Determination Process (SDP)



Non-SDP Escalated Enforcement



Notice of Enforcement Discretion (NOED)



Substantive Cross-Cutting Issues



Technical Specification Changes



10 CFR 10.109 (Backfits)



Generic Communications



Region Specific Topics

April 18, 2003 Page 3 Event Response Special Inspections, Supplemental Inspections, Augmented Team Inspections, Incident Investigations NRC Process Licensee Involvement Public Involvement

April 18, 2003 Page 4 Significance Determination Process (SDP)

Reactor Oversite Process Safety Significance NRC Process Licensee Involvement Public Involvement

April 18, 2003 Page 5 Non-SDP Escalated Enforcement 10 CFR 50.7, 50.9, et. al NRC Process Licensee Involvement Public Involvement

April 18, 2003 Page 6 NOTICE OF ENFORCEMENT DISCRETION (NOED)

NRC Process Licensee Involvement Public Involvement

April 18, 2003 Page 7 SUBSTANTIVE CROSS-CUTTING ISSUES Reactor Oversite Process NRC Process Licensee Involvement Public Involvement

April 18, 2003 Page 8 Technical Specification Changes NRC Process Licensee Involvement Public Involvement

April 18, 2003 Page 9 10 CFR 50.109 Backfit Rule NRC Process Licensee Involvement Public Involvement

April 18, 2003 Page 10 GENERIC COMMUNICATIONS NRC Process Licensee Involvement Public Involvement

April 18, 2003 Page 11 REGION-SPECIFIC TOPICS NRC Process Licensee Involvement Public Involvement

April 18, 2003 Page 12 Significance Determination Process (SDP)

Reactor Oversite Process Safety Significance NRC Process



Initial Problem Identification (Licensee, Resident, Regional Inspector)



Phase One Assessment (Inspector)



Phase Two Assessment (Inspector with SRA Assistance)



SRA Assessment



Phase Three Assessment (SRA with NRR Assistance)



Significance and Enforcement Review Panel (Region, OE, NRR)



Regulatory Conference



Final Significance Determination



Follow-up Inspection for Corrective Action Effectiveness Licensee Involvement



Initial Assessment per Corrective Action Program



Continual Interaction for Technical Accuracy during Phases One, Two and Three



Exit Report Feedback Mechanisms



Regulatory Conference



Regulatory Performance Meeting Public Involvement



Publicly Docketed Interactions



Requests for Additional Information



Docketed Risk Assessments



NRC Inspection Reports



Meeting Summaries



Public Meetings



Regulatory Conference



Regulatory Performance Meeting



Annual Assessment Meeting

April 18, 2003 Page 13 SDP Background Information



NRC References MC 0305 MC 0608 MC 0609 MC 0612



Key Points of Interaction Technical Interaction between Licensee and NRC throughout Phases One, Two and Three Technical Adequacy of Risk Tools (Licensee and NRC)

Consideration of External Risk Effects Consideration of Common Cause Implications Integration of Regional and NRR Risk Assessments SERP Regulatory Meeting

April 18, 2003 Page 14 Non-SDP Escalated Enforcement 10 CFR 50.7, 50.9, et. al NRC Process



Traditional Enforcement Process



Finding beyond the scope of the ROP or identified from OI



Licensee Notification (Letter or Inspection Report)



Preliminary Decision (Weekly Conference with Program Office and OE)



Enforcement Conference



Final Resolution (Collaborative decision between Region, HQ, OE)

Licensee Involvement



Initial Notification (Inspection Finding, Chilling Effect Letter, OI Referral)



Fact Finding (Inspection or Investigation)



Enforcement Conference Public Involvement



Publicly Docketed Interactions



Requests for Additional Information



NRC Inspection Reports



Meeting Summaries



Public Meetings



Enforcement Conference

April 18, 2003 Page 15 Non-SDP Escalated Enforcement Background Information



NRC References MC 0305 MC 0612 Enforcement Manual and Policy



Key Points of Interaction Initial Notification - NRC to Licensee (especially if a potentially chilling environment concern)

OI Investigation Communication Findings (Inspection or Investigation)

Enforcement Conference

April 18, 2003 Page 16 Notice of Enforcement Discretion (NOED)

NRC Process



Notification of Condition (Resident Inspector, Regional Oversight, Licensee)



Initial Assessment of Risk (SRA with Licensee)



Internal Review of Condition (Regional or HQ NOED)



Request by Licensee



Written Submission, if possible



Telephonic Conference with Region and NRR Basis for Request Risk Neutrality Compensatory Measures



Confirmation of NOED Authorization Authority



Granting/Denial of NOED (Verbal)



Written Submission by Licensee



Written Response by NRC



Inspection Follow-up Licensee Involvement



Daily Operational Communications (Anticipating Potential Need)



Preliminary Conference Calls



Understanding Condition and Basis for Request



Clarifying Risk Neutrality



Compensatory Measures



Operations during NOED Conditions



Written Submission



Follow-up Inspection Public Involvement ALL AFTER THE FACT



Licensee Written Request for NOED



NRC Approval



Inspection Follow-up (Report)

April 18, 2003 Page 17 NOED Background Information



NRC References MC Part 9900 MC 0609 MC 0612



Key Points of Interaction Initial Notification of Condition Early Understanding of Potential Need for an NOED Early Clarification of Risk Significance Early Understanding of the Technical Challenges Facing the Licensee Telephone Conference Call Requesting NOED Following the NOED Checklist Risk Neutrality Not a previous pass on STS Amendment Compensatory Measures During NOED Condition Increased Startup Threshold Follow-up Inspection

April 18, 2003 Page 18 Substantive Cross-Cutting Issues Reactor Oversite Process Findings NRC Process



BOTH of the Following Must Be Met



Multiple Documented Findings



Human Performance



Problem Identification and Resolution, or



Safety Conscious Work Environment



Common Theme



Documented in Mid-Cycle or Annual Assessment Letter



Issue Discussed During Annual Public Meeting



Follow-up Inspection



Baseline Procedure, or



Problem Identification And Resolution Inspection Licensee Involvement



Issue MUST be Entered into the Corrective Action Program



Discussion during Annual Public Meeting Public Involvement



Docketed Correspondence



Inspection Reports



Mid-Cycle Review Letters



Annual Assessment Letter



Annual Public Meeting (Comment or Question)

April 18, 2003 Page 19 Substantive Cross-Cutting Issues Background Information



NRC References MD 8.13 MD 8.19 MC 0305 MC 0612 IP 71152



Key Points of Interaction Continuous Resident Inspector Oversight and Evaluation Region Reactor Projects Division Interactions Mid-Cycle or Annual Assessment Letters Discusses Closure, if the Issue has been Resolved Discusses Progress, if the Issues has not been Resolved

April 18, 2003 Page 20 Technical Specification Changes NRC Process



Written Submittal



Licensee Generated Request



NSSS Developed Topicals



Generic Issues Developed Positions



Staff Manager Review



NRR Project Manager



NRR Technical Staff



Requests for Additional Information



Technical Resolutions



Posting in Federal Register



Resolution of Formal Comments



Issuance of Amendment/Licensing Actions Licensee Involvement



Development of Initial Request



Licensee Engineering/Regulatory Affairs Organizations



Participation on NSSS Committees



Resolution of Technical Issues from the Staff



Written Responses to RAIs



Technical Meetings with the Staff



Development of Implementing Strategies and Procedures



New Procedures



Transition Training



Transition Operations Public Involvement



Docketed Technical Correspondence



Initial Licensing Request



RAIs and Responses



Public Comment Period



FR Notice



Hearing Request

April 18, 2003 Page 21 Tech Spec Change Background Information



NRC References 10 CFR 50.

Standard Review Plans Project Managers Task Manual



Key Points of Interaction Planning and Prioritization Process by Licensee Allows for Adequate Resource Planning by the Staff Ensures Efficient Handling of Licensee Request RAI Request and Resolution Process Transition from OLD TS to NEW TS Develop New Procedures Conduct Just-in-Time Training Conduct On-Going Continuing Training

April 18, 2003 Page 22 10 CFR 50.109 Backfit Rule NRC Process



Identification of Backfit Potential



Letter from Licensee



Allegation Process



NRC Self-Identification



Acknowledgement of Entering Backfit Process



Letter to Licensee



Memo to OEDO



Panel Review of Backfit Claim



Communication of Decision



Letter to Licensee



Memo to OEDO



Cost/Benefit Analysis if Backfit Decision is Affirmed



Appeals Process for Denied Backfit Licensee Involvement



Submission of Backfit Claim



Responses to Requests for Additional Information (RAI)



Appeals, as considered necessary



Technical Submissions for Cost/Benefit Analyses Public Involvement



Docketed Correspondence Only

April 18, 2003 Page 23 Backfit Rule Background Information



NRC References 10 CFR 50.109 MD 8.4



Key Points of Interaction Technical Information Exchange During Submission and Panel Review Process During Cost/Benefit Analyses During Appeals Process Enforcement Process (After the Final Decision)

NOTE:

THESE ACTIVITIES ARE ALMOST ALWAYS CONTROVERSIAL