MONTHYEARML24038A1742024-02-0707 February 2024 Pre-submittal Meeting Slides ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML24003A8532024-01-0303 January 2024 January 4, 2024 Presubmittal Meeting Presentation-Risk Informed Process for Evaluations (RIPE) License Amendment Request for Safety Injection Tank (SIT) LCO (EPID: L?2023?LRM-0108) ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan ML23192A0102023-07-11011 July 2023 NRC RIPE 7-11-23 Public Meeting Presentation Slides ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line ML23093A0252023-04-30030 April 2023 April 5, 2023, Presubmittal Meeting Presentation - Containment Temperature and Safety Injection Tank Volume Requirements LAR ML23090A1392023-04-0404 April 2023 April 4, 2023 Presubmittal Meeting Presentation - LAR to Adopt TSTF-266, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (EPID: L?2023?LRM-0017) ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) ML22096A0052022-04-0606 April 2022 TSTF-487 LAR Pre-submittal Public Meeting Presentation Slides ML22025A0012022-01-25025 January 2022 1/25/22 Pre-submittal Meeting Presentation Slides for RR-69 to Extend Containment Tendon Inspection by Three Months Beyond 2/8/22 ML21342A0502021-12-0808 December 2021 TSTF-567 LAR Pre-submittal Public Meeting Presentation Slides ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides ML21194A2502021-08-10010 August 2021 RIC 2021 - Ai EPRI-Artificial Intelligence and Development at EPRI ML21131A0132021-05-13013 May 2021 License Transfer from Pnm to SRP, 5-13-21 Pre-submittal Public Meeting Presentation Slides ML21025A0032021-01-26026 January 2021 Risk-Informed Process for Evaluations (RIPE) - NEI Public Meeting Presentation Slides ML21025A0042021-01-25025 January 2021 Risk-Informed Process for Evaluations (RIPE) - NRC Public Meeting Presentation Slides ML20171A2352020-06-24024 June 2020 Inservice Testing - Supplemental Position Indication Relief Request - NRC Pre-Application Meeting - June 24, 2020 ML19192A0972019-07-11011 July 2019 License Amendment Request for Emergency Plan, July 11, 2019 ML18299A0722018-09-26026 September 2018 Ionizing Radiation Factsheet-Veterans - Information for Veterans and Their Families ML17320A1932017-11-15015 November 2017 NRC Public Meeting, Treatment of Mitigating Strategies in Risk Informed Decision Making ML17003A0332016-12-29029 December 2016 Enclosure 2 - APS Meeting Slides ML16357A6872016-12-20020 December 2016 One-Time License Amendment Request Unit 3 Train B Diesel Generator ML17003A0862016-11-0303 November 2016 Enclosure 2 Slides Regulatory Audit Report for November 2-3, 2016 ML16253A4112016-09-0707 September 2016 Palo Verde Nuclear Generating Station Generic Letter 2004-02 - September 7, 2016 ML16083A4722016-03-24024 March 2016 NRC Subsequent Pre-Submittal Meeting Next Generation Fuel - Palo Verde, Units 1, 2, and 3 ML16014A1102016-01-20020 January 2016 Draft APS Slides for January 20, 2015, Public Meeting with APS Regarding Upcoming Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15244B2632015-08-27027 August 2015 Slides for Public Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde Regarding Revised Methodology for Spent Fuel Pool Criticality Analysis ML15236A1342015-08-26026 August 2015 Presentation Slides for Public Meeting with Arizona Public Service Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15159B2972015-06-0909 June 2015 Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Arizona Public Service, Palo Verde Nuclear Generating Station Public Meeting - June 9, 2015 ML15156B3312015-06-0909 June 2015 Public Meeting Slides on R2.1 Seismic Hazard Re-Evaluation ML15156B3522015-06-0404 June 2015 Draft Slides for Public Meeting with Arizona Public Service Company Ongoing Resolution of Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15134A3592015-05-11011 May 2015 5/11/2015, Meeting Slide Regarding Pre-Submittal Meeting for Palo Verde Unit 1, 2, and 3 Updated Spent Fuel Pool Criticality Analysis ML15126A2072015-05-11011 May 2015 Presentation Slides for Prelicensing Meeting with Arizon Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3, ML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle ML15070A2522015-02-18018 February 2015 Pre-Submittal Public Meeting Final Slides on Risk-Informed Completion Times. ML15042A4152015-02-11011 February 2015 Pre-Submittal Public Meeting Draft Slides on Risk- Informed Completion Times ML14184B4112014-06-11011 June 2014 Nrc/Nei/Utility MTG 6/11/14 ML14149A5092014-04-23023 April 2014 4/23/14 Meeting Slide for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Re. Sig Tube Inspection ML14098A1832014-04-0202 April 2014 4/2/2014 Meeting Slide for Bottom-Mounted Instrument (Bmi) Relief Request 52 Pre-Submittal Meeting ML13309A7202013-11-0505 November 2013 Meeting Presentation for November 5, 2013 Public Meeting Regarding Incorporation of NEI 11-04 Into the QA Program at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML13308B3322013-11-0404 November 2013 Meeting Presentation for November 4, 2013 Public Meeting Regarding Bmi Leakage ML13308C3402013-11-0404 November 2013 SG Unit 3 Telephone Call ML13025A2832013-01-29029 January 2013 NRC Comments on Draft Integrated Plans, Palo Verde ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12243A4352012-08-30030 August 2012 8/30/2012 Meeting RR 48 - Phased Array Ultrasonic Examination in Lieu of Radiography ML12243A4382012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT Vs Rt Discussion ML12243A4472012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT in Lieu of Rt for Nuclear Power Plant Applications ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML11188A0722011-07-0606 July 2011 NRC Meeting with NEI and Licensees June 28, 2011 Workshop Engineering Approach Rev F 2024-02-07
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24038A1742024-02-0707 February 2024 Pre-submittal Meeting Slides ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML24003A8532024-01-0303 January 2024 January 4, 2024 Presubmittal Meeting Presentation-Risk Informed Process for Evaluations (RIPE) License Amendment Request for Safety Injection Tank (SIT) LCO (EPID: L?2023?LRM-0108) ML23296A0162023-10-20020 October 2023 October 20, 2023 Presubmittal Meeting Presentation - 1R24 Pressurizer Nozzle Repair - RR-70 (EPID: L?2023?LLR-0057) ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan ML23192A0102023-07-11011 July 2023 NRC RIPE 7-11-23 Public Meeting Presentation Slides ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line ML23093A0252023-04-30030 April 2023 April 5, 2023, Presubmittal Meeting Presentation - Containment Temperature and Safety Injection Tank Volume Requirements LAR ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) ML22312A5952022-11-0808 November 2022 Independent Spent Fuel Storage Installation, Submittal of Annual Financial Reports 2021 ML22299A1812022-10-26026 October 2022 Presubmittal Meeting Presentation - License Amendment Request - Adoption of TSTF-107-A Separate Control Rods That Are Untrippable Versus Inoperable and Change to TS 3.1.5 Condition B (EPID: L?2021?LRM-0081) ML22096A0052022-04-0606 April 2022 TSTF-487 LAR Pre-submittal Public Meeting Presentation Slides ML22025A0012022-01-25025 January 2022 1/25/22 Pre-submittal Meeting Presentation Slides for RR-69 to Extend Containment Tendon Inspection by Three Months Beyond 2/8/22 ML21342A0502021-12-0808 December 2021 TSTF-567 LAR Pre-submittal Public Meeting Presentation Slides ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides ML21278B0912021-10-0606 October 2021 Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (EPID L-2021-LRM-0104) (Slides) ML21243A5432021-09-0101 September 2021 Request for Partial Exemption from 10 CFR 50.62(c)(1) Risk-Informed Process for Evaluations (RIPE) ML21194A2502021-08-10010 August 2021 RIC 2021 - Ai EPRI-Artificial Intelligence and Development at EPRI ML21165A1832021-06-14014 June 2021 RR-67 6-16-21 Pre-Submittal Public Meeting Presentation Slides ML21131A0132021-05-13013 May 2021 License Transfer from Pnm to SRP, 5-13-21 Pre-submittal Public Meeting Presentation Slides ML21130A6462021-05-13013 May 2021 Pre-Submittal Meeting with NRC on May 13, 2021 Application for Transfer of Minority Interests in Palo Verde Nuclear Generating Station, Units 1 and 2 Subject to Expiring Leases ML21055A8502021-02-24024 February 2021 Public Meeting Summary ML21025A0032021-01-26026 January 2021 Risk-Informed Process for Evaluations (RIPE) - NEI Public Meeting Presentation Slides ML21025A0042021-01-25025 January 2021 Risk-Informed Process for Evaluations (RIPE) - NRC Public Meeting Presentation Slides ML21011A2752021-01-0606 January 2021 License Amendment Request (LAR) to Revise Containment Leakage Rate Testing Program Frequencies - NRC Pre-Submittal Meeting, January 6, 2021 (Presentation Slides) ML20171A2352020-06-24024 June 2020 Inservice Testing - Supplemental Position Indication Relief Request - NRC Pre-Application Meeting - June 24, 2020 ML19060A2982019-03-0101 March 2019 Transmittal of Audit Presentation Slides Regarding License Amendment Request and Exemption Request to Support the Implementation of Framatome CE16HTP Fuel ML17003A0762017-01-10010 January 2017 Regulatory Audit Report for the November 2-3, 2016, Audit at the Westinghouse Facility in Rockville, MD, for the License Amendment and Exemption Requests Associated with Next Generation Fuel (CAC Nos. MF8076-MF8081) ML17003A0352017-01-0404 January 2017 Summary of Pre-Application Meeting with Arizona Public Service to Discuss a Proposed Second Emergency License Amendment Request to Revise Technical Specification 3.8.1, AC (Alternating Current) Sources - Operating, for Palo Verde Nuclear ML17003A0332016-12-29029 December 2016 Enclosure 2 - APS Meeting Slides ML17003A0862016-11-0303 November 2016 Enclosure 2 Slides Regulatory Audit Report for November 2-3, 2016 ML16253A4112016-09-0707 September 2016 Palo Verde Nuclear Generating Station Generic Letter 2004-02 - September 7, 2016 ML16083A4722016-03-24024 March 2016 NRC Subsequent Pre-Submittal Meeting Next Generation Fuel - Palo Verde, Units 1, 2, and 3 ML16014A1102016-01-20020 January 2016 Draft APS Slides for January 20, 2015, Public Meeting with APS Regarding Upcoming Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15348A0542015-12-15015 December 2015 Slides for December 17, 2015 Public Meeting with APS on Resolution of GL 2004-02 ML15244B2632015-08-27027 August 2015 Slides for Public Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde Regarding Revised Methodology for Spent Fuel Pool Criticality Analysis ML15236A1342015-08-26026 August 2015 Presentation Slides for Public Meeting with Arizona Public Service Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15159B2972015-06-0909 June 2015 Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Arizona Public Service, Palo Verde Nuclear Generating Station Public Meeting - June 9, 2015 ML15156B3312015-06-0909 June 2015 Public Meeting Slides on R2.1 Seismic Hazard Re-Evaluation ML15134A3592015-05-11011 May 2015 5/11/2015, Meeting Slide Regarding Pre-Submittal Meeting for Palo Verde Unit 1, 2, and 3 Updated Spent Fuel Pool Criticality Analysis ML15126A2072015-05-11011 May 2015 Presentation Slides for Prelicensing Meeting with Arizon Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3, ML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle ML15070A2522015-02-18018 February 2015 Pre-Submittal Public Meeting Final Slides on Risk-Informed Completion Times. ML15042A4152015-02-11011 February 2015 Pre-Submittal Public Meeting Draft Slides on Risk- Informed Completion Times ML14184B4112014-06-11011 June 2014 Nrc/Nei/Utility MTG 6/11/14 ML14149A5092014-04-23023 April 2014 4/23/14 Meeting Slide for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Re. Sig Tube Inspection ML14098A1832014-04-0202 April 2014 4/2/2014 Meeting Slide for Bottom-Mounted Instrument (Bmi) Relief Request 52 Pre-Submittal Meeting ML13309A7202013-11-0505 November 2013 Meeting Presentation for November 5, 2013 Public Meeting Regarding Incorporation of NEI 11-04 Into the QA Program at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML13308B3322013-11-0404 November 2013 Meeting Presentation for November 4, 2013 Public Meeting Regarding Bmi Leakage ML13197A0952013-07-11011 July 2013 7/11/13 Meeting Slides - Implementation of STAR Program and Replacement of the 2/3 Cycle Mtc Measurement 2024-02-07
[Table view] |
Text
RIC 2003 Region IV Breakout Session F3 NRC Decision Making Process April 18, 2003 Ellis W. Merschoff Regional Administrator, Region IV USNRC William F. Kane, Deputy Executive Director for Reactor Programs Executive Director for Operations USNRC Gregg Overbeck, Senior Vice President Arizona Public Power Company
Industry and Public Participation NRC Decision-Making Process Event Response Significance Determination Process (SDP)
Non-SDP Escalated Enforcement Notice of Enforcement Discretion (NOED)
Substantive Cross-Cutting Issues Technical Specification Changes 10 CFR 10.109 (Backfits)
Generic Communications Region Specific Topics April 18, 2003 Page 2
Event Response Special Inspections, Supplemental Inspections, Augmented Team Inspections, Incident Investigations NRC Process Licensee Involvement Public Involvement April 18, 2003 Page 3
Significance Determination Process (SDP)
Reactor Oversite Process Safety Significance NRC Process Licensee Involvement Public Involvement April 18, 2003 Page 4
Non-SDP Escalated Enforcement 10 CFR 50.7, 50.9, et. al NRC Process Licensee Involvement Public Involvement April 18, 2003 Page 5
NOTICE OF ENFORCEMENT DISCRETION (NOED)
NRC Process Licensee Involvement Public Involvement April 18, 2003 Page 6
SUBSTANTIVE CROSS-CUTTING ISSUES Reactor Oversite Process NRC Process Licensee Involvement Public Involvement April 18, 2003 Page 7
Technical Specification Changes NRC Process Licensee Involvement Public Involvement April 18, 2003 Page 8
10 CFR 50.109 Backfit Rule NRC Process Licensee Involvement Public Involvement April 18, 2003 Page 9
GENERIC COMMUNICATIONS NRC Process Licensee Involvement Public Involvement April 18, 2003 Page 10
REGION-SPECIFIC TOPICS NRC Process Licensee Involvement Public Involvement April 18, 2003 Page 11
Significance Determination Process (SDP)
Reactor Oversite Process Safety Significance NRC Process
< Initial Problem Identification (Licensee, Resident, Regional Inspector)
< Phase One Assessment (Inspector)
< Phase Two Assessment (Inspector with SRA Assistance)
< SRA Assessment
< Phase Three Assessment (SRA with NRR Assistance)
< Significance and Enforcement Review Panel (Region, OE, NRR)
< Regulatory Conference
< Final Significance Determination
< Follow-up Inspection for Corrective Action Effectiveness Licensee Involvement
< Initial Assessment per Corrective Action Program
< Continual Interaction for Technical Accuracy during Phases One, Two and Three
< Exit Report Feedback Mechanisms
< Regulatory Conference
< Regulatory Performance Meeting Public Involvement
< Publicly Docketed Interactions Requests for Additional Information Docketed Risk Assessments NRC Inspection Reports Meeting Summaries
< Public Meetings Regulatory Conference Regulatory Performance Meeting Annual Assessment Meeting April 18, 2003 Page 12
SDP Background Information NRC References
- MC 0305
- MC 0608
- MC 0609
- MC 0612 Key Points of Interaction
- Technical Interaction between Licensee and NRC throughout Phases One, Two and Three
- Technical Adequacy of Risk Tools (Licensee and NRC)
- Consideration of External Risk Effects
- Consideration of Common Cause Implications
- Integration of Regional and NRR Risk Assessments
- Regulatory Meeting April 18, 2003 Page 13
Non-SDP Escalated Enforcement 10 CFR 50.7, 50.9, et. al NRC Process
< Traditional Enforcement Process
< Finding beyond the scope of the ROP or identified from OI
< Licensee Notification (Letter or Inspection Report)
< Preliminary Decision (Weekly Conference with Program Office and OE)
< Enforcement Conference
< Final Resolution (Collaborative decision between Region, HQ, OE)
Licensee Involvement
< Initial Notification (Inspection Finding, Chilling Effect Letter, OI Referral)
< Fact Finding (Inspection or Investigation)
< Enforcement Conference Public Involvement
< Publicly Docketed Interactions Requests for Additional Information NRC Inspection Reports Meeting Summaries Public Meetings Enforcement Conference April 18, 2003 Page 14
Non-SDP Escalated Enforcement Background Information NRC References
- MC 0305
- MC 0612
- Enforcement Manual and Policy Key Points of Interaction
- Initial Notification - NRC to Licensee (especially if a potentially chilling environment concern)
- OI Investigation
- Communication Findings (Inspection or Investigation)
- Enforcement Conference April 18, 2003 Page 15
Notice of Enforcement Discretion (NOED)
NRC Process
< Notification of Condition (Resident Inspector, Regional Oversight, Licensee)
< Initial Assessment of Risk (SRA with Licensee)
< Internal Review of Condition (Regional or HQ NOED)
< Request by Licensee Written Submission, if possible Telephonic Conference with Region and NRR
< Confirmation of NOED Authorization Authority
< Granting/Denial of NOED (Verbal)
< Written Submission by Licensee
< Written Response by NRC
< Inspection Follow-up Licensee Involvement
< Daily Operational Communications (Anticipating Potential Need)
< Preliminary Conference Calls Understanding Condition and Basis for Request Clarifying Risk Neutrality Compensatory Measures
< Operations during NOED Conditions
< Written Submission
< Follow-up Inspection Public Involvement ALL AFTER THE FACT
< Licensee Written Request for NOED
< NRC Approval
< Inspection Follow-up (Report)
April 18, 2003 Page 16
NOED Background Information NRC References
- MC Part 9900
- MC 0609
- MC 0612 Key Points of Interaction
- Initial Notification of Condition
- Early Understanding of Potential Need for an NOED
- Early Clarification of Risk Significance
- Early Understanding of the Technical Challenges Facing the Licensee
- Telephone Conference Call Requesting NOED
- Following the NOED Checklist
- Not a previous pass on STS Amendment
- Compensatory Measures During NOED Condition
- Increased Startup Threshold
- Follow-up Inspection April 18, 2003 Page 17
Substantive Cross-Cutting Issues Reactor Oversite Process Findings NRC Process
< BOTH of the Following Must Be Met
< Multiple Documented Findings Human Performance Problem Identification and Resolution, or Safety Conscious Work Environment
< Common Theme
< Documented in Mid-Cycle or Annual Assessment Letter
< Issue Discussed During Annual Public Meeting
< Follow-up Inspection Baseline Procedure, or Problem Identification And Resolution Inspection Licensee Involvement
< Issue MUST be Entered into the Corrective Action Program
< Discussion during Annual Public Meeting Public Involvement
< Docketed Correspondence Inspection Reports Mid-Cycle Review Letters Annual Assessment Letter
< Annual Public Meeting (Comment or Question)
April 18, 2003 Page 18
Substantive Cross-Cutting Issues Background Information NRC References
- MD 8.13
- MD 8.19
- MC 0305
- MC 0612
- IP 71152 Key Points of Interaction
- Continuous Resident Inspector Oversight and Evaluation
- Region Reactor Projects Division Interactions
- Mid-Cycle or Annual Assessment Letters
- Discusses Closure, if the Issue has been Resolved
- Discusses Progress, if the Issues has not been Resolved April 18, 2003 Page 19
Technical Specification Changes NRC Process
< Written Submittal Licensee Generated Request NSSS Developed Topicals Generic Issues Developed Positions
< Staff Manager Review NRR Project Manager NRR Technical Staff
< Requests for Additional Information
< Technical Resolutions
< Posting in Federal Register
< Resolution of Formal Comments
< Issuance of Amendment/Licensing Actions Licensee Involvement
< Development of Initial Request
< Licensee Engineering/Regulatory Affairs Organizations
< Participation on NSSS Committees
< Resolution of Technical Issues from the Staff Written Responses to RAIs Technical Meetings with the Staff
< Development of Implementing Strategies and Procedures New Procedures Transition Training
< Transition Operations Public Involvement
< Docketed Technical Correspondence Initial Licensing Request RAIs and Responses
< Public Comment Period FR Notice
< Hearing Request April 18, 2003 Page 20
Tech Spec Change Background Information NRC References
- 10 CFR 50.
- Standard Review Plans
- Project Managers Task Manual Key Points of Interaction
- Planning and Prioritization Process by Licensee
- Allows for Adequate Resource Planning by the Staff
- Ensures Efficient Handling of Licensee Request
- RAI Request and Resolution Process
- Transition from OLD TS to NEW TS
- Conduct Just-in-Time Training
- Conduct On-Going Continuing Training April 18, 2003 Page 21
10 CFR 50.109 Backfit Rule NRC Process
< Identification of Backfit Potential Letter from Licensee Allegation Process NRC Self-Identification
< Acknowledgement of Entering Backfit Process Letter to Licensee Memo to OEDO
< Panel Review of Backfit Claim
< Communication of Decision Letter to Licensee Memo to OEDO
< Cost/Benefit Analysis if Backfit Decision is Affirmed
< Appeals Process for Denied Backfit Licensee Involvement
< Submission of Backfit Claim
< Responses to Requests for Additional Information (RAI)
< Appeals, as considered necessary
< Technical Submissions for Cost/Benefit Analyses Public Involvement
< Docketed Correspondence Only April 18, 2003 Page 22
Backfit Rule Background Information NRC References
- 10 CFR 50.109
- MD 8.4 Key Points of Interaction
- Technical Information Exchange
- During Submission and Panel Review Process
- During Cost/Benefit Analyses
- Enforcement Process (After the Final Decision)
NOTE: THESE ACTIVITIES ARE ALMOST ALWAYS CONTROVERSIAL April 18, 2003 Page 23