North Anna Unit 2 Reactor Vessel Head Replacement David A. Heacock Site Vice President April 18, 2003 RIC 2003 Region II Breakout - Session F1
North Anna 2 RV Head Replacement 2
Agenda
- Unit 2 CRDM Issue
- Design and Licensing
- Challenges
- Lessons Learned
- Regulatory Interface
North Anna 2 RV Head Replacement 3
Typical Penetration
North Anna 2 RV Head Replacement 4
North Anna Pent 53 Indications
North Anna 2 RV Head Replacement 5
Design and Licensing
- Reconcile code of record - RCC-M to Owners Requirements
- NAPS-2 not a Code Stamped Vessel
- Friction weld on CRDM penetration tubes
- Acceptability of French QA program
- Assemble reconciliation package
- Assemble code data package
- Perform stress analyses
North Anna 2 RV Head Replacement 6
Design and Licensing
- Develop design engineering packages
- Engr. Transmittal to allow Head Set
- DCP for new RV Head
- DCP for modified Service Structure
- 3 DCPs in phases for Access Opening
- Obtain concurrence from NRC:
- 50.59 approach for replacement head
- Containment testing approach
- NRC Final Review of documentation packages
READY FOR LIFT TO TRANSPORTER
North Anna 2 RV Head Replacement 8
TRANSPORTER ARRIVAL AT NAPS
SETTING CUTTING EQUIPMENT ON PLATFORM CUTTING EQUIPMENT IN OPERATION CUTTING EQUIPMENT IN OPERATION
EXPOSED REBAR FIRST CUT COMPLETE - WAITING FOR REBAR REMOVAL
North Anna 2 RV Head Replacement 11
North Anna 2 RV Head Replacement 12 LATCH HOUSING MECHANICAL CUTTING AND CRDM REMOVAL Key points:
- Preserve latch housing integrity
- Prevent damage to latch housing thread
North Anna 2 RV Head Replacement 13 MACHINING & LIQUID PENETRANT TEST
- Key points to insure weld quality:
- to remachine the weld edge
- to meet the base metal
North Anna 2 RV Head Replacement 14 LATCH HOUSING WELD INSERT TACK WELDING Casing Fuse insert Penetration X
OLD HEAD ON PLATFORM READY FOR LIFT
NEW HEAD ON PLATFORM TOP HAT BEING REMOVED
NEW HEAD READY FOR MOVE INTO CONTAINMENT
ReBar Being Reinstalled
ReBar Installation Complete Building Concrete Forms Concrete Forms Complete
New Head Assembly
Moving New Head to Cavity
North Anna 2 RV Head Replacement 22 Transportation
- 30 days required for submitting transportation plan in France and U.S.
- U.S. Customs pre-staged for clearance
- Russian heavy-lift aircraft retained to move head from Lyon to Richmond
- Specialized trucks used to move head in France and the U.S.
North Anna 2 RV Head Replacement 23 50.59 Determination
- NAPS-2 is not a Code Stamped Vessel
- It was designed and licensed to Owners Requirements
- Replacement head has been evaluated to conform to Owners Requirements, hence --
- The project was performed under 50.59
- No formal NRC approval was required
North Anna 2 RV Head Replacement 24 50.59 Determination
- Approach discussed with NRR in early October in a series of telecons
- Public Meeting held at Dominion on October 29, 2002
- NRC concurred with approach, but ---
- NRC formally requested an opportunity to review the documentation packages
- NRC also visited French regulator and mfgr
North Anna 2 RV Head Replacement 25 50.59 Determination
- NRC advised that the main challenges would be related to:
- QA Program reconciliation
- Use of friction welding specifically excluded by ASME Section III
- Reconciliation of RCC-M Code to Owners requirements
North Anna 2 RV Head Replacement 26 QA Program
- QA Audit team dispatched to France from 10-21 to 10-31
- French program derived from US program
North Anna 2 RV Head Replacement 27 Friction Weld
- Penetration tube to CRDM adapter weld used friction welding process
- Basically, hold one piece still; spin the other very fast; push them together and they fuse
- Used successfully in over 40 French vessel heads; significant history with no events
- French code and process requirements very well refined
North Anna 2 RV Head Replacement 28 Friction Weld
- Basis of reconciliation was effectiveness of French program
- US Codes not well-defined as a basis of comparison (Sect III N/A; Sect IX weak)
North Anna 2 RV Head Replacement 29 Code Reconciliation
- Identified all applicable ASME manufacturing and pre-service requirements that define Owners Requirements
- Applicable portions of ASME III (68) and special provisions of design specification
- Mapped all documentation into those requirements and identified deltas
- Used ASME 95 with 96 addenda as basis
- Performed a reconciliation to ASME III (68)
North Anna 2 RV Head Replacement 30 Code Reconciliation
- Reconciliation basis was then developed for each delta
- NOTE: French code was developed from ASME.
- There was a high degree of correlation between the codes
- The factory does both RCC-M and ASME work so parallel quals existed for workers
North Anna 2 RV Head Replacement 31 Stress Analyses
- Westinghouse provided inputs for dead load, seismic and LOCA loads
- Westinghouse provided design inputs on physical interface equipment
- Framatome developed stress analyses
- Vessel Head
- Lifting Ring
North Anna 2 RV Head Replacement 32 Stress Analyses
- French approach relies on acceptability of the computer code and focuses on outputs
- U.S. approach expects documentation of methodology to create a stand-alone report
North Anna 2 RV Head Replacement 33 Disposal
- Envirocare contracted to take possession of old RV head
- WMG provided truck transportation across the U.S. to Utah
- Costs to store on site or dispose were fairly close
- Need to consider capital vs. O&M
North Anna 2 RV Head Replacement 34 Lessons Learned
- Do not attempt to do this job this way !!!
- Take firm control of your documentation packages; special attention to resources and planning of engineering efforts is necessary.
- Use of experienced company personnel is a must
- Use of experienced prime contractors is a must
North Anna 2 RV Head Replacement 35 Lessons Learned
- Define the lines of communication among the project team members and to the Station
- Strong and flexible project planning -
coordinate the prime contractors and outage planning
- Establish a presence in the prime contractors offices including the mfgr.
- Clear communications with the regulator
North Anna 2 RV Head Replacement 36 Regulatory Interface
- Constant and effective communications from NRC
- Efficient NRC Task Team documentation reconciliation reviews
- Prompt turn-around on exemption requests
- On-site NRC inspection activities well coordinated
- Excellent cooperation by the NRC
Comments or Questions?