ML031410017

From kanterella
Jump to navigation Jump to search
Site, Core Operating Limits Report (COLR)
ML031410017
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 05/12/2003
From: Rosalyn Jones
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ONEI-0400-70, Rev 17
Download: ML031410017 (36)


Text

ADuke R. A. JONES Vice President A Duke Energy Company Duke Power 29672 / Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax May 12, 2003 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Oconee Nuclear Site Docket No. 50-287 Core Operating Limits Report (COLR)

Gentlemen:

Attached, pursuant to Oconee Technical Specifications 5.6.5, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 3, Cycle 21, Rev. 17.

Ve ruly yours, Jones Site, Vice President Oconee Nuclear Site Attachment JYcoD www.duke-energy.com

NRC Document Control Desk May 12, 2003 Page 2 xc w/att: Mr. L. A. Reyes, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Mr. L. N. Olshan, Project Manager Office of Nuclear Reactor Regulation Mr. Mel Shannon Senior Resident Inspector Oconee Nuclear Site

DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO PRIORI_1111MIX00" THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS Date: 04/11/03 PRIORI

___________ OTHERWISE IDENTIFIED BELOW Document Transmittal #: DUK031010003

1) 00620 DOC MGMT DUKE FILMED MAN EC03C
2) 00813 DOC MGMT EC03C ORIGINAL_ M Yes ] No Duke Power Company QA CONDITION
4) 06700 ONS MANUAL MASTER FILE ON03DM DOICUMENT TRANSMITTAL FORM OTHER ACKNOWLEDGEMENT REQUIRED D Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE
5) 06937 R RST CLAIR EC08G ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

REFERENCE NUCLEAR GENERAL OFFICE Duke Power Conpany OCONEE NUCLEAR STATION 7800 Rochester Highway Document Management WORK ITEM: M-7 ON02DM RESP GROUP: NE Seneca, South Carolina 29672 CORE OPERATING LIMITS REPORT OCONEE 3 CYCLE 21 Recd By Page 1 of 1 Date A

I DOCUMENT NO QA COND I

REV #/ DATE 1

DISTR CODE 1

I I1 2

i 1S 1 4 15 1 I 6 17 1II 8

I 9

II 10 1 1

12 1 13 114 15 I

TOTAL ONEI-0400-070 I 017 04/11/03 NOMD-27 VI x vi VI 4 F4 r; FOR INFORMATION )NLY G'0 REMARKS: DUKE K S CANADY TOTAL PAGES: 33 DOCUMENT RELEASE EXEMPT FROM NUCLEAR MODIFICATION PROGRAM. MANAGER NUCLEAR ENGINEERING BY:

J W SIMMONS JWS/TER EC08H

ONEI-0400-70 Rev 17 Page 1 of 33 FOR INFORMATION ONLY Duke Power Company Oconee 3 Cycle 21 FOR INFORMATION ONLY Core Operating Limits Report MVWGAND AP DITCM QA Condition I 0APftft#JCft3r

_w _ _ a A Ma oiV- -i -- l- - q Prepared By R. W. Murray Date: i%Ape z203 Checked By L. D. McClain ;L "- ISCri Date: 10 fpr iODS3 CDR By: R. G. Chow  ; Date: 4/. /zc3 Approved By: R. R. St. Clair /t, S/, lz.4> Date:

Document No./ Rev. ONEI-0400-70 (Rev. 17)

Date 9-Apr-2003 Page No. 2 of 33 INSPECTION OF ENGINEERING INSTRUCTIONS Inspection Waived By: Date: __ _A __3 (Sponsor)

CATAWBA Inspection Waived MCE (Mechanical & Civil) E Inspected By/Date:

RES (Electrical Only) E Inspected By/Date:

RES (Reactor) E Inspected By/Date:

MOD I Inspected By/Date:

Other ( Inspe.cted By/Date:

l)

OCONEE Inspection Waived MCE (Mechanical & Civil) Inspected By/Date:

) RES (Electrical Only) Inspected By/Date:

RES (Reactor) Inspected By/Date:

MOD Inspected By/Date:

Other ( ) Inspected By/Date:

MCGUIRE Inspection Waived MCE (Mechanical & Civil) El Inspected By/Date:

RES (Electrical Only) [ Inspected By/Date:

RES (Reactor) [ Inspected By/Date:

MOD El Inspected By/Date:

Other ( ) Inspected By/Date:

ONEI-0400-70 Rev 17 Page 3 of 33 Oconee 3 Cycle 21 Core Operating Limits Report Insertion Sheet for Revision 17 This revision is not valid until the end of operation for Oconee 3 Cycle 20.

Remove these revision 16 pages Insert these revision 17 pages 1-31 1-33 Revision Log Effective Pages Pages Pages Total Effective Revision Date Revised Added Deleted Pages lOconee 3 Cycle 21 revisions below l lI 17 Apr. 2003 1 - 31 32 - 33 - 33 Oconee 3 Cycle 20 revisions below I 16 Oct. 2002 1 - 3, 5 - - 31 15 Nov. 2001 1-3 - - 31 14 Nov. 2001 1 - 31 - - 31 rOconee 3 Cycle 19 revisions below I 13 Apr. 2000 1 - 31 - - 31

ONEI-0400-70 Rev 17 Page 4 of 33 Oconee 3 Cycle 21 1.0 Error Adjusted Core Operating Limits The Core Operating Limits Report for 03C21 has been prepared in accordance with the requirements of ITS 5.6.5. The core operating limits within this report have been developed using NRC approved methodology identified in references 1 through 10. The RPS protective limits and maximum allowable setpoints are documented in references 11 through 13. These limits are validated for use in 03C21 by references 14 through 16. The 03C21 analyses assume a design flow of 107.5% of 88,000 gpm per RCS pump, radial local peaking (FAh) of 1.714, and axial peaking factor (Fz) of 1.5, and an EOC

( 100 ppmB) Tavg reduction of up to 10 F provided 4 RCPs are in operation and Tavg does not decrease below 569 F.

The error adjusted core operating limits included in section 1 of the report incorporate all necessary uncertainties and margins required for operation of the 03C21 reload core.

1.1 References

1. Nuclear Design Methodology Using CASMO-3 / SIMULATE-3P, DPC-NE-1 004P-A, Revision 0, SER dated November 23, 1992.
2. Oconee Nuclear Station Reload Design Methodology II, DPC-NE-1002A, Revision 1, SER dated October 1, 1985.
3. Oconee Nuclear Station Reload Design Methodology, NFS-1001A, Revision 5, SER dated December 8, 2000.
4. ONS Core Thermal Hydraulic Methodology Using VIPRE-01, DPC-NE-2003P-A, Revision 1, SER dated June 23, 2000.
5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005P-A, Revision 2, SER dated June 8,1999.
6. Fuel Mechanical Reload Analysis Methodology Using TACO3, DPC-NE-2008P-A, SER dated April 3,1995.
7. UFSAR Chapter 15 Transient Analysis Methodology, DPC-NE-3005-PA, Revision 1, SER dated May 25,1999.
8. DPC-NE-3000P-A, Thermal Hydraulic Transient Analysis Methodology, Rev. 2, SER dated October 14, 1998.
9. BAW-10192-PA, BWNT LOCA - BWNT Loss of Coolant Accident Evaluation Model for Once-Through Steam Generator Plants, SER dated February 18, 1997.
10. BAW-10227-PA, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, SER dated February 4, 2000.
11. Variable Low Pressure Safety Limit, OSC-4048, Revision 4, January 2001.
12. Power Imbalance Safety Limits and Tech Spec Setpoints Using Error Adjusted Flux-Flow Ratio of 1.094, OSC-5604, Revision 2, October 2001.
13. ATc and EOC Reduced Tavg Operation, OSC-7265, Rev. 1, Duke Power Co., June 2002.
14. 03C21 Maneuvering Analysis, OSC-8178, Revision 0, November 2002.
15. 03C21 Specific DNB Analysis, OSC-8220, Revision 0, October 2002.
16. 03C21 Reload Safety Evaluation, OSC-8400, Revision 0, April 2003.

ONEI-0400-70 Rev 17 Page 5 of 33 Oconee 3 Cycle 21 Miscellaneous Setpoints BWST boron concentration shall be greater than 2220 ppm and less than 3000 ppm.

Referred to by ITS 3.5.4.

Spent fuel pool boron concentration shall be greater than 2220 ppm.

Referred to by ITS 3.7.12.

The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.

Referred to by ITS SLC 16.5.13.

CFT boron concentration shall be greater than 1835 ppm. The average boron concentration in the CFT's shall be less than 4000 ppm. Referred to by ITS 3.5.1.

RCS and Refueling canal boron concentration shall be greater than 2220 ppm.

Referred to by ITS 3.9.1.

Shutdown Margin (SDM) shall be greater than 1% Ak/k.

Referred to by ITS 3.1.1.

Moderator Temperature Coefficient (MTC) shall be less than: MTCx 1-4 Linear interpolation is valid within the table provided. Ap /F  % FP

) Referred to by ITS 3.1.3. +0.70 0

+0.40 15 0.00 80

-0.125 100

-0.25 120 Departure from Nucleate Boiling (DNB) parameter for RCS loop pressure shall be Referred to by ITS 3.4.1. 4 RCP: measured hot leg pressure > 2125 psig 3 RCP: measured hot leg pressure > 2125 psig DNB parameter for RCS loop average temperature shall be: Max Loop Tavg (Incl 2°F unc)

Referred to by ITS 3.4.1. ATc, F 4 RCP Op 3 RCP Op 0 581.0 581.0

  • The measured Tavg must be less than COLR limits minus 1 581.4 581.2 instrument uncertainty. ATc is the setpoint value selected by 2 581.8 581.4 the operators, Values are expanded by linear interpolation on 3 582.1 581.7 page 33 of this document without instrument uncertainty. 4 582.5 581.9 5 582.9 582.1
  • This limit is applied to the loop with the lowest loop average temperature consistent with the NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.

DNB parameter for RCS loop total flow shall be: 4 RCP: Measured > 107.5 %df Referred to by ITS 3.4.1. 3 RCP: Measured > 74.7 % of 4 RCP min flow Regulating rod groups shall be withdrawn in sequence starting with group 5, group 6, and finally group 7.

Referred to by ITS 3.2.1.

Regulating rod group overlap shall be 25% +/- 5% between two sequential groups.

Referred to by ITS 3.2.1.

ONEI-0400-70 Rev 17 Page 6 of 33 Oconee 3 Cycle 21 Steady State Operating Band Rod Index APSR %WD EFPD Min Max Min Max 0 to 445 292 +/- 5 300 30 40 445 to EOC 292 +/- 5 300 100 100 Quandrant Power Tilt Setpoints Steady State Transient Maximum Core Power Level, %FP 30 - 100 0 - 30 30 - 100 0 - 30 0 - 100 Full Incore 3.50 7.57 7.07 9.36 16.51 Out of Core 2.39 6.09 5.63 7.72 14.22 Backup Incore 2.26 3.87 3.63 4.81 10.07 Referred to by ITS 3.2.3.

ONEI-0400-70 Rev 17 Page 7 of 33 Oconee 3 Cycle 21 Variable Low RCS Pressure RPS Setpoints Referred to by ITS 3.3.1 2400 P = 2355 psig T =618 F 2300 2200 Acceptable QL Operation 2100 U)

P= 11.14* Tout4706 0

0 2000 CD 1900 Unacceptable Operation 1800 - P= 1800 psig T =584 F 1700 I i 540 560 580 600 620 640 Reactor Coolant Outlet Temperature, °F

ONEI-0400-70 Rev 17 Page 8 of 33

)

Oconee 3 Cycle 21 RPS Power Imbalance Setpoints

% FP  % Imbalance 4 Pumps 0 -33.0 90.4 -33.0 107.9 -14.4 107.9 14.4 90.4 33.0 0 33.0 3 Pumps 0 -33.0 63.1 -33.0 80.6 -14.4 80.6 14.4 63.1 33.0 0 33.0 Maximum Allowable RPS Power Imbalance Setpoints

% FP  % Imbalance 4 Pumps 0 -35.0 90 -35.0 109.4 -14.4 109.4 14.4 90 35.0 0 35.0 3 Pumps 0 -35.0 62.3 -35.0 81.7 -14.4 81.7 14.4 62.3 35.0 0 35.0

ONEI-0400-70 Rev 17 Page 9 of 33 Oconee 3 Cycle 21 Operational Power Imbalance Setpoints Full Backup Out of

%FP Incore Incore Core 4 Pumps 0 -25.6 -25.1 -25.6 80 -25.6 -25.1 -25.6 90 -22.5 -22.1 -22.5 100 -14.3 -14.0 -14.3 102 -12.7 -12.3 -12.7 102 17.0 17.0 17.0 100 19.1 18.9 19.1 I 90 24.9 24.5 24.9 I

80 27.6 27.1 27.6 0 27.6 27.1 27.6 3 Pumps 0.0 -25.6 -25.1 -25.6 68.87 -25.6 -25.6 69.35 -25.1 77.0 -12.7 -12.3 -12.7 77.0 17.0 17.0 17.0 67.46 27.1 66.98 27.6 27.6 0.0 27.6 27.1 27.6

)

ONEI-0400-70 Rev 17 Page 10 of 33 Oconee 3 Cycle 21 Operational Power Imbalance Setpoints Operation with 4 RCS Pumps, BOC to EOC

% FP I RPS Trip I Full Incore Alarm I Out of Core Alarm 107.9 -14.40 14.40 107 -15.36 15.36 106 -16.42 16.42 105 -17.48 17.48 104 -18.55 18.55 103 -19.61 19.61 102 -20.67 20.67 -12.70 17.00 -12.70 17.00 101 -21.73 21.73 -13.50 18.05 -13.50 18.05 100 -22.80 22.80 -14.30 19.10 -14.30 19.10 99 -23.86 23.86 -15.12 19.68 -15.12 19.68 98 -24.92 24.92 -15.94 20.26 -15.94 20.26 97 -25.99 25.99 -16.76 20.84 -16.76 20.84 96 -27.05 '27.05 -17.58 21.42 -17.58 21.42 95 -28.11 28.11 -18.40 22.00 -18.40 22.00 94 -29.17 29.17 -19.22 22.58 -19.22 22.58 93 -30.24 30.24 -20.04 23.16 -20.04 23.16 92 -31.30 31.30 -20.86 23.74 -20.86 23.74 91 -32.36 32.36 -21.68 24.32 -21.68 24.32 90.4 -33.00 33.00 -22.17 24.67 -22.17 24.67 90 -33.00 33.00 -22.50 24.90 -22.50 24.90 89 -33.00 33.00 -22.81 25.17 -22.81 25.17 88 -33.00 33.00 -23.12 25.44 -23.12 25.44 87 -33.00 33.00 -23.43 25.71 -23.43 25.71 86 -33.00 33.00 -23.74 25.98 -23.74 25.98 85 -33.00 33.00 -24.05 26.25 -24.05 26.25 84 -33.00 33.00 -24.36 26.52 -24.36 26.52 83 -33.00 33.00 -24.67 26.79 -24.67 26.79 82 -33.00 33.00 -24.98 27.06 -24.98 27.06 81 -33.00 33.00 -25.29 27.33 -25.29 27.33 80 -33.00 33.00 -25.60 27.60 -25.60 27.60 0 -33.00 33.00 -25.60 27.60 -25.60 27.60

% FP j RPS Trip Full Incore Alarm Out of Core Alarm ONEI-0400-70 Rev 17 Page 11 of 33 Oconee 3 Cycle 21 Operational Power Imbalance Setpoints Operation with 3 RCS Pumps, BOC to EOC

°/ FP RPS Trip

_ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ Full ncore Alarm

_ _ _ _ Al a m _ Out of Core Alarm

__I_ _

80.6 -14.40 14.40 80 -15.04 15.04 79 -16.10 16.10 78 -17.16 17.16 77.0 -18.23 18.23 -12.70 17.00 -12.70 17.00 76 -19.29 19.29 -14.29 18.06 -14.29 18.06 75 -20.35 20.35 -15.88 19.12 -15.88 19.12 74 -21.41 21.41 -17.46 20.18 -17.46 20.18 73 -22.48 22.48 -19.05 21.23 -19.05 21.23 72 -23.54 23.54 -20.64 22.29 -20.64 22.29 71 -24.60 24.60 -22.23 23.35 -22.23 23.35 70 -25.67 25.67 -23.81 24.41 -23.81 24.41

! 69 -26.73 26.73 -25.40 25.47 -25.40 25.47 68.9 -26.86 26.86 -25.60 25.60 -25.60 25.60 68 -27.79 27.79 -25.60 26.53 -25.60 26.53 67 -28.85 28.85 -25.60 27.58 -25.60 27.58 66.98 -28.87 28.87 -25.60 27.60 -25.60 27.60 66 -29.92 29.92 -25.60 27.60 -25.60 27.60 65 -30.98 30.98 -25.60 27.60 -25.60 27.60 64 -32.04 32.04 -25.60 27.60 -25.60 27.60 63.1 -33.00 33.00 -25.60 27.60 -25.60 27.60 63 -33.00 33.00 -25.60 27.60 -25.60 27.60 62 -33.00 33.00 -25.60 27.60 -25.60 27.60 61 -33.00 33.00 -25.60 27.60 -25.60 27.60 60 -33.00 33.00 -25.60 27.60 -25.60 27.60 0 -33.00 33.00 -25.60 27.60 -25.60 27.60

% FP J FIF RPS Trip A. l Full Incore Alarm I A Out of Core Alarm ONEI-0400-70 Rev 17 Page 12 of 33 Oconee 3 Cycle 21 RPS Power Imbalance Setpoints Referred to by ITS 3.3.1 Thermal Power Level, %FP 120

(-14.4,107.9) (14.4,107.9)

I 100 -

Ml = 0.941 M2 = -0.941 Acc Operation

(-33,90.4) (33,90.4)

(-14.4,80.6) (14.4,80.6) l

(-33,63.1) 60 - (33,63.1)

Acceptable 3 or 4 Operation 40 -

20 -

,\ l l

g  :

-4 0 -30 -20 -10 0 10 20 30 40 Percent Power Imbalance

ONEI-0400. .ev 17 Page 13 of 33 Oconee 3 Cycle 21 Imbalance Setpoints for 4 Pump Operation, BOC to EOC 110 -Y

-RPS

. TripI Setpoint

--. r LI_'--_ ~2 T . +---t

I . '

.4 -- 4-I-

4--~ -I-

: .I~ T i 4

~7

- I .- -...

~

.~

. 7-..: .- ! ..

I -- I U

. - ...7I *.-i.

100 ...; I _._. . - :4

________ '.--r

- +- +

J.-- V+/-t Incore & Outcore Alarm 33.T* RPS Trip Setpoint

.__ -e

. . . __1_

- ... : 1 - -  ;-

--.--. I --r-1 -.- - . -1 .1. r.. .. ..

o

!O.t 71 -,' . 1.

.1 _. .

"71--. -.

__ ;* -4.- ' [--Z _T_' -41:

I 1 t I ..........

_._. -... I _.. ..

. ..J_ I .-.

,T-i. -

r1-r---

90 T . I I

11-I I.

g l--Tr

  • I s 1

I I I

  • I i- W --- 9-+

1- ZiElL.. .__

4 -1 i --tI --,--

1


_.L' - T- J T::... . . . .

- ": 7 ' . 1- .!- 1 7' - .= -'T' i ,

.::-L. .r:l.-. .:4__++_177 I _' i -r=-- .-. -.. T.....I.---

__i4,---

- .L -

4 - II T,-t "I..-

80 t-.-r--

i--I-) ~ ---

-I+-r .-

4-4 -1.-

1r2*- ."... i.-I ...-

_1 _T-__ f __ 4... i_l-__ .-

-i J....";I.. T---

-1. _.. 11.-..

ml 4 I" I + I-L~T-- 1 t r-r -- .r

'- I-

.- t --

70 ' -7 L.- T7-I-1 '-1

.- ' . 4 4 i

-I --

: i op I I i  ! i r

4 1- ---,

'  :  ! ' '  ; . 1 i . i - s- i . - I

.IL 1-:..

=.

--I I.~

_ _. 17,-,7- .... I.

C1) _: :7 , __ -- - :2. -.-

_;- 1

.1-

-- 'T .1-

-r-0 I J 1 --L._i__ - -- 4 --j --f I --f -I -- i .+,-..i'..

- _- ....-.11-

-ZF (L 60 1 7 "---" - ' -4 ..

- -J- ---

-. I--- - ? -

i I.! -4---i.- j ..j -j-+- r 77 _ j -T.- ...

. . -t 0 .7. .__.; -- - I 1C (L) 50 I.. i-t- . -4..-- -. 7. _.. . i __ .. t. - i -. ---" __ - i

.i -i ..4__ ...t-4 _:'7.-

C1) ..- .....

-4_. r

'-i __..--J.

+/-;. i4. j 4 4: . f~J- - ;- Y4 -r

[L - .~ .. 4 t .. _

.J _ 4 z.-

- 4 ..-.. lj z4 . T. 2 r:tz r . I -

40 30 77T 4~~~~~~~~-_:. -L 20 10 ' < t 4~~~~~~~~~~~~~r . " ... E c~~~~~~~~~~~~~~~~t

~~~~~d ...-...

4 4~-~~~~~ ~ -4 . j~~~~~ . . v 1 - ~ ~ ~ .7 0

-40 -35 -30 -25 -20 -15 -10 -5 0 5 10 '15 20 25 30 35 40 Percent Axial Imbalance

ONEI-0400-70T=,ev 17 Oconee 3 Cycle 21 Page 14 of 33 Imbalance Setpoints for 3 Pump Operation, BOC to EOC 110

.~~~ztzt-.r~~~ ~~~~~j~~7 1~~~1~~ ~ ~ Tj j...

100 1

L4.£.  : J 4-.. .L 90 RPS Trip Setpoint -

80 70 -.- ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~~~~~RPS Trip Setpoint C, .. _ ......

__.. rr ~__

0

' 60 U-0 C) 50 U

C, -t4 0-40 30 20

-.4.1 4~4 ~_

~~~~~~~~~~~~~1 10 - - 771- J--4 - n - - - -7 --

0

-40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 Percent Axial Imbalance

ONEI-0400-70 Rev 17 Page 15 of 33 Oconee 3 Cycle 21 Operational Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No Inop Rod 1 Inop Rod Setpoint 4 Pumps 102.0 263.5 289.7 300 100.0 261.5 287.5 300 90.0 251.5 276.7 300 80.0 241.5 266.0 300 50.0 201.5 233.7 300 48.0 195.2 231.5 300 15.0 91.5 165.5 300 13.0 76.5 161.5 300

) 5.0 16.5 93.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300 3 Pumps 77.0 237.5 285.2 300 75.0 234.8 281.5 300 50.0 201.5 235.2 300 48.0 195.2 231.5 300 15.0 91.5 165.5 300 13.0 76.5 161.5 300 5.0 16.5 93.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

ONEI-0400-70 Rev 17 Page 16 of 33 Oconee 3 Cycle 21 Shutdown Margin Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No Inop Rod 1 nop Rod Setpoint 4 Pumps 102.0 224.6 289.7 300 100.0 221.5 287.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

)

3 Pumps 77.0 227.4 285.2 300 75.0 221.5 281.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

Oconee 3 Cycle 21 ONEI-0400-70 Rev 17 Rod Index Setpoints Page 17 of 33 4 Pump Operation, No Inoperable Rods, BOO to EOC Shutdown Margin etpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 102 100 99.8 24.8 100 100 63.5 101 100 9910 24.0 100 iOO 62.5 100 1-00 98 .2 23.2- 100 100 6.1.5 99 100 97.5 22.5 100 100 60.5 98 0096.7 21.1010 59.5 97 100 95.9 20.9 100 100 58.5 96 100 - 95.2 20.2 100 100 57.5 95 iQO 94.4 19.4 100 100 56.5 94 100 93.6 186.6 100 100o 55.5

-93 100 92.9 17f.9 100 100 54.5 962 100 92.1 17. 100 1060 53-.5 91 100 91.3 16.3 100 100 52.5 90 100 - 90.6 15.6 100 - 100 51.5 9 100 896.8 14.8& 100b 10050.

88100" _ 89.0 14.0 100 10 49.5O 87100 88.2 13~~~~~_ ~~~.2 100 100 48.5 86 100...8~~7.5

_ _ 12.5 -100 -100 47.5 85 '100 86.7 11.7 100 100 46.5 84 100 85.90 10.9 100 . 100 45.5 83100 85.2 1~~~ ~ ~~~0.2 100 100 44.5 82 100 ~~~~ ~~84.4 9.4 100 100 43.5 81 100 ~~~~ ~~83.6 8.6 100 100 42.5 80 100 82.9 7.9 100 100 41.5 79 __ 100 82.1 7.1 100 100 40.2 78 100- 81.3 6.3 100 100 3.

77 100~~( 80.6 5.6 100 103.

) 76 0 7.84. 00 100 36.2 75 10 904.0 100 - . 100 34.8 74 100 78.2 3.2 100 100 33.5 73 100 77.5 2.5 100 100 32.2 72 100 7671.7 100 100 30.8 71 _ 1007590910002.

70 100 75.2 0.2 100 100 28.2 69.8 100 75.0 0- 100 100 27.9-69 100 73.8 0 100 100 - 26.8 68 1072.3 0 100 100 25.5 67.6 __ 100 7Y1.7 010100 25.0 67 100 70.7 0 100 99.6 24.6 66 - ~100 69.2 0 100 98.9 23.9 65 100 67.7o -0 100 98.2 -,23.2 64 100 66.1 ~~ ~~~~~~~0

00. 97.62-2.6 62 100 63.0 0 100. -96.2 21.2 6110 6.50 . 00956o0.

60 ~~~~~~~~000100 . 94.9 19.9 59 ~~10 58.4 0 100 94.2 _ 19.2 58 100 ~~~~ ~ ~~5.9

~0109368.

. 7100 _ 55.3 0 _ 100 92.9 17.9 56 100~lo 53. 8 0 0 2217.2 55100. .52.3 ~~ ~~~~0 100 91.6 16.6 00 50.7 0 ~ ~~~~

10 ~~~~

90' 6.9 1.

5~--- 160. 49.2 06 100 90.2 1-5.2 52 100 *47.7 0 100 89.6 14.6 51 100 46.1 0o 1008.919 50 100 44.6 0 100 88.2 13.2

%Frp CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP6 CRGP7

__________ Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Cotneonexpa.

Continued on next page.

Oconee 3 Cycle 21 ONEI-0400-70 Rev 17 Rod Index Setpoints Page 18 of 33 4 Pum-p bperation, No Inoperable Rods, BOO to EOC Shutdown Margin Stpoint Operational Alarm Setpoint

%FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 49 100 43.0 0 100 86.7 11.7 48 100 41.5, 0 100' 85.1l 10.1, 47 100 *39.6 0 100 83.5 8.5 46 100 -- 3.6 0O 10082.0` 7 .0 45 10 35.9 0 100 80.4 5.4 44 100 34.1 0 100 78.8 3.8 43 100 32.2 0 100 77.2' 2.2 42 100 30.4 0 100 75.7 0.7 41.6 100 29.6 0 100 75.0 0 4.1 10 285o 010 7.20 40 100 26.6 0 100 70.1 0 391l005. 0 100 -67.3 0-39 99.9 2.9 106 66. 0 38 99.0 2.0 100' 63.8 -

37 980O3.' 10 .6. 0 36 971 .1 010 57.

34 _ 95.2 20.2 _ 0 100 _ 51.2 0~

-. 33 -94.319.3 ___ 0 1006 48.1 0 32 93.4 ~~~~~18.4 -- 10 _--44.9 -0 31 92.517.5

- - _ __ 0 100 ~~~~~~~~~~~~41.8 0

30 __ 91.5 16.5 _010 3.

29 90.6 15.6 0 - 100 35.5 0 8 ~~~89.7 14.7 _ 0_ _ 10 2.4 0-88.8 138 __ 10 2.2 I 26 87.8

- 12.8 _ 0 __ ~~~~ ~~~~~~100 26.1 0 25.7 8. 25 _0 _ 0 __2.

25 86.9 - 11.9 - -- 0 ~ 99.0 -.- 24.0 0 24

__ ~~86.0 11.0 O 74 2. 0 23 85.0 ~~~~10.0 _0 95.8 20.80 22 ~84.1 9.0 942 120 83.2 -- 8.2 _0927170 20 __ 82.2 -_7.2 _ 0- 91.1 -16.1 0 19 81.3 6.3 0 _89.5 14.5 0 18 __ 04 5.4 _0 880 13.00 17 _ 79.5 4.5 __0 864 140 16 78.5 -3.5 - 48 980 15 77.6 2.6 _ 0 83.2 8.2 0 14 -- 76.7 1.7 0 - 7. .

13 ~~75.8 0.8 0 758 0.8 12.8 75. ____

12 69.00 0 69.0 0 1.1 61.5 "O_ 0 O-1.

10 ~ 54.0 0 54.0 0 9 46.5 0 0 46.5 _

8 -39.0----- 0O 39.0 6 _24.0 O_ 0 24.0 _0 0 5 165 _00 6500 4 9.0 b09. 0 3 1.5 O 1.5 0 2.8 0' 0 0- 0 0 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

%P CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7

_______ I Shutdown Margin Setpoint _ 1_ Operational Alarm Setpoint RI = 300 is withdrawal limit at all pDower levels.

Oconee 3 Cycle 21 ONEI-0400-70 Rev 17 Rod Index Setpoints Page 19 of 33 3 Pump Operation, No Inoperable Rods, BOC t EOC Shutdown Margin Stpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 77 100 100 27.4 100 100 37.5 76.2- 10 100 25.00 0 100 36.4 76 100 99.7 24.7 100 100 36.1 75 100 98.2 23.2 100 100 34.8 74 100 96.8 21.8 100 100 33.5 73 100 95.3 20.3 100 100 32.1

72 100 ~3.8 8. 100" 100 30.8 71 100 92.3 17.3 100 100 29.5 70 100 90.8 15.8 100 100 28.1 69 100 89.4 14.4 100 100 26.8 68 10 87.9 12.b10 iQo' 25.5-67.6 100 - 87.4 12.4 100 100 25.0 67 100 86.4 11.4 100 99.6 24.6 66 100 84.9 9.9 _ 100 _98.9 23.9 65 100 83.4 -8.4 100o 98.2 23.2 100 82~~.0 _7.0 _ 100 _ 97.6 22.6 63~ 1-0_8. 55 10969 _ 21.

62 00, 1~~I 7904.0 100 9 6. 2 21.2 61 100 77.5 2.5 -100. 95.6 20.6 60 100 7. . 0 49 1.

59.3 10 70 010944 19.4 59 100 74.1 0 100 -94.2 19.2 58 -100 71.1 0 100 93.6 18.6 57 100 68.2 0 0 29 17.9 56 100 65.2 0 100 92.2 ~~~~~~~~17.2 55100 62.2 ~~ ~~~~~0 0 916 16.6 54 10~~0 59. 0 90.9 15.9 53 ~~100 5.010 902 15.2 52 100. 53.4 0 100 89.6 14.6 51 100 -50.4 __ 0i10 88.9 13.9 50 100 47.40108.2 32 49 ~~100 44.5 __0 100 86.7 11.7 48 100 ~~~~~41.5 0 100 85.1 10.1 47 100 39.6 0 -100 83.5 8.5 46 100- - -37.8 0 100 82.0 7.0

'45- - 1i00 0 100 80.4 5.4 44 100 341010 7. -38 43 ~~100 32.2 -- 0 -- 100 - 77.2 2.2-42 100 30.4 0 100 75.7 0.7 41.6 100 2960__10 _7.0 41100 28.5 ~~~~~~ 100 ~~~0

.7.3.2- 0 40 ~100 2.6 0 100 70.1 0 39.1 100 25.0 _ 0 ~~~~~~~~~~-673 39 99.9 24.9 0 _ 100 66.9 __0 38 99 . 24.0 _ ~0 10 6.

37 ~~~98 23.0 0 -. 100 60.6 0

..... 96.-212 0-4.

34 -95.2 __20.2 __0 10.- 51.2 . -

33 ~94.3 19.3 010 4. ..

32... 93.14 _ 186.4 0 - 10'I0 46 -,-

31 92.5--17.5 0 -10 - 41.8 0 30 '91.5 '16.5 0l100 38.6 0 29 90.6 15.6 0 100 35.5 0 28 89.7 14.7 0 100 32.4 0

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP6 CRGP7

__________ Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at ali power levels. Cotneonex Continued on next t)aQe. ae

Oconee 3 Cycle 21 ONEI-0400-70 Rev 17 Rod Index Setpoints Page 20 of 33 3 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint 1[ Operational Alarm Setpoint

% FP CRGP5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP7 27 88.8 13.8 0 100 29.2 0 87.8 12.8 0 100 26.1 0 25.7 87.5 12.5 0 100 25.0 0 25 86.9 11.9 0 99.0 24.0 0 24 86.0 11.0 0 97.4 22.4 0 23 85.0 10.0 0 95.8 20.8 0 22 84.1 9.1, 0 94.2 19.2 0 21 83.2 8.2 0 92.7 17.7 0

.9 ,.

20 82.2 7.2 0 91.1 16.1 0 19 81.3 .6.3 0 89.5 14.5 0 18 80.4 5.4 0 88.0 13.0 17 79.5 4.5 86.4 11.4 0 16 78.5 3.5 0 84.8 9.8 0 0

15 ,,.77.6

.. _ 2.6 83.2 8.2 14 76.7 1.7 0 79.5 4.5 75.8 0.8 75.8 0

_75.0 0 75.0 0 0 69.0 cV 69.0 0 61.5 0 _61.5 0

._ 0 0,___ 0 10 54.0 0 _54.0_ 0 0 0O_ 0 46.5_ 0

_ _, --.- .I 46.5 -

39.0 0 0 39.0 0 0 9

31.5 31.5

_ 0 _ 24.0 0 24.0 0 . _ _ 0 0

5 16.5 0 16.5 0 0 4 9.0 0 0 9.0 3 1.5 _ 0 1.5 0 0

_-0 . 6~- 0 2.8 -l 0 __ _0.

0 _ ._ . _ 0 _

0 2 __._ O 00 0_ O _..

0_ 0 1

0 ~~~~~~~~~~~~~.. -............

I . ,, _ ... . . .-- ---- - - - - --- ---

0..............

I-- - - .......

% FP CRGP 5 CRGP 6 CRGP7 CRGP 5 CRGP 6 CRGP 7

_________ jj ` Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 21 ONEI-0400-70 Rev 17 Rod ndex Setpoints Page 21 of 33 4 PUmp Operation, I Inoperable Rod, BOC to E00 ShtonMargin Stpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 102 100 100 89.7 100 100 89.7 1oi io 10 8810 100 88.6 100 100 100 87.5 100 100 87.5 99 100 100 86.4 100 100 86.4 98 100 100 85.3. .100 100 85.3 97 100 100 84.3 100 100 84.3~

96 100 100 83.2 100 100 83.2 95 100 100 82.1* 100 -. 100 82.1 94 160 100 81.0 100 100 81.0 93 10 100o 80.0 _ 100' 100O 80.0 92 100 -100 -78.9 *100 100 78.9 91 100 77d

-~.8 '100 100 77".8 90 100 100 76.7O10 100 76.7 89 100 100 75.7 100 100 75.7 88 10 0 - '- _10 100 4 0 74.6

~~~~~~10--

____ 100 74.6

  • 86 100- -100 7-2.4 100- 1 6O- '72.4 85 ~ 100 100 71.3 _100 100 71.4 100 10~~i0 -69.2 10 100 69.

__ ~~~100 100 68.1 100 100 68.1 81 100 '100 67.0 100 100 67.1 10010 64.9 1064.9 78 100~lo 100 863.8 100 -.- 100 63.8 77 100 100 62.7 100 ~~~100 6.

76 100 100 61~------

F.7 100f-617r 75 100 100 60.6 100 10 60.6 74 ~~100 100 59.5 10010 9.

  • 73 100~~io 100 58.4 100 100 58.5 72 100 100 57.3 100 100 ~~~~~~~57.4 71 __ 100 100 56.3 ~100 105.

70 100 100 55.2 __100 100 55.2 100 100 54.1 100 10 5.

68 100 100 53.0 100 100 53.1 67 100 100 52.0 _ ~~~~ 1052.0 ~~~~1 66 ~~1 00 100 50.9 100 100 50.9 65 100 -- 100 49.8 100 100 49.9 64 100~~~lo 100 48.10 lb . 48.

6 ~ 1010 477 10 10 7.7 62 - 00 . 100 -46.6- 100 100O 46.6 61 10 0 4. 0 - 10 ob 4.

60 . 100 100 44.4 __100 100 44.5 Th 100 43.3 _0 100 43.4 58 . 1010 23100d 10d '42.3 56 100b 40.1- 100O 40O.2-55 100 100 39.0 _100 _ 100 39.1 54 . 100 10 30 100 100 38.0 53 100 -100 - 36.9 100 bo 36.9 52 . io 0 35.8 100 - 100 .3.

51 . 34J 100- 100 34.8-50 100 100 33.7 100 100 33.7 49 ibo 100b 32.6' 100 100 32.6 48 100 100 31.5 100 100 31.5

%/oFP CRGP 5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7

__________ Shutdown Margin Setpoint I Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Cotneonet Continued on neXt Daae.a.

Oconee 3 Cycle 21 ONEI-0400-70 Rev 17 Rod Index Setpoints Page 22 of 33 4 Pump Operation, 1 Inoperable Rod, BOO to EOC ShtonMargin Setpoint Operational Alarm Setpoint Ij % FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 47 100 100 29.5 100 100 29.5 46 100 100 *27.5 160 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 -100 _ 99.2 24.2 _100 99.2 24.2 43 100 ~ 98.2 23.2 110 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 _ 100 96.2 21.2 40 1006 95.2 20.2 100 95.2 20.2 39 100 94.2 .19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 10 922 1 2 12

0. 172 36 100 91.2 16.2 100 91.2 16.2 35 10 9.15200 90.2 15.2 34 100 896.2 142100 89.2 14.2 33 10 882 13.2 __100 88.2 13.2 32 . 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 _86.2 _ 11.2 30 100~ 85.2 .10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.28. _103282 27 ~~100 82.2 7.2 _ _100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25I~ 100... 80.2 5.2 _108. .

-. 100o 79.2 4.2 107. 4.2 23- 100-- 78.2 32100 _78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100Q 76.2 1.2 __100 76.2 1.2 20 ~~100 75.2 0.2 100 75.2 0.2 19.8. .100 75.0 0 100-675 . 0~

19- . 100 73.5 - 0 _100 - .73.5 - . -

18 - 100io 71.5 0 - 107.5 -0.

17 100 69.5 0 - 100 69.5 .... 0..-

16 100 67.5 _0 ~ 100 _67.5 0 15 10 65.5 0 10 _6.

14 100 63.5 0 100 63.5 -.-- 0 13 100 61.5 0 - ~~100 615o 12 100 53.0 0 _ 100 -53.0 0 11 100 44.5-- 0 104.

10 .. 3 6.0 _ 0 _ 100 360 _ 0 9 . 1~00 . 27.5 _ 0 10- -27.5~ 0 8.7 100 5.010_ 25.0 7 928 17.8 0 _ _92.8 17.8 6 885 1. _0 88.5 13.5 0 5 84.2 _ 9.2 0 _ _2 84.2 9.2 0 4 80.0 5.- __-0 8005.

.3. 75.8 .0.8 0 - 75.8 0.8 0 2 74.8 -0 0 74.8 0 0 2 -68.0 0 0 6 8.0 0 0 1 59.5 0 0 59.5 0 0 0 51 0 0 51 0 0

% FP CRGP 5 RG6 CRGP 7 R 5 CRGP 6 CRGP 7

__________ Shutdown Margin Setpoint Operational Alarm Setpon RI = 300 iswithdrawal limit at all power levels.

Oconee 3 Cycle 21 ONEI-0400-70 Rev 17 Rod Index Setpoints Page 23 of 33 3 Pump Operation 1 Incoperable Rod, BOO to EOC

% FP II 11CRGP5 Shutdown Margin Setpoint CRGP6 CRGP7 11CRGP5 ICRGP6 operational Alarm Setpoint CRGP7 77 100 100 85.2 100 100 85.2 76 100 100 83.4 100 100 83.4 75 100 100 81.5 100 100 81.5 74 100 100 796.6 100 100 79.6 73 100 100 77.8

  • 100 100 77.8 100 100 759 100 75.9 71 100 100 74.1 100 74.1 70 100 100 72 .2 100 100 72.2 100 100 70.4 100 100 70.4 69 1*00 68.5 100 100 67 100 100 6-6.7 100 66.7 100 100 100 65 i 6o- 63.0 63.0 100-100 100 64 61.1 59.3 100 100 5.4 57 .4 55.6 i66~

.1-66~

63 - - 6 &0 62 100 100 50.0 100 100 55.6 48.2 58 46.3 100 100 44.5 100 5.7 57 42.6

__ 1_00- 51.9 56 100 100 40.8 55 38.9 100 100 549 100 37.1 100 53 4.2

.. . O. .. . 100 100 100 100 33.4 1002 49 - - 10 106 -- ' 31.5 100 29.5 100 46 100 27.5 ' _

45 25.5 44.8 1~00 25.0 44 100 99.2 24.2 43 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 It------------4---

97.2 22.2-41 96 21.2 100 96.2 21.2 40 95.2 20.2 95.2 94.2 19.2 100 93.2 94.2 18.2 17.2 100 17.2 92.

100 16.2 1J00 90.2 100 15.2 9.2 14.2 13.2 8872 92.2 16.2 ibo -

91.2 100 86.2 32' 100 15.2 lob 90.2 10.2

.<66 84.2 14.2 89.2 9.2 8.2 100 100 .7.2 1-00* 100 6 .2

} 26 100 81.2 80b.2 100 5.2 24 79.2 4.2

% FP ICRGP 5 CRGP 6 CR-GP 7 CRGP 5 CRGP 6 CRGP 7

________ k Shutdown Margin Setpoint ]j Operational Alarm Setpoint _

RI = 300 is withdrawal limit at all power levels. Cotneonetpae Continued on next page.

Oconee 3 Cycle 21 ONEI-0400-70 Rev 17 Rod Index Setpoints Page 24 of 33 3 Pump Operation, 1 Inoperable Rod, BOO to EOC Shutdow Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 23 100 78 .2 3.2 100 78.2 3.2 22 - 100 77.2 2.2 100 - 77.2 2.2 21 100 76.2 _ 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 10 750 0 100 75.0 0 100 7~~ 3.5 10 oo 0 73 -

1-8 100 71.5 0 100 71.5 0 17 100 69.5 _ 0 .10 69.5 0 16 100 67. 0 100 0 15 11i66, 65. 0 __0 6575 0 14 10 6.0. 103.5 0 13 100 615010 61.50 12 100 53.0 0 100 53.0 0 11 44o.5 0o 0 44.56 10 10 36.0 0 - 100 36.0 - 0 100 -27. 100 27.5 -

8.7 - 10- 2~5.0 06 - 100 25.0 . -

8 ~ 97.0 22.0 0 97.0 22.0 -.

7 92.8 17.8 0 92.8 17.80 88.5 13.5 0 _88.5 13.5 0_

5 84.2 9.2 0 84.2 9.2 0 4 ~~~80.0 5.0 _ 00 5.00 3 75.8 08__0 - . 75.8 0.8 _0 2.8 ~74.8 - 0 -0 74.8 00 2_-..- 68.0 -.. 0 ~05. 0 _ _ 68.0 0 0

) 1 0 51 59.5~~~~~~~~~~~~~~~~9.

0 _ __ ___ ~~ 51~~~0 _O 0O0

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP7

__________ Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 iswithdrawal limit at all power levels.

ONEI-0400-70 _ 17 Page 25 of 33 105 -

I Oconee 3 Cycle 21 I n 105 100 -

95 -

._.4_ ,A

.t U

Control Rod Position Setpoints No Inoperable Rods, 4 Pump Flow I 11 1

.i _

ti I11 I I4, 44_4FIlRestricted

-~ trg Operation

_, P i

ill 5MX 4

4 ".In e,

if4. -

Wi~. '

r il 7+TT7 i

1-rT.~1I~.: -

~'

100 95 90 - _ '

"1 I,l.'

. 90 14 85 - , I e ..

- 85 IE I. -

80 - tffI 80 i

I I.1 I.

75 -

V _,

_ 17 414 75

11 iii-H Unacceptable .i;' IilLh, I r-70 - *1 70 Operation tf I-  !. i 65 - I 1P 65 EL L 60- irT+/-K4 1 t ' ¢ 60

-0 55 141 0a: _ rjv1 Acceptable td T H--i r-11 T T1-

' zL - 50

7, 41w 4J1I Ope,_trationr',i4;r X~ 45 45 if__

i-I I

,.4!¢. T t4' ;r I I 40 14

-I 40 I t- ' T -

-- i 35 :4. .

i ii 35 I411 I- Ii 30 -41r 30 I _r

-r ' I fI T .,

i-ri 250 l TI1 I 1'r; *r - 25

': -: I I,1 i !-

ii r- r 20 .

20 Hi Ii I lAll 114TA 111 jnl 111111111111 1 1 TmTT#l IITUXUTUS ,, rt 15

  • 15

-EilMl-ml M llt 1lT I 10 5 . !-

. ~ t i; THl IIl l,1ITl l l l lI 81[1::1[:1H+H jm14011F44 S1 I,STrrll"TTTl#F(l

_~ru 6 _11 ~~~~~~N M4

+H1i 44 HA4 14L L

1:

= -;lt 4-J~~~~~~~~~.

Tt, 4

I8r-rr!7t @,-,..

,r-H

,l t - ITt Hr,,i-I 1FT!hj

. I'

_ 7i-,L,i_ --

4r,F-t t'l[;

I T'i" rrw 7. ri

'I* ,-

1

,.4.,...

  • Xz44.5t-10

. I

..1.; ~~~~~~~_'

-~~~~~~. 1##,# ..., I ;1. X1 1I~~~~~~~~~~- 5 15 25 35 45 55 65 75 85 95 _11II' 1-t I - l.t4 .ns

' I- '

iI 'I I,!

t'.

41 qT I

§1+ ;  ;,_..

4~~~~~~~~~~~~  ? '

? i*n<s -!'-

f'7T 'Y4...................................'titj I I l 0 0 10 20 30 40 50 60 70 80 90 100 o i0 20 30 40 50 60 70 80 90 100 I Group 5 l Group 7 Control Rod Position, % WD

ONEI-0400-7(. ._ 1 17 I Page 26 of 33 Oconee 3 Cycle 21 I 105 I

r itr.. +-t-tji+H '-41AI

. I tA II iI M _ r 7 ~~105 II]iiYSJ~Thfi I

r i - Control Rod Position Setpoints :I I i T:T

, 100 I

i t 100 i". 1 No Inoperable Rods, 3 Pump Flow I1 in M  !-,

t rr Ti 'T' - 95 95 H r.

Lj tr*tH tHt 90 Ii Ti te i1E 85 . r- * ;rr F4:-; 85

.+,I 80 _ LL 4ri~ T 80 ITT 75 70 *:70 65 Unacceptable 9 65 a Operation Li-60 'TTT 60

i I- I IT 41 I I 55 J4- 55 11 0

ir T, 50 50 a) 0 M11 Ii Ia1 Restricted ih j .-.r,4 It _' i I 4, M 45 r rITHH i  ; . T+lt I *it tiI. I -irt7 ? I a) Operation 45 lio i+-~1i

.ittlTT-+tHT fitHI-H 11 t . t-T[* -1l- = W- -EH+t tTV_ 7"--

ie t H + [ili IX 40 40

_4 rI T +r 35 A 35 rrTT Pt t L

Acceptable =;.

30 25 Operation I4, If r- iI r I!

30 25 tr.1r 20 l* tf' it+.

ti~ - " tl-14 rT-ri 20 1z1,111 _ rT r HIMX4T t _ _

15 15

_, =

41 ;TT 10 L4 s4ti tti t*FJ rW'; I r-w.'. 10 t,, L i i I II

[p itI t.I-+,

5 11" p H41ll +l i G 5roup 6 5 7 9 IpI .6 5

5 15 k4tqZq74 45 55 65 75 85 95 {: 4t _, ti, I ,:

i *-7r 0 II 25 35 IL .7.

T

'III 1 .i1_ ti ir- 1-.

T-I  !.

I~~~~~~~ I 0

ls:

I I I ]

0 10 20 30 40 50 60 70 80 90 100 I 0 10 20 30 40 50 60 70 80 90 100l I Group 5 l Group7 Control Rod Position, % WD

ONEI-0400-7 17 105 _ Oconee 3 Cycle 21 Page 27 of 33 100 00 T 2 otrol Rod Position SetpointsiHiIH 95 t g i tg~~~~~~~~1 Inoperable Rod, 4Pum pFlow1X Wlfififi 90 .~

85 . 11 1 WltiV"n 4

  • '1i1 "E r g j i 85

- X ~~H H fi lit MI i19fi W lIll]tiMWI fi1llZ 654 75 - L~~~~~~~~~~~~~~~~~~~~~~__L1 ;Wt

-_L_u11I _LL I Jil Ill _H EX W65 - W X1 ffi ffi 1 --4+ 4

~~~~~~~~~~~4+W -MLH Xg gE t<,

75 35 +.. + X S W~~~~~~~~~~~1 --LL_ 1ilXil.

70 -

065 55 - JI Tr SlWWEE U@ll 30 15 Grou 6 J1WEH! E FH1 S  !"t E I Sv !r4W1 tzrrt.~

5 '5 15 25 35 45 55 75 8 lil l5 tflTh!

Control Rod Position, % WD

ONEI-0400-7.v 17 Oconee 3 Cycle 21 l Page 28 of 33 105 ~~~Control Rod Position Setpoints 100 1! ti* -10 ~~~~~~~~~~

1W W WI Inop erab le R d, 3 unmp Flow.

1; 90 ffi- ffi tit;1Ttt 80~ ~ ~ ~

HT H ffiX X

~

tffi ffi

~

X X1H

~~~~~~~~~~~~~

1 ffi X1 1W W

+l H4,i tiW1 Bn

}r;g w wT mi m >;4-71 H~U+l

.10-j~~~~~~~~~~~~~

0

=7~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~7 0 75 95_8 55~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~t8 85~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~5 0 55 50 30 7

40) - -.jW1 WWWWWWll$riiEl tr! cc to -X 45 555 20 0 g ~ iF 1~ .......25W 35 5 55 E 6 75 85 95 fH~ liftit t4t,

.~ r'W Hr'1

,.-t-

~+f+/- t ' tt-4 20 10 X

1o5 tHE1 _ H1 1W gE g X P E jGjilull tiE s I~~~~~~~~~~~- _ iiLt1-l t11 f- r~-

H--,

60 Control Rod Position, % WD

ONEI-0400-70 Rev 17 Page 29 of 33 Oconee 3 Cycle 21 2.0 Core Operating Limits -- Not Error Adjusted The data provided on the following pages satisfies a licensing commitment to identify specific parameteis before instrumentation uncertainties are incorporated.

References provided in section 1 of this COLR identify the sources for the data which follows.

Quadrant Power Tilt Limits Referred to by ITS 3.2.3.

Steady State Transient Maximum

) Core Power Level, %FP 30- 100 0 -30 30- 100 0 -30 0 - 100 Quadrant Power Tilt, % 5.44 10.00 . 9.44 12.00 20.00 Variable Low RCS Pressure Protective Limits Referred to by ITS 2.1.1.

Core Outlet Pressure Reactor Coolant Outlet Temperature, F psia 3 RCS Pumps 4 RCS Pumps 1800 581.0 578.3 1900 590.0 587.3 2000 598.9 596.3 2100 607.9 605.2 2200 616.9 614.2 2300 625.9 623.2

ONEI-0400-70 Rev 17 Page 30 of 33 Oconee 3 Cycle 21 Axial Power Imbalance Protective Limits Referred to by ITS 2.1.1

'U.,,

.1.

I Ncflor Pse

%FP RPS Operational 4 Pumps 0 -48.0 -36.6 80 -36.6 90 -33.5 100 -48.0 -24.2 112 -31.1 112 31.1 100 48.0 30.0 90 36.4 80 39.0 0 48.0 39.0 3 Pumps 0 -48.0 -36.6 74.6 -48.0 77.0 -36.6 86.6 -31.1 86.6 31.1 77.0 39.0 74.6 48.0 0 48.0 39.0

ONEI-0400-70 Rev 17 Page 31 of 33 Oconee 3 Cycle 21 Rod Index Limits Referred to by ITS 3.2.1 I < 4> ~~~~ Use n Operational RI Shutdown Margin RI Insertion Limit RI Withdrawal

%FP Insertion Limit No nop Rod 1 nop Rod Limit 4 Pumps 102 262 220 286 300 100 260 300 90 250 300 80 240 300 50 200 140 230 300 15 90 75 160 300

) 5 0 0 75 300 3 Pumps 77 236 220 280 300 50 200 140 230 300 15 90 75 160 300 5 0 0 75 300

)

ONEI-0400-70 Rev 17 Page 32 of 33 Oconee 3 Cycle 21 LOCA Limits II 0 6 a t Use --"' >

II Core Elevation Feet LOCA LHR kw/ft Limit Versus Burnup Mk-B1OL Fuel 0 GWd/mtU 30 GWd/mtU 62 GWd/mtU 0.000 15.6 15.6 11.6 2.506 16.5 16.5 11.6 4.264 16.8 16.8 11.6 6.021 17.0 17.0 11.6 7.779 17.0 17.0 11.6 9.536 16.7 16.7 11.6 12.00 15.8 15.8 11.6 Mk-B11 and 0 GWd/mtU 40 GWd/mtU 62 GWd/mtU Mk-B11A Fuel 0.000 15.5 15.5 12.6 2.506 16.3 16.3 12.6 4.264 16.5 16.5 12.6 6.021 16.8 16.8 12.6 7.779 16.5 16.5 12.6 9.536 16.2 16.2 12.6 12.00 15.4 15.4 12.6

ONEI-0400-70 Rev 17 Page 33 of 33 Oconee 3 Cycle 21 4 RCP Operation - Loop Average Temp., F 3 RCP Operation - Loop Average Temp., F ATcold, F l Tavg (Analytical) Tavg (Analytical)

U.o <b81.1) <b81.O 0.1 <581.0 <581.0 0.2 <581.1 <581.0 0.3 <581.1 <581.1 0.4 <581.2 <581.1 0.5 <581.2 <581.1 0.6 <581.2 <581.1 0.7 <581.3 <581.2 0.8 <581.3 <581.2 0.9 <581.3 <581.2 1.0 <581.4 <581.2 1.1 <581.4 <581.2 1.2 <581.5 <581.3 1.3 <581.5 <581.3 1.4 <581.5 <581.3 1.5 <581.6 <581.3 1.6 <581.6 <581.4 1.7 <581.6 <581.4 1.8 <581.7 <581.4 1.9 <581.7 <581.4 2.0 <581.8 <581.4 2.1 <581.8 <581.5 2.2 <581.8 <581.5 2.3 <581.9 <581.5 2.4 <581.9 <581.5 2.5 <582.0 <581.6 2.6 <582.0 <581.6 2.7 <582.0 <581.6 2.8 <582.1 <581.6 2.9 <582.1 <581.6 3.0 <582.1 <581.7 3.1 <582.2 <581.7 3.2 <582.2 <581.7 3.3 <582.3 <581.7 3.4 <582.3 <581.7 3.5 <582.3 <581.8 3.6 <582.4 <581.8 3.7 <582.4 <581.8 3.8 <582.4 <581.8 3.9 <582.5 <581.9 4.0 <582.5 <581.9 4.1 <582.6 <581.9 4.2 <582.6 <581.9 4.3 <582.6 <581.9 4.4 <582.7 <582.0 4.5 <582.7 <582.0 4.6 <582.7 <582.0 4.7 <582.8 <582.0 4.8 <582.8 <582.1 4.9 <582.9 <582.1 5.0 <582.9 <582.1