Technical Specifications, Increase Loading Requirements for Standby Shutdown Facility Diesel Generator
ML031400507
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/19/2003
From:
NRC/NRR/DLPM
To:
References
TAC MB7729, TAC MB7730, TAC MB7731
Download: ML031400507 (2)


Text

ATTACHMENT TO LICENSE AMENDMENT NO. 331 RENEWED FACILITY OPERATING LICENSE NO. DPR-38 DOCKET NO. 50-269 AND TO LICENSE AMENDMENT NO. 331 RENEWED FACILITY OPERATING LICENSE NO. DPR-47 DOCKET NO. 50-270 AND TO LICENSE AMENDMENT NO. 332 RENEWED FACILITY OPERATING LICENSE NO. DPR-55 DOCKET NO. 50-287 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert 3.10.1-4 3.10.1-4

I-SSF 3.10.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.10.1.7 Verify the fuel oil transfer system operates to 92 days automatically transfer fuel oil from the storage tank to the day tank.

SR 3.10.1.8 Verify the fuel oil properties of the fuel oil 92 days stored in the day tank and underground storage tank are tested in accordance with, and maintained within the limits of the Diesel Fuel Oil Testing Program.

SR 3.10.1.9 ---------- ------NOTES------- --

1. DG loadings may include gradual loading as recommended by the manufacturer.
2. Momentary transients outside the load range do not invalidate this test.
3. All DG starts may be preceded by an engine prelube period followed by a warmup period prior to loading.

Verify the SSF DG is synchronized and 92 days loaded and operated for > 60 minutes at a load 2 3280 kW. I SR 3.10.1.10 Verify for required SSF battery that the cells, 12 months cell plates and racks show no visual indication of physical damage or abnormal deterioration that could degrade battery performance.

(continued)

UNITS 1, 2, & 3 3.1 0.1 -4 Amendment Nos. 331, 331, & 332 IOCONEE