May 19, 2003 Mr. Fred R. Dacimo Site Vice President - Indian Point Nuclear Generating Station Entergy Nuclear Operations, Inc.
295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION AT INDIAN POINT POWER STATION, UNIT 3; INSPECTION OF REQUALIFICATION TRAINING AND NRC ANNUAL OPERATING TESTS, UNIT 2
Dear Mr. Dacimo:
In a telephone conversation on April 21, 2003, Mr. T. Fish, Examiner/Inspector, and Mr. F.
Wilson, Superintendent, Operations Training, made arrangements for the NRC to inspect the licensed operator requalification program at Unit 3. The inspection is planned for the week of July 7, 2003, which coincides with your regularly scheduled requalification examination cycle.
The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
The inspector also made arrangements to conduct a partial requalification inspection at Unit 2.
The purpose is to observe portions of classroom training and administration of facility-administered NRC annual operating tests scheduled for Unit 2 operators the weeks of July 21 and August 11, 2003.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRCs inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the examination schedule, sample plan, and operating tests scheduled for the week of the inspection to the NRC by June 23, 2003. Mr. Wilson has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on May 31, 2003.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
Mr. Fred R. Dacimo 2
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Fish at (610) 337-5369.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No.
50-286 License No.
DPR-64 cc w/encl:
G. J. Taylor, Chief Executive Officer, Entergy Nuclear M. R. Kansler, President - Entergy Nuclear Northeast J. Herron, Senior Vice President, Indian Point Energy Center C. Schwarz, General Manager - Plant Operations D. Pace, Vice President, Engineering J. Knubel, Vice President, Operations Support J. McCann, Manager, Nuclear Safety and Licensing J. Kelly, Director, Nuclear Safety Assurance C. Faison, Manager, Licensing H. Salmon, Jr., Director of Oversight J. Fulton, Assistant General Counsel, Entergy Nuclear Operations, Inc.
W. Flynn, President, New York State Energy, Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. Eddy, Electric Division, New York State Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law T. Walsh, Secretary, NFSC, Entergy Nuclear Operations, Inc.
D. ONeill, Mayor, Village of Buchanan J. G. Testa, Mayor, City of Peekskill R. Albanese, Executive Chair, Four County Nuclear Safety Committee S. Lousteau, Treasury Department, Entergy Services, Inc.
Chairman, Standing Committee on Energy, NYS Assembly Chairman, Standing Committee on Environmental Conservation, NYS Assembly Chairman, Committee on Corporations, Authorities, and Commissions M. Slobodien, Director, Emergency Planning B. Brandenburg, Assistant General Counsel
Mr. Fred R. Dacimo 3
cc w/encl: (contd)
P. Rubin, Operations Manager Assemblywoman Sandra Galef, NYS Assembly C. Terry, Niagara Mohawk Power Corporation County Clerk, Westchester County Legislature A. Spano, Westchester County Executive R. Bondi, Putnam County Executive C. Vanderhoef, Rockland County Executive E. A. Diana, Orange County Executive T. Judson, Central NY Citizens Awareness Network M. Elie, Citizens Awareness Network D. Lochbaum, Nuclear Safety Engineer, Union of Concerned Scientists Public Citizen's Critical Mass Energy Project M. Mariotte, Nuclear Information & Resources Service F. Zalcman, Pace Law School, Energy Project L. Puglisi, Supervisor, Town of Cortlandt Congresswoman Sue W. Kelly Congresswoman Nita Lowey Senator Hilary Rodham Clinton Senator Charles Schumer J. Riccio, Greenpeace A. Matthiessen, Executive Director, Riverkeepers, Inc.
M. Kapolwitz, Chairman of County Environment & Health Committee A. Reynolds, Environmental Advocates M. Jacobs, Director, Longview School D. Katz, Executive Director, Citizens Awareness Network P. Gunter, Nuclear Information & Resource Service P. Leventhal, The Nuclear Control Institute K. Copeland, Pace Environmental Litigation Clinic R. Witherspoon, The Journal News F. Wilson, Manager, Operation Training
Mr. Fred R. Dacimo 4
Distribution w/encl:
H. Miller, RA/J. Wiggins, DRA H. Nieh, RI EDO Coordinator R. Laufer, NRR P. Milano, PM, NRR G. Vissing, Backup PM, NRR P. Eselgroth, DRP W. Cook, DRP R. Martin, DRP P. Drysdale, SRI - Indian Point 3 Region I Docket Room (with concurrences)
T. Fish, Examiner, DRS C. Buracker, DRS (OL Facility File)
L. Vick, HOHB, NRR R. Conte, DRS DRS File DOCUMENT NAME: G:\\OSB\\Fish\\IP3\\60DAYRPI.WPD ADAMS PKG: ML030980753 After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBuracker (THF for)
TFish RJConte DATE 04/21/03 04/21/03 05/19/03 05/ /03 05/ /03 OFFICIAL RECORD COPY