Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 MA~Y 12 2003 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of Tennessee Valley Authority Docket No.
)
WATTS BAR NUCLEAR PLANT (WBN) -
APRIL 2003 REPORT MONTHLY OPERATING Enclosed is the April 2003 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4.
There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.
Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc:
See page 2 Pnnted on cyced paper 50 -3 90 L
U.S. Nuclear Regulatory Commission Page 2 MAY 12 2003 cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. K. N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
'z
ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)
MONTHLY OPERATING REPORT APRIL 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1 E
r
-
OPERATING DATA REPORT Docket No.
Unit Name:
Date:
Completed By:
Telephone:
Reporting Period:
50-390 WBN Unit 1 May 8, 2003 P. P. Salkeld (423) 365-3635 April 2003
- 1. Design Electrical Rating (MWe-Net):
- 2.
Maximum Dependable Capacity (MWe-Net):
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month 719 719 0.0 830918 Year-to-Date 2755 2738 0.0 3176096 Cumulative 55921 55638 0.0 61642164 E-2 1155 1125
DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-390 WBN-1 May 8, 2003 P. P. Salkeld (423) 365-3635 2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain) 4 nstructions for Preparation of Data Entry sheets for Licensec Event Report (LER)
(NUREG - 1022)
Summary:
WBN Unit 1 operated at or near 100% power for the month of April 2003. There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month.
E-3 UNIT SHUTDOWNS 1F: Forced S: Scheduled