From:

Peter Tam To:

INTernet:Dave.robillard@amergenenergy.com; INTernet:David.distel@exeloncorp.com; INTernet:John.hufnagel@exeloncorp.com; internet:Thomas.Loomis@exeloncorp.com Date:

5/14/03 4:06PM

Subject:

Oyster Creek UFSAR, Rev. 13, Review (TAC MB8769)

John:

I have gone thru the subject submittal and have the following comments/questions. Per existing NRC internal guidance, my review is purely to determine compliance of the submittal with 10 CFR 50.71. Therefore, when you respond to the following comments/questions, keep in mind that most of the time one word or one sentence would do. I propose that we hold a telecon in the near future, or, alternatively, I can come to the site, to discuss the following.

This e-mail aims solely to prepare you and others for a telecon or a discussion on site. It does not formally request for additional information, nor does it state an NRC staff position.

General On what date was the last refueling completed?

Chapter 1 Page 1.2 "The system also directs.... in the dynamic test mode" changed to "..... in the torus cooling mode." This appears to be a design change. What led to this change?

Chapter 3 Section s3.5.1.3.2, 3.5.1.3.3, and 3.5.1.4.1 - These do not appear to have been revised by Rev.

13. Despite that, they are in bold face, seemingly to indicate that they have been revised.

Chapter 4 Section 4.2.2.2.2 - What is the reason(s) for deleting the paragraph on water rods?

Section 4.3.2.7.2 - This section was completely rewritten to describe the use of Option II to address the issue of coupled neutronic/thermal-hydraulic instabilities. The NRC staff approved use of Option II at OCNGS by Amendment No. 235, dated 10/18/02 (TAC MB4960). The licensee should assess if referencing (i.e., add Reference 21) the NRC Amendment No. 235 would provide a more complete record. Note that there is no stated regulatory requirement for this, but just a suggestion to improve recordkeeping.

Table 4.4 Five lines (i.e., heat transfer surface area......average volumetric fuel temperature) were deleted from this table. Reason?

Chapter 5

Section 5.2.3.4 - This new section is on noble metal chemical addition. This change was apparently done under 10 CFR 50.59. I note that Nine Mile Point Unit 1 had to request a change to the TS on coolant chemistry (ref. NMP1 Amendment No. 169, dated 3/8/00). It appears that OCNGS TS did not need any TS change to implement noble metal chemical addition. Is that your understanding?

Chapter 6 Section 6.2.1.1.3 (page 6.2-8) - The new text describes Amendment No. 230, dated 9/11/02 (TAC MB2958), which approved new TSs concerning operability of suppression chamber-to-drywell vacuum breakers. This is a commendable practice in terms of recordkeeping.

Chapter 7 Section 7.5.1.8.7, "Average Power Range Monitor (APRM) System - On page 7.5-18, the subsection "Intermediate Slope Trip and Normal Slope Trip" was deleted. Reason?

Chapter 9 Section 9.1.2.2.3 - This section is revised to reflect a change in design basis, approved by Amendment No. 223, dated1/23/02, to eliminate the use of the cask drop protection system.

The referencing of NRC approval documents is a commendable recordkeeping practice.

Table 9.2-18 (Sheet 2 of 2) - What was changed on this sheet?

Pages 9.3-2, 9.3-3, 9.3-4, 9.3 Paragraphs on the service instrument air system were deleted. Reason?

Table 9.3 The tag numbers for service and instrument air instrumen were changed to just a letter "X." What is the significance of this change, and what is the meaning of "X"?

Chapter 15 Section 15.2.1 - A new paragraph was added regarding steam pressure regulator failure. What was the basis of this paragraph (i.e., 10 CFR 50.59 analysis, or NRC approval)?

Sections 15.6.5.6.2,.15.6.5.6.3, and 15.6.5.7 - These are new sections. Was the information reviewed by the NRC staff as part of Amendment No. 233?

Peter S. Tam, Senior Project Manager Project Directorate I-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation e-mail: pst@nrc.gov Tel.: 301-415-1451 CC:

Brian Fuller; Ed Knutson; Gordon Hunegs

Mail Envelope Properties (3EC2A1DA.65B : 10 : 20510)

Subject:

Oyster Creek UFSAR, Rev. 13, Review (TAC MB8769)

Creation Date:

5/14/03 4:06PM From:

Peter Tam Created By:

PST@nrc.gov Recipients Action Date & Time Dave Transferred 05/14/03 04:06PM robillard (INTernet:Dave.robillard@amerge David Transferred 05/14/03 04:06PM distel (INTernet:David.distel@exeloncorp.

John Transferred 05/14/03 04:06PM hufnagel (INTernet:John.hufnagel@exelonco Thomas Transferred 05/14/03 04:06PM Loomis (internet:Thomas.Loomis@exeloncorp kp1_po.KP_DO Delivered 05/14/03 04:07PM BJF CC (Brian Fuller)

Opened 05/15/03 06:39AM ECK CC (Ed Knutson)

Opened 05/14/03 04:37PM GKH CC (Gordon Hunegs)

Opened 05/15/03 06:46AM Post Office Delivered Route Dave INTernet:amergenen ergy.com David INTernet:exeloncorp.

com John INTernet:exeloncorp.

com Thomas internet:exeloncorp.c om kp1_po.KP_DO 05/14/03 04:07PM Files Size Date & Time MESSAGE 7032 05/14/03 04:06PM Options Auto Delete:

No Expiration Date:

None Notify Recipients:

Yes Priority:

Standard Reply Requested:

No Return Notification:

None Concealed

Subject:

No

Security:

Standard To Be Delivered:

Immediate Status Tracking:

Delivered & Opened