Daily Status Report for 05/29/2002
ML031320733
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/29/2002
From:
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
6422, FOIA/PA-2003-0189
Download: ML031320733 (1)


Text

772-461-4622 p.

3 Operations Department Chronological Log Unit 2 30-May-02 6422 529/2002 DAY DAVE GLISSON LARRY HARTLEe BILL CASIAS TIM SOLANDER CHARLIE PIKE NUC POWER:

94 DELTA T POWER:

94 MWE:

820 CEA GROUP :

5 POSITION:

125 T AVG:

572 BORON:

783 Xe WORTH:

-2543 MODE:

1 CALCULATED SD MARGIN: >3600 MAJOR MILESTONES OR ACTIVITIES TO BE PERFORMED DURING THE SHIFT:

25 GALS ACID OR 16 GALS OF H20 TO CHANGE RCS.1 DEGREES. BR 6.5 TO 1. COMPLETE TURBINE VALVE TE.

AND RETURN UNIT TO 100% POWER.

TIME LOG ENTRIES 6:45 CONDUCTED A BOARD WALKDOWN, TURNOVER, AND ASSUMED THE SHIFT.

8.55 I&C PERFORMING CONTROL ROOM OUTSIDE AIR INTAKE MONTHLY FUNCTIONAL AW 2-IMP-26.33.

WORKING ONE TRAIN AT A TIME BEGINNING WITH THE "A TRAIN. DECLARING A TRAIN OOS.

10:08 I&C FINISHED WITH THE "A TRAIN CROAI RAD MONITORS. DECLARED BIS. DECLARING B' TRAIN 00:

THIS TIME.

11:30 COMPLETED BRIEF FOR COMMENCING WITH THE TURBINE VALVE TEST.

11 38

.COMMENCING WITH TJRBINE VALVE TEST IAW 2-OSP-22.04. STARTING WITH #4 GOVERNOR VALVE.

11:50 SICK SEA TURTLE FOUND AT INTAKE CANAL INTRUSION NET.

IZ00 RICK HEREN OF LAND UTILIZATION NOTIFIED STATE OF FLORIDA SEA TURTLE STRANDING COORDINATOR @ 1130 OF SICK SEA TURTLE FOUND AT INTAKE CANAL INTRUSION NET. MANAGEME NOTIFICATIONS MADE.

12:35 DECLARED TURBINE GOVERNOR VALVE #4 BIS. EXITED FSAR SPEC 13.7.1.1 ACTION A FOR TURBINE OVERSPEED PROTECTION.

12:41 NOTIFIED NRC AND NDDO AND RESIDENT NRC INSPECTOR OF SICK SEA TURTLE FOUND AT INTAKE CANAL INTRUSION NET.

13:55 TURBINE VALVE TEST IAW 2-OSP-22.04 COMPLETED, SAT.

13:56 DECLARED RM-26-26 CONTAINMENT AIR MONITOR BIS FOLLOWING IC REPAIR, DECLARED RM-2625 OOS FOR MONTHLY ISC FUNCTIONAL IAW 2-IMP-26.05.

13:00 RM-26-62 CROAI MONITOR OOS DUE TO FAILED CHECK SOURCE, RM-26-66 OPERABLE, B TRAIN OUTS AIR INTAKE MONTHLY FUNCTIONAL COMPLETE.

14:10 18C PERFORMING SPENT FUEL POOL MONITOR MONTHLY FUNCTIOAL TEST lAW 2-IMP-26.35, ONE MONITOR AT A TIME.

3 NUMEER:

DATE:

SHIFT:

BOARD RCO:

DESK RCO:

NWE:

ANPS:

NPS:

US NRC ST LUCIE RESIDENT Mar 19 03 1:

47p 1

;

 I Y