MONTHYEARML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion L-2019-046, Stations - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2019-03-25025 March 2019 Stations - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2017-040, Decommissioning Funding Status Reports/Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2017-03-30030 March 2017 Decommissioning Funding Status Reports/Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2015-291, Final Compliance with EA-12-051 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation2015-12-10010 December 2015 Final Compliance with EA-12-051 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation L-2015-297, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan2015-12-10010 December 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan L-2015-215, Fifth Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard with to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)2015-08-20020 August 2015 Fifth Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard with to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) ML14064A1932014-02-28028 February 2014 Second Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) L-2013-254, First Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2013-08-28028 August 2013 First Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) L-2013-253, St. Lucie'S First Six-Month Status Report to the Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses2013-08-27027 August 2013 St. Lucie'S First Six-Month Status Report to the Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses L-2013-103, Decommissioning Funding Status Reports2013-03-25025 March 2013 Decommissioning Funding Status Reports ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML12024A3762011-12-28028 December 2011 State-of-the-Art Reactor Consequence Analyses, Current Status and Next Steps L-2009-055, Units 1 and 2, Decommissioning Funding Status Reports2009-03-27027 March 2009 Units 1 and 2, Decommissioning Funding Status Reports L-2008-018, Transmittal of Pressurized Butt Weld Alloy Report, and Mitigation Status and Swol Inspection Results2008-02-21021 February 2008 Transmittal of Pressurized Butt Weld Alloy Report, and Mitigation Status and Swol Inspection Results ML0709305552007-03-29029 March 2007 Decommissioning Fund Status Report ML0609601312006-03-27027 March 2006 Decommissioning Fund Status Report ML0418903072004-04-18018 April 2004 Event Notification Report for April 18, 2000 ML0313206902003-02-12012 February 2003 Daily Status Report for 02/12/2003 ML0313206892003-02-0303 February 2003 Daily Status Report for 02/03/2003 ML0313206872003-01-23023 January 2003 Daily Status Report for 01/23/2003 ML0313206832003-01-0202 January 2003 Daily Status Report for 01/02/2003 ML0313206822002-12-17017 December 2002 Daily Status Report for 12/17/2002 ML0313206802002-11-22022 November 2002 Daily Status Report for 11/22/2002 ML0313205062002-10-22022 October 2002 Daily Status Report for 10/22/2002 ML0313205042002-10-20020 October 2002 Daily Status Report for 10/20/2002 ML0313205012002-09-19019 September 2002 Daily Status Report for 09/19/2002 ML0313207362002-06-0202 June 2002 Daily Status Report for 06/02/2002 ML0313207332002-05-29029 May 2002 Daily Status Report for 05/29/2002 ML0224007812002-01-18018 January 2002 E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report L-76-361, Forwards Reactor Vessel Overpressurization Issue Progress Report1976-10-18018 October 1976 Forwards Reactor Vessel Overpressurization Issue Progress Report 2024-02-22
[Table view] |
Text
3 Mar 19 03 1: 47p US NRC ST LUCIE RESIDENT 772-461-4622 p.
Operations Department Chronological Log Unit 2 30-May-02 NUMEER: 6422 NUC POWER: 94 DATE: 529/2002 DELTA T POWER: 94 SHIFT: DAY MWE: 820 BOARD RCO: DAVE GLISSON CEA GROUP : 5 DESK RCO: LARRY HARTLEe POSITION: 125 NWE: BILL CASIAS T AVG: 572 ANPS: TIM SOLANDER BORON: 783 NPS: CHARLIE PIKE Xe WORTH: : -2543 MODE: 1 CALCULATED SD MARGIN: >3600 MAJOR MILESTONES OR ACTIVITIES TO BE PERFORMED DURING THE SHIFT:
25 GALS ACID OR 16 GALS OF H20 TO CHANGE RCS .1 DEGREES. BR 6.5 TO 1. COMPLETE TURBINE VALVE TE.
AND RETURN UNIT TO 100% POWER.
TIME LOG ENTRIES 6:45 CONDUCTED A BOARD WALKDOWN, TURNOVER, AND ASSUMED THE SHIFT.
8.55 I&C PERFORMING CONTROL ROOM OUTSIDE AIR INTAKE MONTHLY FUNCTIONAL AW 2-IMP-26.33.
WORKING ONE TRAIN AT A TIME BEGINNING WITH THE "A TRAIN. DECLARING A TRAIN OOS.
10:08 I&C FINISHED WITH THE "A TRAIN CROAI RAD MONITORS. DECLARED BIS. DECLARING B' TRAIN 00:
THIS TIME.
11:30 COMPLETED BRIEF FOR COMMENCING WITH THE TURBINE VALVE TEST.
11 38 .COMMENCING WITH TJRBINE VALVE TEST IAW 2-OSP-22.04. STARTING WITH #4 GOVERNOR VALVE.
11:50 SICK SEA TURTLE FOUND AT INTAKE CANAL INTRUSION NET.
IZ00 RICK HEREN OF LAND UTILIZATION NOTIFIED STATE OF FLORIDA SEA TURTLE STRANDING COORDINATOR @ 1130 OF SICK SEA TURTLE FOUND AT INTAKE CANAL INTRUSION NET. MANAGEME NOTIFICATIONS MADE.
12:35 DECLARED TURBINE GOVERNOR VALVE #4 BIS. EXITED FSAR SPEC 13.7.1.1 ACTION A FOR TURBINE OVERSPEED PROTECTION.
12:41 NOTIFIED NRC AND NDDO AND RESIDENT NRC INSPECTOR OF SICK SEA TURTLE FOUND AT INTAKE CANAL INTRUSION NET.
13:55 TURBINE VALVE TEST IAW 2-OSP-22.04 COMPLETED, SAT.
13:56 DECLARED RM-26-26 CONTAINMENT AIR MONITOR BIS FOLLOWING IC REPAIR, DECLARED RM-2625 OOS FOR MONTHLY ISC FUNCTIONAL IAW 2-IMP-26.05.
13:00 RM-26-62 CROAI MONITOR OOS DUE TO FAILED CHECK SOURCE, RM-26-66 OPERABLE, B TRAIN OUTS AIR INTAKE MONTHLY FUNCTIONAL COMPLETE.
14:10 18C PERFORMING SPENT FUEL POOL MONITOR MONTHLY FUNCTIOAL TEST lAW 2-IMP-26.35, ONE MONITOR AT A TIME.