Daily Status Report for 02/12/2003
ML031320690
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/12/2003
From:
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0189, LER-03-001-00
Download: ML031320690 (1)


Text

Mtar 19 03 12: 49p US NRC ST LUC IE RES IDENT 772-461-4622 p.11 LAR Unlt Submittal Exp issue Description Next Action Number Date Date/Outage 2001-017 2 T 2/19103 SL2-14 UNIT 2 ISI RJR 34 NON-CODE REPAIR OF ENG -MEC.H THE 2A AND 2B ICW PUMP DISCHARGE HEADERS ASME CLASS 3 ICW SYSTEM PIPING LINES. NRC COMMITMENT TO RPR/REPL AFFECTED PIPING DURING SL2-

14. RAI 2003-002 1/2 T 2/28103 SL2-14 U1/2 ISI RJR 24/36 ALTERNATE TO UT ENG-C'I SLI-19 QUALIFICATION INSPECTION, FOR DISSIMILAR METAL PIPING WELDS.

.________ INDUSTRY ISSUE. -_.

2002-006 2 T 3/3103 SL2-14 REDUCE TECH SPEC MINIMUM RCS FLOW ENG-FUELS TO ACCOMMODATE 15% SIG TUBE

.___ ________ ________ P W GGING - RAI.

2001-020 1/2 T 4/1/03 SL2-14 ISI PLAN - CONTINGENCY R/R 20,21.30,31 ENG-C3I SUPP OUTAGE RX HEAD RPR SUPP WMELD

____________________ ________ PROC QUALS - RA.

L***ICENSING***

(cont'd)

LICENSEE EVENT REPORT STATUS:

UNIT 1:

LER - Due CR Numob er- P.W e rDogrl .t.&3o 03-001 0 414103 Ul CREACS IN-LEAKAGE 03-0319 UNIT 2:

NONE

      • PROTECTION SERVICES ***

NAME: NWh!Vng DATE/TIME: 02/12/2003 ENVIRONMENTAL COMPLIANCE STATUS: SITE A diseased loggerhead turtle removed from the intake canal was sent to rehab 2/12. Not causal to plant operation. All notifications made as necessary.

Less than 25 gallons of diesel fuel was spilled on the pavement in the back yard during a pump down of the Unit 1 Diesel Sump on peak shift 2/12.. Not reportable. Spill cleaned up by MM.

  • * *SECURITY * **

NAME: . Boskey DATEITIME: 02/1312003