ML031320501
| ML031320501 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 09/19/2002 |
| From: | Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2003-0189, LER 02-002-00 | |
| Download: ML031320501 (1) | |
Text
LAR Unit Submittal Exp Issuc Description Next Action Number Date Date/Outage
,PS0tXI.
->S*jl!:P i;;--
a 2001-02C 112 11/21/01 SL1-18 (ISI PLAN - CONTINGENCY RIR 20, 21, 30, ENG SUPP T 9123/02 31 OUTAGE RX HEAD RPR SUPP WNVELD PROC QUALS j(ROUTING L-2002-178)
P2002-004 1
T 9/25102 SLI-18 ISI R/R CONTINGENCY FOR PZR & RCS ENG-CSI HOT LEG NOZZLES AS ALTERN. RPR P2002-006 2
10102 CNRB SL2-14 REDUCE TECH SPEC MINIMUM RCS FLOV ENG-NF T 10/31/02 TO ACCOMMODATE 15% SIG TUBE WEST/CE PLUGGING LICENSING * * *
(cont'd)
LICENSEE EVENT REPORT STATUS:
UNIT 1:
NONE UNIT 2:
LER Due CR Number Rev Date Description Number 02-002 0
10/18/02 U2 PSV SETPOINT DRIFT CR02-1786
- ** PROTECTION SERVICES ***
NAME: NWhiting DATE/TIME: 0911912002 ENVIROhlMENTAL COMPLIANCE STATUS:
SITE Work is underway to upgrade the support structure for the primary turtle barrier net in the intake canal. You may hear the pilings being driven.
- ** SECURITY **
- NAME: J. McCullough DATEITIME: 0911912002 0
W3E1IS3EI 3I1 1i iS oa sn GENERAL INFORMATION Loggable Events:
Compensatory Posts:
COMMENTS JS2: 10 O 61 Jew a29if-I 9b1-LL