ML031250318

From kanterella
Jump to navigation Jump to search
Summary of Meeting with Exelon Generation Co., LLC to Discuss Dresden End of Cycle Plant Performance Assessment
ML031250318
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/16/2003
From: Ring M
NRC/RGN-III/DRP/RPB1
To:
References
Download: ML031250318 (2)


Text

April 16, 2003 LICENSEE: Exelon Generation Company, LLC FACILITY: Dresden Nuclear Power Station

SUBJECT:

SUMMARY

OF THE APRIL 8, 2003, MEETING WITH EXELON GENERATION COMPANY, LLC TO DISCUSS DRESDEN PERFORMANCE On April 8, 2003, a public meeting was held at the Grundy County Board Room, Morris, Illinois, between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company staff.

The purpose of the meeting was to discuss NRCs assessment of Dresdens performance for the period of January 1, 2002, through December 31, 2002.

During the NRC presentation, an overall assessment of Dresden performance was provided.

As explained in the Annual Assessment letter from NRC to Mr. J. Skolds, President, Exelon Nuclear, dated March 4, 2003, reference ADAMS accession number ML030640306, Dresden operated in a manner that preserved public health and safety and fully met all cornerstone objectives. The slides presented that evening by the NRC are available in ADAMS (accession number ML030920506).

Before adjourning the meeting the NRC provided the opportunity for members of the public to ask questions.

/RA/

Mark A. Ring, Chief Branch 1 Division of Reactor Projects cc: J. Dyer, Regional Administrator J. Caldwell, Deputy Regional Administrator G. Grant, Director, DRP S. Reynolds, Deputy Director, DRP M. Ring, Chief, Branch 1, DRP R. Lerch, Project Engineer, DRP D. Smith, SRI, Dresden B. Dickson, RI, Dresden

DOCUMENT NAME: G:\Branch TSS\EOC Ltrs\eoc 030403\Mtg.

Summaries\ML031250318.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII NAME MRing/co DATE 04/16/03 OFFICIAL RECORD COPY