ML030920506

From kanterella
Jump to navigation Jump to search
Summary of Meeting with Exelon Generation Co., LLC to Discuss Dresden End of Cycle Plant Performance Assessment. NRC Presentation Slides
ML030920506
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/16/2003
From: Ring M
NRC/RGN-III/DRP/RPB1
To:
References
Download: ML030920506 (15)


Text

Annual Assessment Meeting Nuclear Regulatory Commission

NRC Performance Goals P Maintain safety and protect the environment P Enhance public confidence P Improve effectiveness, efficiency, and realism of processes and decision making P Reduce unnecessary regulatory burden

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Key Aspects of the Assessment Program P Objective review of licensee performance P Action Matrix identifies agency response commensurate with safety significance P Increasing safety significance results in:

- Increased levels of inspection

- Involvement of higher levels of NRC and Licensee management

- Increased regulatory action P Plant specific assessment information on NRC public web site

Regional Organization Jim Dyer Regional Administrator Jim Caldwell Deputy Geoffrey E. Grant Cynthia Pederson Director Division of Reactor Projects Director Division of Reactor Safety Steven Reynolds Roy Caniano Deputy Director Deputy Director Mark Ring Regional Specialists Branch Chief Robert Lerch Project Engineer Desiree Smith Billy Dickson Senior Resident Inspector Resident Inspector

Annual Licensee Assessment Meeting P A public forum for discussion of the licensees performance P NRC will address the licensee performance issues identified in the Annual Assessment Letter P Licensee will respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance

P P ROP Action Matrix Summary Column 1 - Licensee Response Column 2 - Regulatory Response P

P for 2002 Column 3 - Degraded Cornerstone Column 4 - Multiple/ Repetitive Degraded Cornerstone P Column 5 - Unacceptable Performance (Nationwide number does not contain Davis Besse)

Column 1 Column 2 Column 3 Column 4 Column 5 Nationwide 59 33 7 3 0 Region I 9 14 2 1 0 Region II 26 4 1 1 0 Region III 11 10 2 0 0 Region IV 13 5 2 1 0

Security & Safeguards Update P Creation of Office of Nuclear Security and Incident Response P Top-to-Bottom Review of Security Program Initiated P Issuance of Orders/ Interim Compensatory Measures (ICM)

P Verification of Licensee Actions on ICM

Security & Safeguards Update P Proposed Revisions to Design Basis Threat P Pending Orders on Fatigue/Guard Training P Initiation of Pilot Force-on-Force Excercise Program

P Name of Plant:

P Plant Operator:

P Number of Units:

P Reactor Type and Vendor:

P Location:

P Power Output (electrical):

P Source of Circulating Water:

Major Plant Activities in 2002 Plant Performance Summary Greater than GREEN PIs and Findings (Details)

Contacts for additional information for:

(Enter plant name here)

P Regional Public Affairs Officer:

< Name: Jan Strasma

< Phone: 630-829-9663 P State Liaison Officer:

< Name: Roland Lickus

< Phone: 630-829-9660 P Branch Chief:

< Name:

< Phone:

P Senior Resident Inspector:

< Name:

< Phone

Contacting the NRC P Report an emergency

< (301) 816-5100 (call collect)

P Report a safety concern:

< (800) 695-7403

< Allegation@nrc.gov P General information or questions

< www.nrc.gov

< Select What We Do for Public Affairs