Summary of Meeting with Exelon Generation Co., LLC to Discuss Dresden End of Cycle Plant Performance Assessment. NRC Presentation SlidesML030920506 |
Person / Time |
---|
Site: |
Dresden ![Constellation icon.png](/w/images/b/be/Constellation_icon.png) |
---|
Issue date: |
04/16/2003 |
---|
From: |
Ring M NRC/RGN-III/DRP/RPB1 |
---|
To: |
|
---|
References |
---|
Download: ML030920506 (15) |
|
|
---|
Category:Slides and Viewgraphs
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23251A0782023-09-0606 September 2023 DRE1 Decom Pre-Submittal Slides ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23173A0462023-06-28028 June 2023 DNPS SLR Pre-submittal Meeting Presentation Rev. 1 ML23173A0472023-06-28028 June 2023 SLRA - NRC Presubmittal Meeting Slides - 6-28-23 ML23165A0242023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23145A1322023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - Constellation Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML22053A2912022-02-22022 February 2022 NRC Slides for February 25, 2022 Meeting - Acceptance Review of Proposed Alternative to Adopt ASME Code Case N-921 at Dresden and Quad Cities ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21194A1822021-07-13013 July 2021 and Quad Cities Nuclear Generating Stations 2020 Annual Assessment Meeting Slides ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML20258A0302020-09-22022 September 2020 Decommissioning Licensing Action Submittal Plan for Byron and Dresden Stations Early Shutdowns ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20238B8572020-08-25025 August 2020 Quad 2019 Hq Online EOC Slides ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18207A1882018-07-26026 July 2018 Slides for Dresden 2017 EOC Open House ML18086A8432018-03-27027 March 2018 NUREG-1021, Revision 11 Implementation ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17156A7972017-06-0505 June 2017 Presentation for 2016 Dresden Nuclear Power Station EOC Open House ML16189A2552016-07-0707 July 2016 Annual Assessment Meeting/Open House (Hand Out) ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML15135A4252015-05-19019 May 2015 EOC Mtg Slides ML15013A1562015-01-14014 January 2015 Meeting Slide Regarding Dresden Nuclear Power Station Pre-Application Meeting for Providing Natural Gas as a Primary Fuel to Station Auxiliary Heating Boilers RS-14-238, Transmittal of Proprietary Meeting Slides2014-08-25025 August 2014 Transmittal of Proprietary Meeting Slides ML14232A7852014-05-19019 May 2014 Fuel Transition License Amendment Request Pre-Submittal Update Meeting ML13149A2062013-05-22022 May 2013 NRC Slides from Public Meeting ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML11201A2132011-07-20020 July 2011 Summary of Public Meeting to Discuss Exelon'S Plans for Implementing an Electronic Document Control System (Edocs) for Use by NRC Inspectors with U.S. Nuclear Regulatory Commission (NRC) Region III Staff ML1113202162011-05-11011 May 2011 Slides for Dresden Nuclear Power Station End-Of-Cycle Public Open House ML1012000332010-04-28028 April 2010 Annual Assessment Meeting Slides ML0929400522009-10-22022 October 2009 Meeting Power Uprate Meeting Slides ML0914003382009-05-14014 May 2009 Slides Presented at the Dresden Station 2008 EOC Public Meeting ML0812007842008-06-0202 June 2008 Meeting Slides, Nrc/Exelon Licensing Counterparts Meeting. ML0812209792008-04-30030 April 2008 Meeting Slides, Dresden Annual Assessment Meeting, Reactor Oversight Program - Cy 2007. ML0811504162008-04-22022 April 2008 Pandemic Planning Utility Interface with NRC Slide Presentation ML0714404642007-05-23023 May 2007 End-of-Cycle Meeting - NRC Slides ML0716601022007-03-20020 March 2007 Slides to Counterparts Meeting with Exelon to Discuss Current and Planned Licensing Activities and Process - Correction ML0705101392007-02-16016 February 2007 2007 Emergency Preparedness and Incident Response Public Meeting: Status of the EP Threat Based Project, 2/16/07 ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0613000812006-04-26026 April 2006 Annual Plant Performance Public Meeting - NRC Presentation Slides ML0617802832006-03-0707 March 2006 RIC 2006 Presentation - T2F - J. Bradley Fewell - Allegations ML0615901482006-03-0707 March 2006 RIC 2006 Presentation - T1E - Pamela B. Cowan - Licensing Issues 2024-01-30
[Table view] |
Text
Annual Assessment Meeting Nuclear Regulatory Commission
NRC Performance Goals P Maintain safety and protect the environment P Enhance public confidence P Improve effectiveness, efficiency, and realism of processes and decision making P Reduce unnecessary regulatory burden
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
Key Aspects of the Assessment Program P Objective review of licensee performance P Action Matrix identifies agency response commensurate with safety significance P Increasing safety significance results in:
- Increased levels of inspection
- Involvement of higher levels of NRC and Licensee management
- Increased regulatory action P Plant specific assessment information on NRC public web site
Regional Organization Jim Dyer Regional Administrator Jim Caldwell Deputy Geoffrey E. Grant Cynthia Pederson Director Division of Reactor Projects Director Division of Reactor Safety Steven Reynolds Roy Caniano Deputy Director Deputy Director Mark Ring Regional Specialists Branch Chief Robert Lerch Project Engineer Desiree Smith Billy Dickson Senior Resident Inspector Resident Inspector
Annual Licensee Assessment Meeting P A public forum for discussion of the licensees performance P NRC will address the licensee performance issues identified in the Annual Assessment Letter P Licensee will respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance
P P ROP Action Matrix Summary Column 1 - Licensee Response Column 2 - Regulatory Response P
P for 2002 Column 3 - Degraded Cornerstone Column 4 - Multiple/ Repetitive Degraded Cornerstone P Column 5 - Unacceptable Performance (Nationwide number does not contain Davis Besse)
Column 1 Column 2 Column 3 Column 4 Column 5 Nationwide 59 33 7 3 0 Region I 9 14 2 1 0 Region II 26 4 1 1 0 Region III 11 10 2 0 0 Region IV 13 5 2 1 0
Security & Safeguards Update P Creation of Office of Nuclear Security and Incident Response P Top-to-Bottom Review of Security Program Initiated P Issuance of Orders/ Interim Compensatory Measures (ICM)
P Verification of Licensee Actions on ICM
Security & Safeguards Update P Proposed Revisions to Design Basis Threat P Pending Orders on Fatigue/Guard Training P Initiation of Pilot Force-on-Force Excercise Program
P Name of Plant:
P Plant Operator:
P Number of Units:
P Reactor Type and Vendor:
P Location:
P Power Output (electrical):
P Source of Circulating Water:
Major Plant Activities in 2002 Plant Performance Summary Greater than GREEN PIs and Findings (Details)
Contacts for additional information for:
(Enter plant name here)
P Regional Public Affairs Officer:
< Name: Jan Strasma
< Phone: 630-829-9663 P State Liaison Officer:
< Name: Roland Lickus
< Phone: 630-829-9660 P Branch Chief:
< Name:
< Phone:
P Senior Resident Inspector:
< Name:
< Phone
Contacting the NRC P Report an emergency
< (301) 816-5100 (call collect)
P Report a safety concern:
< (800) 695-7403
< Allegation@nrc.gov P General information or questions
< www.nrc.gov
< Select What We Do for Public Affairs