April 24, 2003 MEETING

SUMMARY

LICENSEE: ENTERGY NUCLEAR GENERATION COMPANY FACILITY: FITZPATRICK NUCLEAR POWER STATION

SUBJECT:

SUMMARY

OF APRIL 9, 2003, ANNUAL ASSESSMENT MEETING WITH ENTERGY On April 9, 2003, at 1:00 p.m., an annual assessment meeting was conducted at the Joint News Center in Fulton, New York, between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Generation Company. The NRC presented and discussed its assessment of the safety performance of FitzPatrick Nuclear Power Station for the period between January 1 through December 31, 2002.

The NRC presented a summary of national plant performance and discussed the annual assessment results for FitzPatrick. An update on NRC actions to enhance nuclear plant security was also presented. At the end of the meeting between the NRC and Entergy, public attendees were offered the opportunity to ask questions of NRC officials. The attendance list is enclosed (Enclosure 1). The presentation slides can be located in the Agencywide Documents Access and Management Systems (ADAMS) by referring to Accession No. ML031040362.

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects

Enclosure 1 NRC Attendees: G. Meyer, Chief, Projects Branch 3, Region 1 L. Cline, Senior Resident Inspector D. Dempsey, Resident Inspector Licensee Attendees: T. Sullivan, Vice-President, Operations B. OGrady, General Manager, Plant Operations B. Maguire, Director - Safety Assurance O. Limpias, Director - Engineering State and Local Government Attendees:

M. Sorbello, Oswego County Legislature P. Santore, Oswego County Legislature R. Simmons, Oswego County Legislature L. McDermott, Office Manager - Senator Wright Meeting Observers: G. Hunegs, Senior Resident Inspector, Nine Mile Point T. Gurdziel, Oswego Resident E. Stronski, Oswego Resident K. Yerdon, IBEW Local 97

Entergy Nuclear Generation Company 3 DOCUMENT NAME: C:\ORPCheckout\FileNET\ML031190659.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy 2)),&( 5,'53   