ML030770315

From kanterella
Jump to navigation Jump to search
Notice of Meeting Annual Assessment of Safety Performance Fitzpatrick Nuclear Power Station
ML030770315
Person / Time
Site: FitzPatrick 
(DPR-059)
Issue date: 03/18/2003
From: Meyer G
Reactor Projects Branch 3
To:
Shared Package
ml030760776 List:
References
03-017
Download: ML030770315 (4)


Text

March 18, 2003 U.S. NUCLEAR REGULATORY COMMISSION REGION I No.03-017 NOTICE OF LICENSEE MEETING Licensee:

Entergy Nuclear Generation Company Facility:

Fitzpatrick Nuclear Power Station Docket No.

50-333 Time and Date:

1:00 p.m. on April 9, 2003 Location:

Emergency Operations Facility - Joint News Center Oswego County Airport 2262 NY State Route 176 Fulton, NY 13069

Purpose:

NRC staff and Entergy management will discuss NRC's annual assessment of the safety performance at the Fitzpatrick Nuclear Power Station. The annual assessment letter for Fitzpatrick dated March 3, 2003, can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2002q4.pdf Information relative to the NRCs Annual Assessment process and the safety performance of Fitzpatrick Station can be found on the NRCs web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html NRC Attendees:

G. Meyer Chief, Projects Branch 3, Region I L. Cline, Senior Resident Inspector, Fitzpatrick D. Dempsey, Resident Inspector, Fitzpatrick S. Barber, Senior Project Engineer Entergy Attendees:

T. Sullivan, Vice President - Operations B. OGrady, General Manager - Plant Operations O. Limpias, Director, Site Engineering W. McGuire, Director - Safety Assurance Et. Al.

2 NOTE:

This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Handicapped persons requiring assistance to attend or participate in this meeting shall make their request known to the NRC point-of-contact no later than two business days prior to the meeting.

The NRC point-of-contact for this meeting is Glenn W. Meyer and he can be contacted as follows:

Mail:

US Nuclear Regulatory Commission - Region I 475 Allendale Road King of Prussia, PA 19406-9866 Telephone:

610-337-5211, or toll-free at 1-800-432-1156 E-mail: gwm@nrc.gov Attendance by additional NRC personnel should be made known by April 7, 2003, via telephone call to Mr. Glenn Meyer at (610) 337-5211.

Approved by:

/RA/_______________________

Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects

3 Distribution w/encl:

Mr. T. Sullivan, Vice President - Operations G. Meyer, DRP S. Barber, DRP L. Cline, - SRI Fitzpatrick L. Larche, DRP Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)

4 Distribution (Via E-Mail):

W. Travers, Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

W. Kane, Deputy Executive Director for Reactor Programs, OEDO S. Collins, Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Regulatory Research (NRR/OD)

C. Grimes, Director, Division of Regulatory Improvement Programs, NRR B. Boger, Director, Division of Inspection Program Management, NRR F. Congel, Director, Office of Enforcement D. Matthews, Director, Division of Regulatory Improvement Programs, NRR J. Zwolinski, Director, Division of Licensing Project Management, NRR T. McGinty, RI EDO Coordinator, OEDO R. Laufer, Project Directorate I-1 (PD1/2), NRR G. Vissing, Project Manager, NRR P. Milano, NRR (Backup)

W. Lanning, DRS R. Crlenjak, DRS D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA G. Matakas, ORA PMNS NRCWEB OEMAIL OEWEB DOCUMENT NAME: G:\\BRANCH3\\MEETINGS\\Fitz EOC Mtg 4-9-03.wpd After declaring this document An Official Agency Record it will be released to the Public. To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP E RI/DRP NAME SBarber/GSB GMeyer/GWM DATE 03/17/03 03/18/03 OFFICIAL RECORD COPY