Transmittal of Technical Specification Amendment 216
ML031140368
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 03/26/2003
From:
Entergy Nuclear Indian Point 3
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AP-18.2
Download: ML031140368 (13)


Text

Page:

2 06-MAR-03 DISTRIBUTION CONTROL LIST lOcument Name:

ITS/BASES/TRM CC-NAME NAME DEPT 497 L.GRANT(LRQ-OPS/TRAIN)

LRQ (UNIT 3/IPEC ONLY) 498 D. PITT TRAINING -

ILO CLASSES 499 D. PITT TRAINING -

ILO CLASSES 500 C.STELLATO(NRQ-OPS TRN)

NRQ (UNIT 3/IPEC ONLY) 501 C.STELLATO(NRQ-OPS TRN)

NRQ (UNIT 3/IPEC ONLY) 512 C.STELLATO(NRQ-OPS TRN)

NRQ (UNIT 3/IPEC ONLY) 513 C.STELLATO(NRQ-OPS TRN)

NRQ (UNIT 3/IPEC ONLY) 9518 DOCUMENT CONTROL DESK ANRC (ALL EP'S) 527 MILIANO PATRICK NRC/SR. PROJECT MANAGER 528 GILMAN MARIE OPS/(1 STOP SHOP/LG.DWG) 529 DECLEMENTE VINNIE OPS/(TYPE A DWG LG/ONLY)

LOCATION

  1. 48 48-2-A 48-2-A
  1. 48
  1. 48
  1. 48
  1. 48 OFFSITE OFFSITE IP2 IP3/2ND FL A1o

IEn tergy Indian Point 3 AP-18.2 Revision 10 Page lof 1 CONTROLLED DOCUMENT TRANSMITTAL FORM TO: DISTRIBUTION DATE 3/26/2003 TRANSMITTAL NO: 27856 FROM:IP3 DOCUMENT CONTROL GROUP EXTENSION: 2038 The Document(s) identified below are forwarded for use. In accordance with AP-18.2, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.

AFFECTED DOCUMENT:

ITS/BASES/TRM:

TECH SPEC AMENDMENT 216 DOC #

REV #

TITLE INSTRUCTIONS

                        • FOLLOW ATTACHED INSTRUCTIONS**********
  • PL.EASE NOTF FFFFCTTVFP 1ATS**

RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).

NAME (PRINT)

SIGNATURE DATE CC#

Distribution of 1P3 Technical Specification Amendment 216 (Approved by NRC March 25, 2003)

Pages are to be inserted into your controlled copy of the IP3 Technical Specifications following the instructions listed below. The TAB notation indicates which section the pages are located.

REMOVE PAGES INSERT PAGES TAB - Facility Operating License Page 3, (Amendment 215)

Page 3, (Amendment 216)

TAB - List of Effective Pages Pages 1 through 3, (Amendment 215)

Pages 1 through 3, (Amendment 216)

TAB - List of Amendments Page 12 Page 12 TAB 3.4 - Reactor Coolant System Page 3.4.9-1 (Amendment 205)

Page 3.4.9-2 (Amendment 205)

Page 3.4.9-1 (Amendment 216)

Page 3.4.9-2 (Amendment 216)

TAB 3.8 - Electrical Power Page 3.8.4-1 (Amendment 208)

Page 3.8.4-la (Amendment 208)

Page 3.8.4-2 (Amendment 209)

Page 3.8.4-3 (Amendment 208)

Page 3.8.4-1 (Amendment 216) none Page 3.8.4-2 (Amendment 216)

Page 3.8.4-3 (Amendment 216)

C.

This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter l: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level ENO is authorized to operate the Amdt. 215 facility at steady state reactor core Power 3-17-2003 levels not in excess of 3067.4 megawatts thermal (100% of rated power)

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 216 are hereby incorporated in the License. ENO shall operate the facility in accordance with the Technical Specifications.

(3)

(DELETED)

(4)

(DELETED)

D.

(DELETED)

Amdt. 46 2-16-83 E.

(DELETED)

Amdt. 37 5-14-81 F.

This amended license is also subject to appropriate conditions by the New York State Department of Environmental Conservation in its letter of May 2, 1975, to Consolidated Edison Company of New York, Inc., granting a Section 401 certification under the Federal Water Pollution Control Act Amendments of 1972.

G.

ENO shall fully implement and maintain in effect Amdt. 81 all provisions of the Commission-approved physical 6-6-88 security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and CFR 50.54(p).

The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Indian Point 3 Nuclear Power Plant Physical Security Plan," with revisions submitted through December 14, 1987; "Indian Point 3 Nuclear Power Plant Amendment No. 216

INDIAN POINT 3 TECHNICAL SPECIFICATIONS - APPENDIX A LIST OF EFFECTIVE PAGES Page 1 of 3 Page I Amend Table of Contents 205 205 ii 207 IV 210 v

207 Section 1.1 1

205 2

205 3

205 4

205 5

213 6

205 7

205 8

205 Section 1.2 1

205 2

205 3

205 Section 1.3 1

205 2

205 3

205 4

205 5

205 6

205 7

205 8

205 9

205 10 205 11 205 12 205 13 205 Section 1.4 1

205 2

205 3

205 4

205 Section 2.0 1

1 205 2

1 213 Section 3.0 1

205 2

205 3

205 4

212 5

205 Section 3.1.1 1

[ 205 Section 3.1.2 1

j205 2

205 Section 3.1.3 1

205 2

205 Section 3.1.4 1

205 2

205 3

205 4

205 5

205 Section 3.1.5 1

T205 2

205 Section 3.1.6 1

205 2

205 3

205 Section 3.1.7 1

205 2

205 3

205 4

205 Section 3.1.8 1

f205 2

205 Section 3.2.1 1

205 2

205 3

205 Section 3 2.2 1

205 2

205 3

205 Section 3.2.3 1

205 2

205 3

205 4

205 Section 3.2.4 1

205 2

205 3

205 4

205 Section 3.3.1 1

205 2

205 3

205 4

205 5

205 6

205 7

205 8

205 9

205 10 205 11 205 12 205 13 205 14 205 15 205 16 205 17 205 18 205 19 205 20 205 Section 3.3.2 1

205 2

205 3

205 4

205 5

205 6

205 7

205 8

213 9

213 10 205 11 213 12 205 13 205 Section 3.3.3 1

211 2

211 3

205 4

211 5

211 Section 3 3.4 1

1205

_2 _

205 Section 3.3.5 l1 205 2

1205 Section 3.3.6 1

205 2

205 3

205 4

205 5

205 Section 3.3.7 1

1205 2

1205 3

1205 Section 3.3.8 1

215 2

1205 Section 3.4.1 1

205 2

j 205 Section 3.4.2 1

1 205 Section 3.4.3 1

205 2

205 3

213 The latest amendment reflected in this list is: Amendment 216

INDIAN POINT 3 TECHNICAL SPECIFICATIONS - APPENDIX A LIST OF EFFECTIVE PAGES Page 2 of 3 4

213 5

213 Section 3.4.4 1

l 205 12 1 213 Section 3.4 13 Section 3.4.5 1

205 2

205 3

205 Section 3.4.6 1

205 2

205 3

j 205 Section 3 4.7 1

205 2

205 3

205 Section 3.4.8 1

205 2

205 1

205 2

205 Section 3 4.14 1

205 2

205 3

205 4

205 5

205 Section 3 4.15 1

205 2

205 3

205 4

205 Section 3 4.16 1

205 2

205 3

{

205 4

205 Section 3.5.1 1

205 2

205 3

205 Section 3.5.2 1

205 2

205 3

205 205 Section 3.4 9 1

l216 2

216 Section 3 4.10 1

1 205 2

1 205 Section 3.4.11 1

205 2

205 3

205 Section 3 4.12 1

205 2

205 3

205 4

205 5

205 6

205 7

205 8

205 9

213 10 213 11 213 3

205 4

205 5

205 Section 3.6.3 1

205 2

205 3

205 4

205 5

205 6

205 Section 3.6 4 1

1 205 Section 3.6.5 1

l 205 Section 3.6 6 1

J205 2

205 3

205 4

205 Section 3.6.7 1

205 2

205 Section 3 6 8 1

205 2

j 205 Section 3 6.9 1

205 2

205 Section 3 6.10 1

205 2

205 3

205 4

205 Section 3.7.1 1

205 2

205 3

213 4

205 Section 3.7.2 1

205 2

j 205 3

1 205 Section 3.7.3 1

207 2

207 3

207 Section 3.7.4 1

1205

_2 205 Section 3.7.5 1

205 2

205 3

205 4

205 Section 3.7.6 1

1 205 2

J 205 Section 3.7.7 1

205 2 _

205 Section 3.7.8 1

1 205 2

1205 Section 3.7.9 1

205 2

205 3

205 Section 3.7.10 1

1 205 Section 3.7.11 l 1 205 L2 205 Section 3.7.12 1

l 205 Section 3.7.13 l 1 215 12 205 Section 3.7.14 1

f 205 Section 3.7.15 l 1 205 2

1205 Section 3.5.3 1

[ 205 2

[ 205 Section 3.5.4 1

[ 205 2

[ 205 Section 3.6 1 1

[ 205 2

j 205 Section 3.6.2 1

205 2

j 205 The latest amendment reflected in this list is: Amendment 216

INDIAN POINT 3 TECHNICAL SPECIFICATIONS - APPENDIX A LIST OF EFFECTIVE PAGES Page 3 of 3 Section 3.7.16 1

205 2

205 3

205 Section 3.7.17 1

1 205 1

205 2

205 3

205 Section 3.8.1 1

205 2

205 3

205 4

205 5

205 6

205 7

205 8

205 9

205 10 205 Section 3.8.2 1

205 205 3

205 4

205 Section 3.8 3 1

205 2

205 3

205 4

205 5

205 Section 3.8.4 1216 2

216 2216 Section 3.8.5 1

1 205 2

205 Section 3.8.6 1

205 2

205 3

205 4

205 Section 3.8 8 1

T205 2

205 Section 3.8.9 1

205 2

205 Section 3 8.10 1

T 205 2

205 Section 3.9.1 1

205 Section 3.9.2 1

205 2

205 Section 3.9.3 1

215 2

215 3

215 Section 3.9.4 1

[ 205 2

[

205 Section 3.9.5 1

205 2

205 Section 3.9.6 1

1 205 Section 4.0 1

205 2

205 3

205 Section 5.0 1

205 2

205 3

205 4

205 5

205 6

205 7

205 8

205 9

210 10 205 11 205 12 205 13 205 14 205 15 205 16 205 17 205 18 205 19 205 20 205 21 205 22 205 23 205 24 205 25 205 26 205 27 205 28 205 29 205 30 206 31 206 32 205 33 205 34 205 35 205 36 205 37 205 38 205 Section 3.8.7 The latest amendment reflected in this list is: Amendment 216

Entergy Nuclear Operations, Inc Indian Point 3 Nuclear Power Plant License Amendments Page 12 AMENDMENT SUBJECT LETTER DATE 203 IP3 Facility Operating License No. DPR-64 11/21/00 transferred to ENIP3 and ENO from NYPA 204 Change the applicability of the quadrant 12/20/00 Power tilt limits from 2% to 50% power 205 Conversion of 'CTS' to 'ITS' based on 02/27/01 NUREG-1431, Standard Technical Specifications 206 One-time change of test frequency for ILRT 04/17/01 from 10 years to 15 years 207 Requirements for Main Feedwater Inlet Isolation 04/18/01 Valves (MFIIVs) and asociated low flow bypass valves added to Section 3.7.3 208 One-time relaxation of Completion Time for 09/19/01 an inoperable DC electrical power subsystem (31 or 32) to support replacement of station batteries.

209 Revise surveillance acceptance criteria 01/17/02 (SR 3.8.4.1) for new station batteries 31 and 32.

210 Delete requirements for Post Accident Sampling 02/06/02 (TSTF 366) 211 Clarifications / corrections for Post Accident 04/25/02 Monitoring Instrumentation (Section 3.3.3) 212 Revise SR 3.0.3 regarding the time limit for 06/27/02 entering a condition statement after discovering a missed surveillance (TSTF 358) 213 1.4% increase in core thermal power; 11/26/02 from 3025MWt to 3067.4MWt.

214 Revision of Licensing Basis for CCW piping 01/27/03 in the Fuel Storage Building 215 Adoption of Alternate Source Term for the 03/17/03 Fuel Handling Accident 216 Relaxation of pressurizer water level limit 03/25/03 for Mode 3.

Also delete one-time changes from Amendment 208

Pressurizer 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Pressurizer LCO 3.4.9 The pressurizer shall be OPERABLE with:

a.

Actual pressurizer water level < 58.3% in MODES 1 and 2 or < 90% in MODE 3; and

b.

Two groups of pressurizer heaters OPERABLE with the capacity of each group 2 150 kW and capable of being powered from an emergency power supply.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Pressurizer water A.1 Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> level not within reactor trip breakers limit.

open.

AND A.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B. One required group of B.1 Restore required group 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> pressurizer heaters of pressurizer heaters inoperable.

to OPERABLE status.

C. Required Action and C.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B AND not met.

C.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> INDIAN POINT 3 3.4.9-1 Amendment 216

Pressurizer 3.4.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.9.1 Verify actual pressurizer water level is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

< 58.3% in MODES 1 and 2 OR < 90% in MODE 3.

SR 3.4.9.2 Verify capacity of each required group of 24 months pressurizer heaters is > 150 kW.

INDIAN POINT 3 3.4.9-2 Amendment 216

DC Sources - Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources - Operating LCO 3.8.4 The following four DC electrical power subsystems shall be OPERABLE:

Battery 31 and associated Battery Battery 32 and associated Battery Battery 33 and associated Battery Battery 34.

Charger; Charger; Charger; and APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. DC electrical power A.1 Declare Inverter 34 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> subsystem 34 inoperable and take inoperable.

Required Actions specified in LCO 3.8.7, Inverters-Operating.

B. One DC electrical B.1 Restore DC electrical 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> power subsystem (31 or power subsystem to 32 or 33) inoperable.

OPERABLE status.

C. Required Action and C.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Associated Completion Time not met.

AND C.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I

INDIAN POINT 3 3.8.4 - 1 Amendment 216

DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage on float charge 31 days is within the following limits:

a.

> 125.7 V for battery 31;

b.

> 123.5 V for battery 32; and

c.

> 127.8 V for batteries 33 and 34.

SR 3.8.4.2


NOTE----------------------

This Surveillance shall not be performed in MODE 1, 2, 3, or 4.

Verify each battery charger supplies its 24 months associated battery at the voltage and current adequate to demonstrate battery charger capability requirements are met.

SR 3.8.4.3


NOTES---------------------

This Surveillance shall not be performed in MODE 1, 2, 3, or 4.

Verify battery capacity is adequate to supply, 24 months and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test or a modified performance discharge test.

(continued)

INDIAN POINT 3 3.8.4 - 2 Amendment 216

DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.4.4


NOTE----------------------

This Surveillance shall not be performed in MODE 1, 2, 3, or 4.

Verify battery capacity is 2 80% of the 60 months manufacturer's rating when subjected to a performance discharge test or a modified AND performance discharge test.

12 months when battery shows degradation or has reached 85%

of expected life with capacity

< 100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected life with capacity 2 100% of manufacturer's rating SR 3.8.4.5 Verify battery cells, cell plates, and racks 24 months show no visual indication of physical damage or abnormal deterioration.

INDIAN POINT 3 3.8.4 - 3 Amendment 216