ML031140083
| ML031140083 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 04/22/2003 |
| From: | Rossbach L NRC/NRR/DLPM/LPD3 |
| To: | Skolds J Exelon Generation Co |
| References | |
| TAC MB7523 | |
| Download: ML031140083 (1) | |
Text
SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:
THERMAL POWER shall be 5 25% RTP.
2.1.1.2 With the reactor steam dome pressure > 785 psig and core flow 2 10% rated core flow:
For Unit 2 be > 1.11, MCPR shall For Unit 3 be > 1.10, MCPR shall two recirculation loop operation, MCPR shall or for single recirculation loop operation, be 2 1.12.
two recirculation loop operation, MCPR shall or for single recirculation loop operation, be 2 1.11.
I 2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be S 1345 psig.
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.
Dresden 2 and 3 2.0-1 Amendment No. 199