Letter Sequence Approval |
---|
|
|
MONTHYEARML0311207052003-04-18018 April 2003 Review of 90-day Steam Generator Tube Inservice Inspection Report for a Refueling Outage in 2001 Project stage: Approval 2003-04-18
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22083A0032022-03-29029 March 2022 Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) 2024-01-08
[Table view] Category:Report
MONTHYEARRA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0080, Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube2023-04-0505 April 2023 Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube RA-22-0302, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2022-11-0101 November 2022 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) RA-22-0239, Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary)2022-08-0909 August 2022 Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary) RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0312, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2021-11-22022 November 2021 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.462019-05-30030 May 2019 Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) RA-17-0040, Providing Methodology Reports DPC-NE-1008-P, Revision 0, DPC-NF-2010, Revision 3, and DPC-NE-2011-P, Revision 2. (Non-Proprietary Versions)2017-08-15015 August 2017 Providing Methodology Reports DPC-NE-1008-P, Revision 0, DPC-NF-2010, Revision 3, and DPC-NE-2011-P, Revision 2. (Non-Proprietary Versions) ML16281A5102016-12-15015 December 2016 Staff Assessment of the Reactor Vessel Internals Aging Management Program Plans RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors ML16280A2002016-10-0505 October 2016 Response to Request for Additional Information Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RA-16-0024, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P2016-10-0303 October 2016 Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P RNP-RA/16-0073, Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits2016-09-14014 September 2016 Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-1742016-05-25025 May 2016 Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 RA-16-0023, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-1008-P2016-05-0404 May 2016 Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-1008-P ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report RA-15-0042, Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis.2015-11-19019 November 2015 Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis. RA-15-0047, Annual Report of Changes Pursuant to 10 CFR 50.462015-11-17017 November 2015 Annual Report of Changes Pursuant to 10 CFR 50.46 ML15280A1992015-10-19019 October 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)2015-08-19019 August 2015 Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) RNP-RA/15-0018, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel2015-02-26026 February 2015 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel RNP-RA/14-0037, Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System2014-04-0808 April 2014 Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System RNP-RA/14-0012, Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3....2014-03-12012 March 2014 Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3.... RNP-RA/14-0011, Revision to Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident2014-02-27027 February 2014 Revision to Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident ML13365A2912014-02-19019 February 2014 Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14027A0632014-01-24024 January 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for H. B. Robinson Steam Electric Plant, Unit 2, TAC No.: MF0720 ML13267A2122013-09-30030 September 2013 Enclosure 1, Transition Report - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition ML13270A1762013-09-24024 September 2013 Redacted - Office of Nuclear Reactor Regulation (NRR) Reactor Systems Branch (Srxb) Support of Region II Inspection of H. B. Robinson Treatment of Voids in Systems That Are Important to Safety RNP-RA/13-0079, Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter2013-08-21021 August 2013 Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter RNP-RA/13-0066, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication2013-06-24024 June 2013 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication RNP-RA/13-0037, Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 20122013-04-25025 April 2013 Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 2012 ML12331A1752012-11-26026 November 2012 Draft Bypass Fiber Quantity Test Plan ML12278A3992012-08-31031 August 2012 WCAP-17077-NP, Rev 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant ML1210707162012-05-17017 May 2012 Letter Report on the Evaluation of Cables from the HEAF Fire Event at the H.B. Robinson Steam Electric Plant ML12068A1332012-02-23023 February 2012 Calculation RNP-M/MECH-1815, Revision 1, Evaluation of Emergency Diesel Generator Starting Capability at 150 PSIG RNP-RA/11-0100, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System2011-11-23023 November 2011 Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System ML1124113592011-09-23023 September 2011 Final Precursor Analysis: Electrical Fault Causes Fire and Subsequent Reactor Trip with a Loss of Reactor Coolant Pump Seal Injection and Cooling ML1124113582011-09-23023 September 2011 Final Precursor Analysis: Concurrent Unavailabilities - EDG B Inoperable Due to Failed Output Breaker and EDG a Unavailable Due to Testing and Maintenance ML1128005282010-12-29029 December 2010 NRC 2011 Hb Robinson ML1019304172010-05-0606 May 2010 Tritium Database Report RNP-RA/09-0081, WCAP-17077-NP, Revision 0, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant.2009-07-31031 July 2009 WCAP-17077-NP, Revision 0, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant. RNP-RA/09-0054, Attachments VI & VII to Serial: RNP-RA/09-0054 - Request for Technical Specifications Change to Section 3.3.1 Reactor Protection System Instrumentation2009-06-19019 June 2009 Attachments VI & VII to Serial: RNP-RA/09-0054 - Request for Technical Specifications Change to Section 3.3.1 Reactor Protection System Instrumentation ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 RNP-RA/08-0026, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-03-0707 March 2008 Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors 2023-07-12
[Table view] Category:Technical
MONTHYEARRA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0080, Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube2023-04-0505 April 2023 Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube RA-22-0302, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2022-11-0101 November 2022 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) RA-22-0239, Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary)2022-08-0909 August 2022 Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary) RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-17-0040, Providing Methodology Reports DPC-NE-1008-P, Revision 0, DPC-NF-2010, Revision 3, and DPC-NE-2011-P, Revision 2. (Non-Proprietary Versions)2017-08-15015 August 2017 Providing Methodology Reports DPC-NE-1008-P, Revision 0, DPC-NF-2010, Revision 3, and DPC-NE-2011-P, Revision 2. (Non-Proprietary Versions) ML16280A2002016-10-0505 October 2016 Response to Request for Additional Information Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/16-0073, Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits2016-09-14014 September 2016 Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits RA-16-0023, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-1008-P2016-05-0404 May 2016 Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-1008-P RA-15-0042, Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis.2015-11-19019 November 2015 Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis. RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. RNP-RA/14-0011, Revision to Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident2014-02-27027 February 2014 Revision to Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident ML13365A2912014-02-19019 February 2014 Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14027A0632014-01-24024 January 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for H. B. Robinson Steam Electric Plant, Unit 2, TAC No.: MF0720 ML13267A2122013-09-30030 September 2013 Enclosure 1, Transition Report - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition ML13270A1762013-09-24024 September 2013 Redacted - Office of Nuclear Reactor Regulation (NRR) Reactor Systems Branch (Srxb) Support of Region II Inspection of H. B. Robinson Treatment of Voids in Systems That Are Important to Safety ML12331A1752012-11-26026 November 2012 Draft Bypass Fiber Quantity Test Plan ML12278A3992012-08-31031 August 2012 WCAP-17077-NP, Rev 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant ML1210707162012-05-17017 May 2012 Letter Report on the Evaluation of Cables from the HEAF Fire Event at the H.B. Robinson Steam Electric Plant ML12068A1332012-02-23023 February 2012 Calculation RNP-M/MECH-1815, Revision 1, Evaluation of Emergency Diesel Generator Starting Capability at 150 PSIG RNP-RA/09-0081, WCAP-17077-NP, Revision 0, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant.2009-07-31031 July 2009 WCAP-17077-NP, Revision 0, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant. RNP-RA/09-0054, Attachments VI & VII to Serial: RNP-RA/09-0054 - Request for Technical Specifications Change to Section 3.3.1 Reactor Protection System Instrumentation2009-06-19019 June 2009 Attachments VI & VII to Serial: RNP-RA/09-0054 - Request for Technical Specifications Change to Section 3.3.1 Reactor Protection System Instrumentation ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 RNP-RA/06-0081, Steam Generator Alternate Repair Criteria for Tube Portion within the Tubesheet, WCAP-16627-NP2006-08-31031 August 2006 Steam Generator Alternate Repair Criteria for Tube Portion within the Tubesheet, WCAP-16627-NP RNP-RA/06-0027, ANP-2512(NP), Loss of Forced Reactor Coolant Flow Analysis.2006-03-31031 March 2006 ANP-2512(NP), Loss of Forced Reactor Coolant Flow Analysis. ML0507004082004-02-20020 February 2004 EMF-3030(NP), Revision 0, Robinson Nuclear Plant, Realistic Large Break LOCA Analysis, February 2004, Non-Proprietary Version RNP-RA/03-0075, Technical Basis for RPV Head CRDM Nozzle Inspection Interval H.B. Robinson Steam Electric Plant, Unit No. 2, References 9-1 Through E-62003-07-31031 July 2003 Technical Basis for RPV Head CRDM Nozzle Inspection Interval H.B. Robinson Steam Electric Plant, Unit No. 2, References 9-1 Through E-6 RNP-RA/03-0031, Response to Request for Additional Information Re Application for Renewal of Operating License, Attachment III, Pages 356 - 5042003-04-28028 April 2003 Response to Request for Additional Information Re Application for Renewal of Operating License, Attachment III, Pages 356 - 504 ML0311207052003-04-18018 April 2003 Review of 90-day Steam Generator Tube Inservice Inspection Report for a Refueling Outage in 2001 ML0305202692003-02-15015 February 2003 Follow-up Report, Reference Event #39516 RNP-RA/03-0012, Request for Relief Pertaining to Examination Coverage Less than Essentially 100 Percent2003-02-11011 February 2003 Request for Relief Pertaining to Examination Coverage Less than Essentially 100 Percent RNP-RA/02-0172, Steam Generator Tube Plugging During Refueling Outage 212002-11-11011 November 2002 Steam Generator Tube Plugging During Refueling Outage 21 RNP-RA/02-0164, Part 17 of 17, CD-ROM Providing the Review Tool Supporting the Application for Renewal of Operating License2002-11-0606 November 2002 Part 17 of 17, CD-ROM Providing the Review Tool Supporting the Application for Renewal of Operating License ML0230402682002-09-19019 September 2002 Part 4 of 4 - Westinghouse Technology Manual, Course Outline for R-104P and Course Manual ML0221103432002-01-31031 January 2002 Caldon, Inc Engineering Report: ER-267N, Bounding Uncertainty Analysis for Thermal Power Determination at CP&L Robinson Nuclear Power Station Using the LEFM Check Plus System ML18288A3691990-10-31031 October 1990 ANF-88-054(NP)(A), PDC-3: Advanced Nuclear Fuels Corp Power Distribution Control for PWRs & Application of PDC-3 to Hb Robinson Unit 2. NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences 2023-07-12
[Table view] |
Text
April 18, 2003 Mr. J. W. Moyer, Vice President Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550
SUBJECT:
REVIEW OF 90-DAY STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT FOR A REFUELING OUTAGE IN 2001 AT H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (TAC NO. MB3239)
Dear Mr. Moyer:
By letter dated August 10, 2001, as supplemented by letter dated July 3, 2002, Carolina Power & Light Company (CP&L) submitted its 90-day inservice inspection summary report regarding the steam generator tube inspections performed at H. B. Robinson Steam Electric Plant, Unit No. 2 (HBRSEP2) during refueling outage 20.
As discussed in the enclosed evaluation, the NRC staff concluded that you provided the information required by the technical specifications for HBRSEP2 and that no additional followup is required at this time. If you have any questions, please contact me at (301) 415-3025.
Sincerely,
/RA/
Chandu P. Patel, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-261
Enclosure:
Evaluation cc w/encl: See next page
April 18, 2003 Mr. J. W. Moyer, Vice President Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550
SUBJECT:
REVIEW OF 90-DAY STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT FOR A REFUELING OUTAGE IN 2001 AT H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (TAC NO. MB3239)
Dear Mr. Moyer:
By letter dated August 10, 2001, as supplemented by letter dated July 3, 2002, Carolina Power & Light Company (CP&L) submitted its 90-day inservice inspection summary report regarding the steam generator tube inspections performed at H. B. Robinson Steam Electric Plant, Unit No. 2 (HBRSEP2) during refueling outage 20.
As discussed in the enclosed evaluation, the NRC staff concluded that you provided the information required by the technical specifications for HBRSEP2 and that no additional followup is required at this time. If you have any questions, please contact me at (301) 415-3025.
Sincerely,
/RA/
Chandu P. Patel, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-261
Enclosure:
Evaluation cc w/encl: See next page DISTRIBUTION:
PUBLIC OGC PDII-2 Reading ACRS AHowe PFredrickson, RII CPatel KKarwoski EDunnington LLund Adams:ML031120705 OFFICE PM:/PDII/S2 LA:/PDII/S2 SC:PDII/S2 NAME CPatel EDunnington AHowe DATE 4/17/2003 4/18/2003 4/17/2003 OFFICIAL RECORD COPY
NUCLEAR REGULATORY COMMISSION STAFFS REVIEW OF THE STEAM GENERATOR 90-DAY REPORT CAROLINA POWER & LIGHT COMPANY H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 By letter dated August 10, 2001, Carolina Power & Light Company (CP&L, the licensee) submitted its 90-day inservice inspection summary report regarding the steam generator tube inspections performed at H. B. Robinson Steam Electric Plant, Unit No. 2 (HBRSEP2) during refueling outage (RFO) 20.
In reviewing this report and previous 90-day reports submitted on January 20, 2000 (RFO 19),
and July 9, 1998 (RFO 18), and monthly operating reports dated May 14, 1998 (RFO 18),
November 15, 1999 (RFO 19), and June 12, 2001 (RFO 20), the NRC developed a set of questions. Responses to these questions were submitted to the NRC by the licensee on July 3, 2002. A summary of the NRCs evaluation of the RFO 20 inspection results is provided below.
HBRSEP2 has three Westinghouse Model 44F steam generators. These steam generators were placed in service in 1984 and have thermally treated Alloy 600 tubes. During RFO 20 in 2001, approximately 50 percent of the tubes in steam generators B and C were inspected full-length with a bobbin coil. In addition to the bobbin coil inspections, a rotating probe equipped with a plus point coil was used to inspect 20 percent of the hot-leg manufacturing buff marks, 20 percent of the dents, the U-bend region of 50 percent of the row 1 and 2 tubes, and the hot-leg expansion transition region of 50 percent of the tubes in steam generators B and C.
There was no primary-to-secondary leakage at the time RFO 20 was entered.
As a result of these inspections, four tubes were plugged. One of these tubes was plugged because a dent, present since steam generator fabrication, prevented an examination by a qualified bobbin probe, and the use of a rotating probe resulted in poor quality data. A second tube was plugged for a 43-percent through-wall wear indication at the hot-leg flow distribution baffle. The wear was attributed to a transient loose part. This tube is located in the periphery of the tube bundle, and no indication was present during the previous inspection of this tube in 1998. A third tube was plugged for wear near the top of the hot-leg tubesheet. This tube also had a wear indication (approximately 32-percent through-wall), which was attributed to a transient loose part. Ultrasonic testing performed on this tube led the licensee to attribute the indication to wear. This tube is not in the periphery of the tube bundle. A fourth tube was plugged for an obstruction in the tube above the sixth hot-leg tube support plate. This tube would not permit the passage of a 0.650-inch diameter rotating probe, but did permit passage Enclosure
of a 3/8-inch poly shaft. The obstruction was attributed to foreign material lodged in the tube, although visual examinations were not performed to confirm this. The obstruction is not located near a tube support (i.e., it is mid-span). This tube was previously examined during RFOs 15 and 16 with no obstruction noted (i.e., a 0.720-inch probe passed through the tube).
Secondary side visual inspections have been performed at HBRSEP2. This type of inspection involves inspection of the tube support plates up through the flow slots to the bottom of the top tube support plate. No upper bundle fouling or corrosion product build-up in the tube support plate areas was identified. Only minor deposition in the land area of the quatrefoil support with no bridging was observed during these examinations.
Based on our review of the information provided by the licensee, the NRC staff concludes that the information was submitted as required by HBRSEP2 technical specifications and that no additional follow-up is required at this time; however, in future evaluations the licensee should consider confirming the cause for any restrictions found in tubes. The licensees explanation for the tube found with a restriction during this outage is plausible, but not definitive. Additional investigation including visual examination may provide insights on the cause of a restriction and may rule out an active degradation mechanism (i.e., denting that could lead to cracking).
Principal Contributor: K. Karwoski, EMCB/DE Date: April 18, 2003
Mr. J. W. Moyer H. B. Robinson Steam Electric Plant, Carolina Power & Light Company Unit No. 2 cc:
Steven R. Carr Mr. B. L. Fletcher III Associate General Counsel - Legal Manager - Support Services - Nuclear Department Carolina Power & Light Company Progress Energy Service Company, LLC H. B. Robinson Steam Electric Plant, Post Office Box 1551 Unit No. 2 Raleigh, North Carolina 27602-1551 Ms. Margaret A. Force 3581 West Entrance Road Assistant Attorney General Hartsville, South Carolina 29550-0790 State of North Carolina Post Office Box 629 Mr. C. T. Baucom Raleigh, North Carolina 27602 Supervisor, Licensing/Regulatory Programs Carolina Power & Light Company U. S. Nuclear Regulatory Commission H. B. Robinson Steam Electric Plant, Resident Inspectors Office Unit No. 2 H. B. Robinson Steam Electric Plant 3581 West Entrance Road 2112 Old Camden Road Hartsville, South Carolina 29550 Hartsville, South Carolina 29550 Ms. Beverly Hall, Section Chief Mr. T. P. Cleary N.C. Department of Environment Plant General Manager and Natural Resources Carolina Power & Light Company Division of Radiation Protection H. B. Robinson Steam Electric Plant, 3825 Barrett Dr.
Unit No. 2 Raleigh, North Carolina 27609-7721 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Robert P. Gruber Executive Director Mr. Chris L. Burton Public Staff - NCUC Director of Site Operations 4326 Mail Service Center Carolina Power & Light Company Raleigh, North Carolina 27699-4326 H. B. Robinson Steam Electric Plant, Unit No. 2 Mr. Virgil R. Autry, Director 3581 West Entrance Road South Carolina Department of Health Hartsville, South Carolina 29550 Bureau of Land & Waste Management 2600 Bull Street Public Service Commission Columbia, South Carolina 29201 State of South Carolina Post Office Drawer 11649 Mr. James W. Holt Columbia, South Carolina 29211 Manager Performance Evaluation and Regulatory Affairs PEB 7 Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551
Mr. John H. ONeill, Jr.
Shaw, Pittman, Potts, & Trowbridge 2300 N Street NW.
Washington, DC 20037-1128