ML031120394

From kanterella
Jump to navigation Jump to search
Units 1 & 2 - Emergency Plan Implementing Procedure Revision
ML031120394
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/15/2003
From: Salas P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML031120394 (17)


Text

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 April 15, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority 50-328 SEQUOYAH NUCLEAR PLANT - UNITS 1 AND 2 -- EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISION In accordance with the requirements of 10 CFR 50, Appendix E, Section V, the enclosure provides the following EPIP:

EPIP Revision Title EPIP-5 30 General Emergency This letter is being sent in accordance with NRC RIS 2001-05.

If you have any questions concerning this matter, please telephone me at (423) 843-7170 or J. D. Smith at (423) 843-6672.

Licensing and Industry Affairs Manager Enclosure cc (Enclosure):

Mr. Mike L. Marshall, Jr., Senior Project Manager U.S. Nuclear Regulatory Commission MS-0-8G9A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 A00 Prnted on recycledpaper

TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-5 GENERAL EMERGENCY REVISION 30 PREPARED BY: BILL PEGGRAM RESPONSIBLE ORGANIZATION: - EMERGENCY PREPAREDNESS APPROVED BY: RANDY FORD EFFECTIVE DATE: APRIL 1, 2003 LEVEL OF USE: REFERENCE USE QUALITY-RELATED

SEQUOYAH GENERAL EMERGENCY I EPIP-5 Revision History 4Rev Date Reason for Revision 27 03/30/2001 Revised references to EPIP-14 for Dose Assessment to the new EPIP-13 for Dose Assessment. Added EPIP-1 3 to references. Reformatted substantially for clarity. Added new Protective Action Recommendation Logic Diagram and removed the old one. Updated Notification and Follow-Up forms to Pentagen standard content.

28 07/30/2002 Substantial format modification for standardization with BFNIWBN was implemented in this revision. Reformatted and repaginated as necessary.

Reordered actions to be consistent with EPIPs 2, 3, 4. Changed reference of PHYSI-32 to SSI-1. Added Section 5.0, Illustrations and Appendices Section to the body of the procedure. Added caution concerning conducting assembly and accountability if it will present a danger to employees. Clarified use of 5- and 9-telephone prefixes. Added what information is to be provided by the Shift Manager to Chemistry when requesting Dose Assessment: 1 .Type of Event, 2.

Release Path, 3. Expected Duration. Clarified how to check ERO pager response. EPIP-5 was revised to implement actions to support the NRC Security Order including adding 'Two Person Line-of-Sight" rule when deemed necessary by Security. Clarified what MET Data elevation (46 meter) is to be included on the initial notification form and the followup form for General Emergency. At request of State, changed order of notification in cases where ODS cannot be reached (Counties first). Corrected telephone number for CECC.

29 08/26/2002 Implement ability to stage TSC/OSC personnel near-site when it is unsafe to immediately enter the site. Added Step in 3.1 when EPS had already been activated. Condensed assembly and accountability steps in Sections 3.1 and 3.2.

Added 'TVA" to step 9 in Sect. 3. Corrected title of CECC EPIP-9 in Sections 3.1 and 3.2. This is a intent revision.

30 04/01/2003 General Revision to restructure EPIP for better flow. Moved ODS notification earlier in procedures. Added evacuation sectors to Initial Notification Appendix and to consider issuance of KI in accordance with the State Plan in the PAR.

Intent Change.

FORWARD COMPLETED PROCEDURE TO PAGE 2of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER

. SEQUOYAH I GENERAL EMERGENCY EPIP-5 Table of Contents 1.0 PURPOSE ................................................... 4

2.0 REFERENCES

................................................... 4 3.0 INSTRUCTIONS ......................................... 4 3.1 Activation of the Emergency Response Facilities ....................................... 4 3.2 General Emergency Declaration by the TSC ........................................ . 7 3.3 Monitor Conditions ...................................... 8 3.4 Termination of the Event ...................................... 10 4.0 RECORDS RETENTION ...................................... 11 4.1 Records of Classified Emergencies ...................................... 11 4.2 Drill and Exercise Records ...................................... 11 5.0 ILLUSTRATIONS AND APPENDICES ...................................... 12 5.1 Appendix A, Notifications and Announcements ...................................... 14 5.2 Appendix B, Protective Action Recommendation Logic Diagram ...................................... 14 5.3 Appendix C, TVA Initial Notification of General Emergency ...................................... 15 5.4 Appendix D, General Emergency Follow-up Information ...................................... 16 FORWARD COMPLETED PROCEDURE TO PAGE 3 of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER

0 ISEQUOYAH I GENERAL EMERGENCY I EPIP-5 I 1.0 PURPOSE

.1 To provide a method for timely notifications of appropriate individuals or organizations when the Shift Manager (SM)/Site Emergency Director (SED) has determined by EPIP-1 that events have occurred that are classified as a GENERAL EMERGENCY (GE).

1.2 To provide the SED/SM a method for periodic reanalysis of current conditions to determine whether the GENERAL EMERGENCY should be terminated or continued.

2.0 REFERENCES

2.1 Interface Documents

[1] SPP-3.5 "Regulatory Reporting Requirements"

[2] EPIP-6, "Activation and Operation of the Technical Support Center"

[3] EPIP-7, "Activation and Operation of the Operations Support Center"

[4] EPIP-8, "Personnel Accountability and Evacuation"

[5] EPIP-10, 'Medical Emergency Response"

[6] EPIP-13, 'Dose Assessment"

[7] EPIP-14, "Radiological Control Response"

[8] EPIP-16, "Termination and Recovery'

[9] CECC EPIP-9, "Emergency Environmental Radiological Monitoring Procedures"

[10] SSI-1, "Security Instructions For Members Of The Security Force" 3.0 INSTRUCTIONS NOTE: IF there are personnel njur es, THEN IMPLEMENT EPI P1, "Medical Emergency Response" in parallel with tsrod X 1

NOTE: .. F there are immediate hazards to pn pelrasonel sideri . tIy

-;implementing EPIP-'.=Personnel Accountability and EvacuatOn" i rl I procedure .. .... ..........

3.1 ACTIVATION OF THE EMERGENCY RESPONSE FACILTIES Upon classifying events as a GENERAL EMERGENCY," the SM/SED shall:

[1] IF TSC is OPERATIONAL, (SED transferred to TSC), THEN GO TO Section 3.2. El FORWARD COMPLETED PROCEDURE TO PAGE 4 of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER

l SEQUOYAH I GENERAL EMERGENCY l EPIP-5 3.1 ACTIVATION OF THE EMERGENCY RESPONSE FACILTIES (Continued)

[2] ACTIVATE Emergency Paging System (EPS) as follows.

[a] IF EPS has already been activated, THEN GO TO Step 3. El

[b] IF ongoing onsite Security events may present risk to the emergency responders, THEN CONSULT with Security to determine if site access is dangerous to the life and health of emergency responders. El

[c] IF ongoing events makes site access dangerous to the life and health of emergency responders, THEN SELECT STAGING AREA button on the EPS terminal INSTEAD of the EMERGENCY button. El

[d] ACTIVATE EPS using touch screen terminal. IF EPS fails to activate, THEN continue with step 3. E

[3] COMPLETE Appendix C (TVA Initial Notification for General Emergency). El EVALUATE Protective Actions using Appendix B.

NOTE:.. DS shold'be notified within 5 mtnutes fter declaration f the evet.

[4] NOTIFY ODS.

Inital Time ODS: Ringdown Line or 5 -751-1700 or 5 -751-2495 or 9-785-1700

[a] IF EPS failed to activate from SQN, THEN DIRECT ODS to activate SQN EPS. IF ODS is also unable to activate EPS, THEN continue with step [4] [b]. E1

[b] READ completed Appendix C to ODS. [1

[c] FAX completed Appendix C to ODS.

1 5-751-8620 (Fax)

[d] MONITOR for confirmation call from ODS that State/Local notifications complete: RECORD time State notified.

Notification Time FORWARD COMPLETED PROCEDURE TO PAGE 5 of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER

I lSEQUOYAH I GENERAL EMERGENCY I EPIP-5 I 3.1 ACTIVATION OF THE EMERGENCY RESPONSE FACILTIES (Continued)

[5] IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN (a] CONTACT Hamilton County Emergency Management Agency (EMA) AND READ completed Appendix C.

Initial Time.

l 9-209-6900 or 9-622-7777 or 9-622-0022 l

[b] CONTACT Bradley County EMA AND READ completed Appendix C.

Initial Time.

9-476-0606 or 9-476-7511 (c] NOTIFY Tennessee Emergency Management Agency (TEMA) and READ completed Appendix C.

Initial Time.

l 9-1-800-262-3300 or 9-1-615-741-0001 or 888-616-8091 (satellite phone)

[d] FAX completed Appendix C to TEMA. [l l 9-1-615-242-9635 (Fax) l

[6] MONITOR Emergency Response Organization (ERO) Responses by reviewing touch screen monitor, obtaining copies of the printed report available in the TSC and OSC, or reviewing Call List progress.

(Delegate this task to Operations Clerk, MSS, or other available personnel.)

[a] IF any ERO positions are not responding, THEN CALL personnel to staff TSC/OSC positions (Use REP Duty Roster and Call List). El

[7] NOTIFY plant staff using Appendix A. (Delegate as needed) El

[8] GO TO Section 3.3 FORWARD COMPLETED PROCEDURE TO PAGE 6 of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER

.ISEQUOYAH GENERAL EMERGENCY EPIP-5 3.2 GENERAL EMERGENCY DECLARATION BY TSC Upon classifying events as a GENERAL EMERGENCY," the SED shall:

CEC Director sul enin minute's after declaration of NOE  ;-the event....

[1] RECORD Time of Declaration

[2] RECORD EAL(s)

[3] CALL CECC Director and inform of escalation, time of declaration, EAL(s) declared, and description of events.

Initial Time l RingdownLine or 5-751-1614 or 5-751-1680

[4] IF CECC Director CANNOT be contacted within 10 minutes of the declaration, THEN

[a] COMPLETE Appendix C (TVA Initial Notification for General Emergency) using Appendix B to evaluate ok Protective Actions.

[b] NOTIFY Hamilton County EMA AND READ Appendix C

- Initial Time 9-209-6900 or 9-622-7777 or 9-622-0022

[c] NOTIFY Bradley County EMA AND READ Appendix C.

Initial Time 9-476-0606 or 9-476-7511

[d] NOTIFY TEMA AND READ completed Appendix C.

Initial Time 9-1-800-262-3300 or 9-1-615-741-0001 or 888-616-8091 (satellite phone)

[e] FAX completed Appendix C to TEMA. 51 9-1-615-242-9635 (Fax)

FORWARD COMPLETED PROCEDURE TO PAGE 7 of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER

lISEQUOYAH I GENERAL EMERGENCY I EPIP-5 l 3.3 MONITOR CONDITIONS

[1] ANNOUNCE to plant personnel:

[a] 'ATTENTION PLANT PERSONNEL. ATTENTION PLANT PERSONNEL. A GENERAL EMERGENCY HAS BEEN DECLARED BASED ON ( Describe the condition ), AFFECTING UNIT(s) Ol."

[b] REPEAT Announcement. l CAUTION: Accountability h d NOT beinitated at this time IF Assembly will presen't iba dangertomplo s F-o exEI con"iditio exCss or is imminenit (sucha,6s a Tornd.

n elSecrityrisk onton exiss Consult wit cer uri

.-.-f -.-. B -~~~~~~~~~. .

5............ ....... .:.

5.---

.9 f.:

5'I51 12] IF personnel accountability has not been previously initiated, THEN ACTIVATE assembly and accountability by using EPIP-8, Appendix C (may be delegated). [3 13] MONITOR radiation monitors. WHEN indication exists of an unplanned radiological release, THEN PERFORM Dose Assessment. El

[a] IF the CECC has not assumed Dose Assessment responsibility, THEN NOTIFY Chemistry to perform a dose assessment using EPIP-13, "Dose Assessment" AND PROVIDE the following information:

1. Type Of Event (SGTRIL, LOCA, WGDT, Cntmt Bypass)
2. Release Path (SG/PORV, Aux, ShId, Turb, Serv, Cond)
3. Expected Duration (If unknown assume 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> duration) El l 7285 (Lab) or 6348 (Lab) or 20126 (Pager) I

[b] IF PAR responsibility has NOT been transferred to the CECC Director, THEN REFER to Appendix B (Protective Action Recommendation Logic Diagram). El

[c] IF changes to Protective Action Recommendations are necessary, THEN complete Appendix D. Cl FORWARD COMPLETED PROCEDURE TO PAGE 8 of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER

l SEQUOYAH I GENERAL EMERGENCY I EPIP-5 I 3.3 MONITOR CONDITIONS (Continued)

[4] MONITOR plant conditions:

[a] EVALUATE conditions using EPIP-1:

[1] IF additional conditions satisfy criteria of other GENERAL EMERGENCY(s) THEN complete Appendix D. El

[2] IF conditions warrant a need for follow-up information, THEN complete Appendix D. El

[b] IF Appendix D completed, THEN

[1] REPORT to CECC for State notification:

Initial Time CECC Director: Ringdown Line or 5 -751-1614 or 5 -751-1680 OR ODS: Ringdown Line or 5-751-1700 or 5-751-2495 or 9-785-1700

[2] FAX completed Appendix D to CECC. El CECC: 5-751-1682 (Fax) OR ODS: 5-751-8620 (Fax)

I

[3] IF neither the CECC or ODS can be reached, THEN

[a] NOTIFY TEMA AND READ completed Appendix D.

Initial Time 9-1-800-262-3301 or 9-1-615-741-0001 or 888-616-8091 (satellite phone)

[b] FAX completed Appendix D to TEMA. El l 9-1-615-242-9635 (Fax) I FORWARD COMPLETED PROCEDURE TO PAGE 9of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER

-ISEQUOYAH GENERAL EMERGENCY EPIP-5 3.3 MONITOR CONDITIONS (Continued)

K) NOTE: NRC notification s'hould be made ,as soon as practicable, but within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of "GENERAL EMERGENCY" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NR Operation Ctr.

[5] NOTIFY NRC of plan activation via ENS phone Initial Time 9-1-(301) 816-5100 (Main) 9-1-(301) 951-0550 (Backup) 9-1-(301) 816-5151 (Fax) 3.4 TERMINATION OF THE EVENT (1] IF the situation no longer exists, THEN

[a] TERMINATE emergency per EPIP-16, 'Termination and Recovery," El

[b] COMPLETE Appendix D including Time and Date Event Terminated. E1

[c] FAX completed Appendix D to CECC Director.

ODS: 5-751-8620 (Fax) OR CECC: 5-751-1682 (Fax)

[2] COLLECT documentation and FORWARD to Emergency Preparedness. El END OF SECTION I FORWARD COMPLETED PROCEDURE TO PAGE 10 of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER

l SEQUOYAH I GENERAL EMERGENCY I EPIP-5 4.0 RECORD RETENTION

-4.1 Records of Classified Emergencies The materials generated in support of key actions during an actual emergency classified as NOUE or higher are considered Lifetime retention Non-QA records. Materials shall be forwarded to the EP Manager who shall submit any records deemed necessary to demonstrate performance to the Corporate EP Manager for storage.

4.2 Drill and Exercise Records The materials deemed necessary to demonstrate performance of key actions during drills are considered Non-QA records. These records shall be forwarded to the EP Manager who shall retain records deemed necessary to demonstrate six-year plan performance for six years. The EP Manager shall retain other records in this category for three years.

5.0 ILLUSTRATIONS AND APPENDICES 5.1 Appendix A - Notifications and Announcements K> Appendix A provides guidance for security threats, and for prompt notification of the NRC Resident and plant personnel.

5.2 Appendix B - Protective Action Recommendation Logic Diagram Appendix B, Protective Action Recommendation Logic Diagram, is used to determine the Protective Action Recommendation which is made to the State and is part of the initial notification made to the State. Protective Action Recommendations are the responsibility of the CECC Director after assuming the responsibility from the SED.

5.3 Appendix C - TVA Initial Notification of General Emergency Appendix C, TVA Initial Notification of General Emergency, is the form used to initially notify the Operations Duty Specialist who notifies the Tennessee Emergency Management Agency.

5.4 Appendix D - General Emergency Follow-up Information Appendix D, General Emergency Follow-up Information is the form used to provide additional concerning other General Emergencies or other information concerning additional conditions to the ODS for State notification and event termination.

FORWARD COMPLETED PROCEDURE TO PAGE 11 of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER

I

.SEQUOYAH GENERAL EMERGENCY I EPIP-5 l Appendix A NOTIFICATIONS AND ANNOUNCEMENTS (Page 1 of 2)

[1] IF there is a security threat, THEN

[a] NOTIFY Security Shift Supervisor to implement SSI-1, "Security Instructions For Members Of The Security Force".

Initial Time 1 6144 or 6568

[b] DETERMINE if Security recommends implementing the "Two Person Line of Sight" Rule. El

[c] IF Nuclear Security recommends establishing the "Two Person Line of Sight" Rule, THEN INFORM the SM/SED. (uTwo Person Line of Sight" requires use of EPIP-8).

Initial Time

[2] NOTIFY RADCON Shift Supervisor:

[a] STATE: 'A GENERAL EMERGENCY HAS BEEN DECLARED, BASED UPON (Describe the conditions?,

AFFECTING UNIT(s) _."

Initial Time

[b] DIRECT RADCON to implement EPIP-14, "Radiological Control Response." El

[c] DIRECT RADCON to implement CECC EPIP-9,

'Emergency Environmental Radiological Monitoring Procedures" which includes activation of the radiological monitoring van. El

[3] NOTIFY Chemistry Shift Supervisor:

[a] STATE: "A GENERAL EMERGENCY HAS BEEN DECLARED, BASED UPON (Describe the conditions),

AFFECTING UNIT(s)_."

Initial Time l 7285 (Lab) or 6348 (Lab) or 20126 (Pager) l

[b] DIRECT Chemistry to implement EPIP-14, "Radiological Control Response.' El FORWARD COMPLETED PROCEDURE TO PAGE 12 of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER

lISEQUOYAH I GENERAL EMERGENCY I EPIP-5 Appendix A NOTIFICATIONS AND ANNOUNCEMENTS (Page 2 of 2)

[4] NOTIFY the "On Call" NRC Resident AND PROVIDE GE Information.

Initial Time

[5] NOTIFY Plant Management in accordance with SPP-3.5 AND PROVIDE GE Information.

Initial Time

[6] NOTIFY the SMISED that notifications are complete.

Initial Time FORWARD COMPLETED PROCEDURE TO PAGE 13 of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER

I

'ISEQUOYAH I GENERAL EMERGENCY I EPIP-5 Appendix B PROTECTIVE ACTION RECOMMENDATION LOGIC DIAGRAM General Emergency CONTINUE ASSESSMENT V Declared

  • Modify protective actions based on available plant and field

.4 monitoring information.

  • Locate and evaluate localized hot spots.

A or beyond 5 miles is the Projected NO or Measured Dose Greater than PAG Table 1 Limits YES

. ,F JL RECOMMENDATION 1 RECOMMENDATION 2 EVACUATE 2 miles radius EVACUATE 2 mile radius and 10 miles downwind and 5 miles downwind AND AND J SHELTER remainder of SHELTER remainder of 10 mile EPZ 10 mile EPZ I

Table I Radioactivity Release Dose Note: Unknown conditions are assumed less than listed conditions TYPE Protective Action Guide (PAG) Limits Measured 3.9E-6 microCurie/cc Iodine 131 1 Rem/hr External Dose Projected 1 Rem TEDE

_ 5 Rem Thyroid CDE FORWARD COMPLETED PROCEDURE TO PAGE 14 of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER

f l

'lSEQUOYAH GENERAL EMERGENCY I 1I EPIP-5 Appendix C TVA INITIAL NOTIFICATION OF GENERAL EMERGENCY

1. Fl This is a Drill El This is an Actual Event - Repeat - This is an Actual Event
2. This is , Sequoyah has declared a GENERALEMERGENCY affecting: El Unit I E1 Unit 2 El Both Unit 1 and Unit 2
3. EAL Designator(s):
4. Brief Description of the Event:
5. Radiological Conditions: (Check one under both Airborne and Liquid column.)

Airborne Releases Offsite Liquid Releases Offsite Cl Minor releases within federally approved limits1 El Minor releases within federally approved limits' El Releases above federally approved limits' El Releases above federally approved limits' E Release information not known El Release information not known

("Tech Specs) ('tTech Specs)

6. Event Declared: Time: Date:
7. The Meteorological Conditions are: (Use 46 meter data from the Met Tower)

Wind Direction is FROM: degrees Wind Speed: m.p.h

8. Provide Protective Action Recommendation: (Check either 1 or 2. and mark wind direction.)

E] Recommendation I _1 Recommendation 2

. EVACUATE LISTED SECTORS (2 mile Radius . EVACUATE LISTED SECTORS (2 mile and 10 miles downwind) Radius and 5 mile downwind)

  • SHELTER all other non-listed sectors. WIND FROM . SHELTER all other non-listed sectors

. Consider issuance of POTASSIUM IODIDE in DIRECTION . Consider issuance of POTASSIUM accordance with the State Plan (item 7) IODIDE in accordance with the State Plan A-1, B-1, C-1, D-1, C-2, -6, -7. -8, D-2, -3, -5, -6 12 -49 _ A-1, B-1, C-1, D-1, C-2, D-2 A-1, B-1, C-1, D-1, D-2,-3,-4,-5,-6 50 - 70 _ A-1, B-1, C-1, D-1, D-2 A-1, B-1, C-1, D-1, A-3,-4, D-2,-3,-4,-5 _ 71-112 - A-1, B-1, C-1, D-1, A-3, D-2 A-1, B-1, C-1, D-1, A-2,-3,-4,-5,-6, D-4 113 - 146 _ A-1, B-1, C-1, D-11, A-2, A-3, A-1, B-1, C-1, D-1, A-2, -3, -4, -5,-6, B-2 147 - 173 _ A-1, B-1, C-1, D-1, A-2, A-3, B-2 A-1, B-1, C-1, D-1, A-2,-5,-6, B-2,-3,-4 _ 174 - 214 _ A-1, B-1, C-1, D-1, A-2, B-2, A-1, B-1, C-1, D-1, B-2,-3,-4,-5,-6,-7,-8 _ 215 - 258 _ A-1, B-1, C-1, D-1, B-2, B-5, A-1, B-1, C-1, D-1, B-2,-3,-5,-6,-7,-8, C-2,-3, C-4,-5,-6 259 - 331 _ A-1, B-1, C-1, D-1, B-2, B-5, C-2 A-1, B-1, C-1, D-1. B-5, C-2,-3,-4,-5,-6,-7,-8 332 - 11 _ A-1, B-1, C-1, D-1, B-5, C-2

9. Please repeat back the information you have received to ensure accuracy.
10. Time and Date this information was provided I Action: When completed, FAX this information.

FORWARD COMPLETED PROCEDURE TO PAGE 15 of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER

or l SEQUOYAH GENERAL EMERGENCY I EPIP-5 Appendix D GENERAL EMERGENCY FOLLOW-UP INFORMATION

1. al THIS IS A REAL EVENT El THIS IS A DRILL
2. There has been a GENERAL EMERGENCY declared at Sequoyah affecting:

al Unit I El Unit 2 El Both Unit 1 and Unit 2

3. Reactor Status: Unit 1: El Shut Down, El At Power El Refueling El N/A Unit 2: El Shut Down El At Power El Refueling El N/A
4. Additional EAL Designators
5. Significant Changes in Plant Conditions:
6. Significant Changes in Radiological Conditions:
7. Offsite Protective Action Recommendation: (CECC to provided detailed PAR Sector Recommendations)

El Recommendation 1 -

Evacuate 2 mile radius and 10 miles downwind and shelter remainder of the 10 mile EPZ El Recommendation 2 -

Evacuate 2 mile radius and 5 miles downwind and shelter remainder of the 10 mile EPZ

8. Onsite Protective Actions: Assembly and Accountability El No E Initiated El Completed Site Evacuation El No El Initiated El Completed
9. The Meteorological Conditions are: Wind Speed: m.p.h.

(Use 46 meter data on the Met Tower) Wind Direction is from: _ _-degrees

10. Event Terminated: Date/Time
11. Please repeat the information you have received to ensure accuracy.
12. FAX to ODS at 5-751-8620 or CECC Director at 5-751-1682 after completing the notification.

Completed by: Date/Time FORWARD COMPLETED PROCEDURE TO PAGE 16 of 16 REVISION 30 EMERGENCY PREPAREDNESS MANAGER