Tech Spec Pages for Amendments 165 and 128 Relocation of Emergency Diesel Generator Maintenance Inspection Requirements
ML031120104
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/18/2003
From:
NRC/NRR/DLPM/LPD1
To:
References
TAC MB4847, TAC MB4848
Download: ML031120104 (2)


Text

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

b. By removing accumulated water:
1) From the day tank at least once per 31 days and after each occa-sion when the diesel is operated for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and
2) From the storage tank at least once per 31 days.
c. By sampling new fuel oil in accordance with ASTM D4057-81 prior to addition to the storage tanks and:
1) By verifying in accordance with the tests specified in ASTM D975-81 prior to addition to the storage tanks that the sample has:

a)

An API Gravity of within 0.3 degrees at 60'F or a specific gravity of within 0.0016 at 60/60'F, when compared to the supplier's certificate or an absolute specific gravity at 60/60'F of greater than or equal to 0.83 but less than or equal to 0.89 or an API gravity at 600F of greater than or equal to 27 degrees but less than or equal to 39 degrees.

b)

A kinematic viscosity at 40'C of greater than or equal to 1.9 centistokes, but less than or equal to 4.1 centistokes, if gravity was not determined by comparison with the supplier's certification.

c)

A flash point equal to or greater than 1250F, and d)

A clear and bright appearance with proper color when tested in accordance with ASTM D4176-82.

2) By verifying within 31 days of obtaining the sample that the other properties specified in Table 1 of ASTM D975-81 are met when tested in accordance with ASTM D975-81 except that the analysis for sulfur may be performed in accordance with ASTM D1552-79 or ASTM D2622-82.
d. At least once every 31 days by obtaining a sample of fuel oil from the storage tanks in accordance with ASTM D2276-78, and verifying that total particulate contamination is less than 10 mg/liter when checked in accordance with ASTM D2276-78, Method A, except that the filters specified in ASTM D2276-78, Sections 5.1.6 and 5.1.7, may have a nominal pore size of up to three (3) microns.
e. At the following frequency by:
1. Deleted
2. Every 24 months verify each diesel generator's capability to reject a load of greater than or equal to that of its single largest post-accident load while maintaining voltage at 4285 +/- 420 volts and frequency at 60 +/- 1.2 hz and after steady state conditions are reached, voltage is maintained at 4280 +/- 120 volts.

LIMERICK - UNIT 1 3/4 8-4 Amendment No. 32, At, 404, 4-24, -13, 165

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

b. By removing accumulated water:
1) From the day tank at least once per 31 days and after each occa-sion when the diesel is operated for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and
2) From the storage tank at least once per 31 days.
c. By sampling new fuel oil in accordance with ASTM D4057-81 prior to addition to the storage tanks and:
1) By verifying in accordance with the tests specified in ASTM D975-81 prior to addition to the storage tanks that the sample has:

a)

An API Gravity of within 0.3 degrees at 60'F or a specific gravity of within 0.0016 at 60/60'F, when compared to the supplier's certificate or an absolute specific gravity at 60/60*F of greater than or equal to 0.83 but less than or equal to 0.89 or an API gravity at 600F of greater than or equal to 27 degrees but less than or equal to 39 degrees.

b)

A kinematic viscosity at 40'C of greater than or equal to 1.9 centistokes, but less than or equal to 4.1 centistokes, if gravity was not determined by comparison with the supplier's certification.

c)

A flash point equal to or greater than 1250F, and d)

A clear and bright appearance with proper color when tested in accordance with ASTM D4176-82.

2) By verifying within 31 days of obtaining the sample that the other properties specified in Table 1 of ASTM D975-81 are met when tested in accordance with ASTM D975-81 except that the analysis for sulfur may be performed in accordance with ASTM D1552-79 or ASTM D2622-82.
d. At least once every 31 days by obtaining a sample of fuel oil from the storage tanks in accordance with ASTM D2276-78, and verifying that total particulate contamination is less than 10 mg/liter when checked in accordance with ASTM D2276-78, Method A, except that the filters specified in ASTM D2276-78, Sections 5.1.6 and 5.1.7, may have a nominal pore size of up to three (3) microns.
e. At the following frequency by:
1) Deleted
2) Every 24 months verify each diesel generator's capability to reject a load of greater than or equal to that of its single largest post-accident load while maintaining voltage at 4285 +/- 420 volts and frequency at 60 +/- 1.2 hz and after steady state conditions are reached, voltage is maintained at 4280 +/- 120 volts.

LIMERICK - UNIT 2 3/4 8-4 Amendment No. -34, &-, 8S, 921, 4-0, 128