UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION RAS 6315 DOCKETED 04/16/03 ATOMIC SAFETY AND LICENSING BOARD PANEL SERVED 04/16/03 Before Administrative Judges:
Ann Marshall Young, Chair Dr. Richard F. Cole Dr. Thomas S. Elleman In the Matter of Docket No. 50-336-OLA-2 DOMINION NUCLEAR CONNECTICUT, INC. ASLBP No. 03-808-02-OLA (Millstone Nuclear Power Station, Unit 2) April 16, 2003 ORDER (Scheduling Oral Argument on Contention)
This proceeding involves a September 26, 2002, application of Dominion Nuclear Connecticut, Inc. (Dominion), to amend the operating license for Millstone Power Station, Unit No. 2, by changing certain technical specifications, based upon a re-analysis of the limiting design basis Fuel Handling Accident (FHA) using an Alternative Source Term in accordance with 10 C.F.R. § 50.67 and NRC Regulatory Guide 1.183. This application was among those included in a November 2002 NRC Biweekly Notice regarding Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations. 67 Fed. Reg.
68,728, 68,731 (Nov. 12, 2002). On December 12, 2002, in response to this notice and Dominions application, the Connecticut Coalition Against Millstone (CCAM) and the STAR Foundation (STAR) filed an Amended Petition to Intervene and Request for Hearing.
By Memorandum and Order dated February 14, 2003, LBP-03-03, this Licensing Board held that Petitioner CCAM has standing to participate in this proceeding, and established deadlines of March 7 and 28, 2003, respectively, for the submission of a supplemented petition and contentions, and responses thereto. Subsequently, we approved extensions of these
2 deadlines to March 10 and 31, 2003. Pursuant to the extended deadlines, Petitioner CCAM filed its Supplemented Petition and Contention March 10, and Dominion and the NRC Staff filed their Answers, opposing CCAMs Contention, March 31, 2003.
This Licensing Board will hear oral argument on CCAMs Contention on May 21, 2003, in a location to be announced, in the vicinity of the Millstone Nuclear Power Station. If all parties are not available on May 21, the Board will hold oral argument on June 5, 2003. Any party who will not be available as scheduled shall notify the Board and all other participants no later than Monday, April 21, 2003, in writing or by e-mail. Thereafter, additional information about the time and location of the oral argument will be provided.
It is so ORDERED.
FOR THE ATOMIC SAFETY 1
AND LICENSING BOARD
/RA/
Ann Marshall Young, Chair ADMINISTRATIVE JUDGE Rockville, Maryland April 16, 2003 1
Copies of this Order were sent this date by Internet e-mail or facsimile transmission, if available, to all participants or counsel for participants.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
DOMINION NUCLEAR ) Docket No. 50-336-OLA-2 CONNECTICUT, INC. )
)
)
(Millstone Power Station, Unit No. 2) )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing LB ORDER (SCHEDULING ORAL ARGUMENT ON CONTENTION) have been served upon the following persons by U.S. mail, first class, or through NRC internal distribution.
Office of Commission Appellate Administrative Judge Adjudication Ann M. Young, Chair U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Washington, DC 20555-0001 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Administrative Judge Richard F. Cole Thomas S. Elleman Atomic Safety and Licensing Board Panel ASLBP Mail Stop - T-3 F23 704 Davidson Street U.S. Nuclear Regulatory Commission Raleigh, NC 27609-5543 Washington, DC 20555-0001 Ann P. Hodgdon, Esq. Nancy Burton, Esq.
Brooke G. Smith, Esq. 147 Cross Highway Office of the General Counsel Redding Ridge, CT 06876 Mail Stop - O-15 D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
2 Docket No. 50-336-OLA-2 LB ORDER (SCHEDULING ORAL ARGUMENT ON CONTENTION)
Lillian M. Cuoco, Esq. David A. Repka, Esq.
Senior Nuclear Counsel Brooke D. Poole, Esq.
Millstone Power Station Winston & Strawn Rope Ferry Road 1400 L Street, NW Waterford, CT 06385 Washington, DC 20005
[Original signed by Evangeline S. Ngbea]
Office of the Secretary of the Commission Dated at Rockville, Maryland, this 16th day of April 2003