Letter Sequence Approval |
---|
TAC:MB6199, Missed Surveillance Requirements (Approved, Closed) |
|
MONTHYEARML0308304422003-03-21021 March 2003 License Amendment 187 Missed Surveillance Using Consolidated Line Item Improvement Process Project stage: Approval ML0308406052003-03-21021 March 2003 Tech Spec Pages for Amendment 187 Missed Surveillance Using Consolidated Line Item Improvement Process Project stage: Other ML0310606372003-04-16016 April 2003 Correction to Issuance of Amendment Missed Surveillances Project stage: Approval 2003-03-21
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31
[Table view] Category:Safety Evaluation
MONTHYEARML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22194A9012022-07-20020 July 2022 Issuance of Amendment No. 268 Adoption of Technical Specification Task Forcetraveler TSTF-569, Revise Response Time Testing Definition, Revision 2 ML22153A4452022-07-0808 July 2022 Issuance of Amendment No. 267 for Reactor Coolant System Pressure/Temperature Limits and Low Temperature Overpressure Setpoints Applicable for 55 Effective Full Power Years ML22145A0152022-05-27027 May 2022 Issuance of Amendment No. 266 to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22075A1022022-04-29029 April 2022 Issuance of Amendment No. 264 to Relocate Chemical Detection System Technical Specifications to Technical Requirements Manual ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22061A2172022-03-15015 March 2022 Revision of the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML22007A3172022-01-18018 January 2022 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21166A1832021-09-15015 September 2021 Issuance of Amendment No. 261 Regarding Removal and Relocation of Boration System Technical Specifications ML21131A2432021-08-24024 August 2021 Issuance of Amendment No. 260 Digital Upgrade to the Core Protection and Control Element Assembly Calculator System ML21082A3022021-05-19019 May 2021 Issuance of Amendment No. 259 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML20280A3292020-10-20020 October 2020 Issuance of Amendment No. 258 Regarding Technical Specification 3/4.8.1 Surveillance Requirements ML20205L5742020-08-25025 August 2020 Issuance of Amendment No. 257 Control Room Air Condition System Technical Specifications ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML20022A2582020-01-28028 January 2020 Re-Issuance of Approval of Relief Request WF3-RR-19 2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control ML20002A0202020-01-13013 January 2020 Approval of Relief Request WF3-RR-19-2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control System ML19275D4382019-10-24024 October 2019 Redacted - Issuance of Amendment No. 256 for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML19282D8922019-10-15015 October 2019 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19247B1972019-09-0909 September 2019 Approval of Relief Request W3-ISI-032,Relief from the Requirements of ASME Code Section XI Regarding Volumetric Examination ML19232A0252019-08-27027 August 2019 Authorization of Proposed Alternative to ASME Code Section XI, IWA-4000, Repair/Replacement Activities ML19164A0012019-06-28028 June 2019 Issuance of Amendment No. 254 Regarding Revision of Technical Specification 3/4.7.4, Ultimate Heat Sink, ML19157A3162019-06-12012 June 2019 Authorization of Proposed Alternative to ASME Code Case N-770-2 ML19022A3372019-02-13013 February 2019 Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel Misload ML18282A0302018-10-18018 October 2018 Proposed Alternative to ASME Code, Section XI, Regarding Charging Pipe Visual Inspection ML18180A2982018-07-23023 July 2018 Issuance of Amendment No. 252 Adoption of the Raptor-M3G Code for Neutron Fluence Calculations ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML18026B0532018-04-26026 April 2018 Issuance of Amendment No. 251 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control,(Cac No. MF9537; EPID L-2017-LLA-0205) ML17341A1202017-12-11011 December 2017 Relief Request PRR-WF3-2017-3, Request for Alternative to ASME OM Code Requirements for Comprehensive Testing of High Pressure Safety Injection Pump AB (CAC No. MF9875; EPID L-2017-LLR-0049) ML17328A8822017-11-29029 November 2017 Requests for Relief GRR-1, PRR-1 and PRR-2, Alternatives to ASME OM Code Requirements for Inservice Testing for the Fourth 10-Year Program Interval (CAC Nos. MF9869, 9870, and 9871; EPID L-2017-LRM-0045-47) ML17192A0072017-07-27027 July 2017 Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 ML17069A1872017-03-22022 March 2017 Request for Alternative to 10 CFR 50.55a(c) ASME Code Section III Code Case 1361-1, Relief Request W3-ISI-024 ML17045A1482017-03-0303 March 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16235A2282016-12-0909 December 2016 Request for Alternative Test Plan to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML16278A0172016-10-19019 October 2016 Entergy Fleet Relief Request RR-EN-ISI-15-1, Alternative to Maintain Inservice Inspection Related to Activities to the 2001 Edition/2003 Addendum of ASME Section XI Code ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16159A4192016-07-26026 July 2016 Issuance of Amendment No. 249 Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control ML16182A2702016-07-0606 July 2016 Relief Request PRR-WF3-2016-1, Alternative to the Inservice Testing Program ML16126A0332016-06-27027 June 2016 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16077A2702016-05-10010 May 2016 Issuance of Amendment No. 247 Regarding Cyber Security Plan Milestone 8 Full Implementation Schedule ML15289A1432015-11-13013 November 2015 Redacted - Issuance of Amendment No. 246 Changes to Technical Specification 3.1.3.4 Regarding Control Element Assembly Drop Times ML15267A7972015-10-0606 October 2015 Safety Evaluation Regarding the Aging Management Program for Reactor Vessel Internals ML15139A4832015-08-31031 August 2015 Issuance of Amendment No. 245 Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite Power 2023-05-01
[Table view] |
Text
April 16, 2003 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - CORRECTION TO ISSUANCE OF AMENDMENT RE: MISSED SURVEILLANCES (TAC NO.
MB6199)
Dear Mr. Venable:
The Commission issued Amendment No. 187 to Facility Operating License No. NPF-38 for the Waterford Steam Electric Station, Unit 3, on March 21, 2003. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated August 19, 2002, as supplemented by letter dated December 19, 2002. A copy of related Safety Evaluation (SE) was enclosed.
The amendment, among other revisions to the TSs, revised the current Surveillance Requirement (SR) 4.0.1 and SR 4.0.3 to be consistent with NUREG-1432, Revision 2, Improved Standard Technical Specifications wording for SR 3.0.1 and SR 3.0.3. However, the reference to the NUREG was given as 1431. Enclosed are corrected versions of the cover letter dated March 21, 2003, and pages 1 and 4 of the SE, with the corrections denoted by a vertical bar. Please discard the associated pages from the previous submittal and replace them with the enclosed pages.
If you have any questions, please call me at (301) 415-1480.
Sincerely,
/RA/
N. Kalyanam, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosure:
As stated cc w/encls: See next page
Mr. Joseph E. Venable April 16, 2003 Vice President Operations Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - CORRECTION TO ISSUANCE OF AMENDMENT RE: MISSED SURVEILLANCES (TAC NO.
MB6199)
Dear Mr. Venable:
The Commission issued Amendment No. 187 to Facility Operating License No. NPF-38 for the Waterford Steam Electric Station, Unit 3, on March 21, 2003. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated August 19, 2002, as supplemented by letter dated December 19, 2002. A copy of related Safety Evaluation (SE) was enclosed.
The amendment, among other revisions to the TSs, revised the current Surveillance Requirement (SR) 4.0.1 and SR 4.0.3 to be consistent with NUREG-1432, Revision 2, Improved Standard Technical Specifications wording for SR 3.0.1 and SR 3.0.3. However, the reference to the NUREG was given as 1431. Enclosed are corrected versions of the cover letter dated March 21, 2003, and pages 1 and 4 of the SE, with the corrections denoted by a vertical bar. Please discard the associated pages from the previous submittal and replace them with the enclosed pages.
If you have any questions, please call me at (301) 415-1480.
Sincerely,
/RA/
N. Kalyanam, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosure:
As stated cc w/encls: See next page DISTRIBUTION:
PUBLIC PDIV-1 Reading RidsNrrDlpmPdiv (HBerkow)
RidsNrrPMNKalyanam RidsNrrLADJohnson RidsNrrDlpmPdivLpdiv1 (RGramm)
RidsOgcRp RidsAcrsAcnwMailCenter G.Hill(2)
RDennig, DRIP/RORP (RLD) RTjader RidsRgn4MailCenter (AHowell)
DJaffe Accession No.: ML031060637 Package: ML030840612 Letter: ML030830442 TS pgs: ML030840605 OFFICE PDIV-1/PM PDIV-1/LA PDIV-1/SC NAME NKalyanam DJohnson RGramm DATE 4/2/03 4/1/03 4/16/03 OFFICIAL RECORD COPY
March 21, 2003 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - ISSUANCE OF AMENDMENT RE: MISSED SURVEILLANCES (TAC NO. MB6199)
Dear Mr. Venable:
The Commission has issued the enclosed Amendment No. 187 to Facility Operating License No. NPF-38 for the Waterford Steam Electric Station, Unit 3. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated August 19, 2002, as supplemented by letter dated December 19, 2002.
The amendment revises the TSs by: (1) modifying the wording of the current Surveillance Requirement (SR) 4.0.1 and SR 4.0.3 to be consistent with NUREG-1432, Revision 2, Improved Standard Technical Specifications (ISTS) wording for SR 3.0.1 and SR 3.0.3; and (2) modifying the ISTS wording, adopted in Item (1), above, for SR 4.0.3 to extend the delay period, before entering a Limiting Condition for Operation, following a missed surveillance. The delay period is extended from the current limit of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> "... when the allowable outage time limits of the ACTION requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />." to "...up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified surveillance interval, whichever is greater." In addition, the following requirement is added to SR 4.0.3: "A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed."
A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
Sincerely, Original signed by N. Kalyanam N. Kalyanam, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosures:
- 1. Amendment No. 187 to NPF-38
- 2. Safety Evaluation cc w/encls: See next page
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 187 TO FACILITY OPERATING LICENSE NO. NPF-38 ENTERGY OPERATIONS, INC.
WATERFORD STEAM ELECTRIC STATION, UNIT 3 DOCKET NO. 50-382
1.0 INTRODUCTION
By application dated August 19, 2002, as supplemented by letter dated December 19, 2002, Entergy Operations, Inc. (the licensee), submitted a request for changes to the Waterford Steam Electric Station, Unit 3 (Waterford), Technical Specifications (TSs). The proposed changes to the TSs would: (1) modify the wording of the current Surveillance Requirement (SR) 4.0.1 and SR 4.0.3 to be consistent with NUREG-1432, Revision 2, Improved Standard Technical Specifications (ISTS) wording for SR 3.0.1 and SR 3.0.3; and (2) modifying the ISTS wording, adopted in Item (1), above, for SR 4.0.3 to extend the delay period, before entering a Limiting Condition for Operation, following a missed surveillance. The delay period is extended from the current limit of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> "... when the allowable outage time limits of the ACTION requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />." to "...up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified surveillance interval, whichever is greater." In addition, the following requirement would be added to SR 4.0.3: "A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed."
2.0 BACKGROUND
The licensees proposal follows one of the industrys initiatives under the risk-informed TS program. The licensees application references Technical Specification Task Force (TSTF)-358, Revision 6, which incorporates changes made to TSTF-358, Revision 5, made in response to a notice published in the Federal Register (FR) on June 14, 2001 (66 FR 32400),
seeking public comment. The licensee stated in its application that it is proposing no variations or deviations from the TS changes in TSTF-358, Revision 6, or in the staffs model safety evaluation (SE) dated June 14, 2001, as modified by the comments and responses published in the FR on September 28, 2001 (66 FR 49714).
In a letter dated November 17, 1999, the Nuclear Energy Institute (NEI) TSTF proposed several changes to the improved Standard Technical Specifications (STS) (i.e., NUREGs-1430 through
-1434) on behalf of the industry. One of the proposed changes, identified as TSTF-358, was a change to STS SR 3.0.3 regarding missed SRs. On February 14, 2000, the staff requested that the NEI TSTF modify TSTF-358 to address several questions and comments that the staff had during their initial review of the proposed change. On September 15, 2000, the NEI TSTF
The NRC staff has determined that the proposed change is applicable to all licensees. In Generic Letter 87-09, the staff concluded that the proposed modifications would result in improved TSs for all plants and no limitations were put on the applicability of the proposed changes. Because the basis for this proposed change is largely the same as for the change proposed in Generic Letter 87-09, the staff believes the same broad applicability is appropriate.
In addition, every licensee is required to comply with the Maintenance Rule and, therefore, will have implemented programs to comply with 10 CFR 50.65(a)(4) to assess and manage risk associated with maintenance and other operational activities.
The Waterford TS are an older version of the current ISTS described in NUREG-1432, Revision 2. The requirements concerning missed surveillances, contained in the ISTS SR 3.0.3 are incorporated in Waterford SR 4.0.3.
3.0 EVALUATION As noted above, the licensee has proposed modifying the wording of the current SR 4.0.1 and SR 4.0.3 to be consistent with NUREG-1432, Revision 2 wording for SR 3.0.1 and SR 3.0.3.
These modifications involve no technical changes to the existing TSs, are administrative in nature, are required in order to adopt the proposed changes associated with TSTF-358, Revision 6, and are acceptable.
The proposed change to SR 4.0.3, as modified to be consistent with NUREG-1432, Revision 2 wording, would be further changed to allow a delay period from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> up to the surveillance frequency, whichever is greater, to perform a missed surveillance prior to having to declare the LCO not met. The proposed change would also add a sentence to SR 4.0.3 that states, A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.
The proposed change will not allow equipment known to be inoperable to be considered operable until the missed surveillance is performed. If it is known that the missed surveillance could not be met, SR 4.0.1 would require that the LCO be declared not met and the appropriate condition(s) entered. In addition, the Bases for SR 4.0.3 state that use of the delay period established by SR 4.0.3 is a flexibility which is not intended to be used as an operational convenience to extend surveillance intervals, but only for the performance of missed surveillances.
The modification would also include changes to the Bases for SR 4.0.3 that provide details on how to implement the new requirements. The Bases changes provide guidance for surveillance frequencies that are not based on time intervals but are based on specified unit conditions, operating situations, or requirements of regulations. In addition, the Bases changes state that the licensee is expected to perform any missed surveillance test at the first reasonable opportunity, taking into account appropriate considerations, such as the impact on plant risk and accident analysis assumptions, consideration of unit conditions, planning, availability of personnel, and the time required to perform the surveillance. The Bases also state that the risk impact should be managed through the program in place to implement 10 CFR 50.65(a)(4) and its implementation guidance, NRC Regulatory Guide 1.182, Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants, dated May 2000, and that the missed surveillance should be treated as an emergent condition as discussed in Regulatory Guide 1.182. In addition, the Bases state that the degree of depth and rigor of the evaluation should
Waterford Generating Station 3 cc:
Mr. Michael E. Henry, Administrator Regional Administrator, Region IV and State Liaison Officer U.S. Nuclear Regulatory Commission Department of Environmental Quality 611 Ryan Plaza Drive, Suite 1000 P. O. Box 82135 Arlington, TX 76011 Baton Rouge, LA 70884-2135 Parish President Council Vice President, Operations Support St. Charles Parish Entergy Operations, Inc. P. O. Box 302 P. O. Box 31995 Hahnville, LA 70057 Jackson, MS 39286-1995 Executive Vice President Director & Chief Operating Officer Nuclear Safety Assurance Entergy Operations, Inc.
Entergy Operations, Inc. P. O. Box 31995 17265 River Road Jackson, MS 39286-1995 Killona, LA 70066-0751 Chairman Wise, Carter, Child & Caraway Louisiana Public Services Commission P. O. Box 651 P.O. Box 91154 Jackson, MS 39205 Baton Rouge, LA 70825-1697 General Manager Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 January 2002