ML031060506
| ML031060506 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 04/09/2003 |
| From: | Abney T Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| EPIP-2, Rev 26, EPIP-3, Rev 29, EPIP-4, Rev 28, EPIP-5, Rev 33 | |
| Download: ML031060506 (57) | |
Text
EI Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 April 9, 2003 10 CFR Part 50, App E U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of
)
Docket Nos. 50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) -'UNITS 1, 2, and 3 -
EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISIONS TVA is submitting this notification in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V.
Specifically, EPIPs were revised, namely, EPIP-2, Revision 26; EPIP-3, Revision 29; EPIP-4, Revision 28; and EPIP-5, Revision 33.
The effective date for these revisions is April 3, 2003.
The enclosed information is being sent by certified mail.
The signed receipt signifies that you have received this information.
If you have any questions, please telephone me at (256) 729-2636.
S.c e T. E.
b Manager o ensi and dustry Affairs cc:
e Page Pri-ted on recycled paper
U.S. Nuclear Regulatory Commission Page 2 April 9, 2003 cc (Enclosure):
NRC Resident Inspector (Enclosure provided by Browns Ferry Nuclear Plant BFN Document Control Unit) 10833 Shaw Road Athens, Alabama 35611-6970 Mr. Stephen J. Cahill, Branch Chief (2 Enclosures)
U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street S.W., Suite 23T85 Atlanta, Georgia 30303-8931 Mr. Kahtan N. Jabbour, Senior Project Manager (w/o Enclosure)
U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)
Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 1, 2, AND 3 EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISIONS EPIP-2, EPIP-3, EPIP-4, AND EPIP-5 SEE ATTACHED
GENERAL REVISIONS FILING INSTRUCTIONS FILE DOCUMENTS AS FOLLOWS:
PAGES TO BE REMOVED PAGES TO BE INSERTED EPIP-2, Revision 25 EPIP-3, Revision 28 EPIP-4, Revision 27 EPIP-5, Revision 32 EPIP-2, Revision 26 EPIP-3, Revision 29 EPIP-4, Revision 28 EPIP-5, Revision 33
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-2 NOTIFICATION OF UNUSUAL EVENT REVISION 26 PREPARED BY: TIM CORNELIUS RESPONSIBLE ORGANIZATION. EMERGENCY PREPAREDNESS APPROVED BY: JEFF LEWIS PHONE: 2038 DATE: 04/02/2003 EFFECTIVE DATE: 04/0312003 LEVEL OF USE: REFERENCE USE QUALITY-RELATED
REVISION LOG Procedure Number:
EPIP-2 Revision Number: 26 Pages Affected: 7,8,10 Description of Change:
IC-27 This change is being conducted to incorporate the management of NRC Commitment changes as prescribed in the correspondence from site licensing RIMS R08000217713, to remove the Public Information Officer from the notification form and to human factor the notification and follow-up notification forms.
Page 2 - change to step 3.1.1 involves human factoring the Notification Form Title.
Page 7 - changes involves removing the "NRC Commitment Brackets to step requiring the review of PORC and the human factoring of applicable steps.
Page 7 - change involves human factoring attachment title.
Page 8 - change involves human factoring attachment title and modifying information to ensure consistency weith NRC guidance.
Page 9 - change involves removing the Public Information Officer from the Attachment B notifications along with the NRC Commitment Brackets Page 10 - change involved adding a clanrfy statement concerning the appropriate use of the Follow-up Notification Form.
IC-28 EPIP-2, revision 23 is being issued to incorporate changes resulting from the letter, NEI to NRC (to Mr. Bruce A. Boger) dated December 18, 2001 requesting confirmation for EAL basis change to include response to a Site-Specific Security Credible Threat. This letter was developed in response to the NRC's October 6, 2001 Safeguards Advisory. The change to this EPIP is a consequence to the EAL change. Under specific conditions this change xvill activate the ERO along Nvith assembly/accountability.
The revision also incorporates standardization of telephone numbers and actions taken by the Unit 1, Unit Operator during ERO staffing.
Page 2 - provide the action to staff the ERO when a credible site security threat notification exists.
Page 3 - provide the action to assemblylaccount site personnel for the purpose of establishing the "TN, o Person (Line of Sight) Rule".
Page 4 - standardize the review of PORC for actual events.
Page 7 - add attachment D.
Page 11 - add attachment D, actions taken by the Unit 1 Unit operator to staff the ERO.
IC-29 EPIP-2, revision 24, page 3 is being conducted to add clarification to the caution note regarding on-site security conditions for assembly/accountability. Additionally page 2 and 5 was revised to update telephone information regarding the Office of Radiation Control.
IC-30 EPIP-2, revision 25, pages 2, 7, 11 and 12 are being conducted to remove the activation of the ERO upon declaration of an Unusual Event based upon a credible threat. Page 4 is being revised to change the reference for Dose Assessment from EPIP-14 to EPIP-13.
IC-31 EPIP-2, rev. 26 is being conducted to standardize record retention (page 7) and revise the notification forms to include NRC Tenminology from RIS 2002-16 for nonnal and abnormal releases (pages 8 & 10).
NOTIFICATION OF UNUSUAL EVENT EPIP-2 BROWNS FERRY NUCLEAR PLANT 1.0 PURPOSE 1.1 Provide for timely notification of appropriate individuals or organizations when the Shift Manager has determined by EPIP-I that an incident has occurred which is classified as a NOTIFICATION OF UNUSUAL EVENT.
1.2 Provide for periodic analysis of the current situation by the Shift Manger/Site Emergency Director (SED) to determine whether the NOTIFICATION OF UNUSUAL EVENT should be terminated, continued, or upgraded to a more serious classification 2.0 SCOPE This procedure applies to emergency events that are classified as a Notification of Unusual Event by EPIP-1, Emergency Classification Procedure.
.,,.f.,...
II I
I I
I I
X
. 1
)
-I'-
I I.
I I.
I I
1, i
I I
I I
I I.I.I...
I
.. I PAGE 1 OF 10 REVISION 26
NOTIFICATION OF UNUSUAL EVENT EPIP-n2 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS 3.1 Notification of the Operations Duty Specialist (ODS)
Note: The ODS should be notified within 5 minutes after the emergency event is declared.
D Date:
/_
3.1.1 Complete Attachment A (Initial Notification Form).
3.1.2 Notify the ODS and Provide the information from Attachment A.
Note: Utilize the direct ring'down ODS phone when making this notification or as applicable dial direct.
ODS Telephone Numbers 5-751-1700 5-751-2495 If the ODS cannot be reached within-1 0minutes, Th en contact the State of AlJabtama directl'y by requesting the Office of Radiation Control at:
Day Shift 8 a m - 5 p.m. (Central Time)
Primary:
9-1-334-206-5391 Backup:
9-1-800-582-1866 Holidays-Weelends-Offshi'fts Montgomery SLate Trooper Post 9-1-334-242-4378 MnuTIALS TIME NrALs TmiE I2 1 I 3.1.3 Fax a copy of Attachment A to the ODS for confirmation of information or state if contacted directly.
Lobns TmE ODS Fax 5-751-8620 Office of Radiation Control 9-1-334-206-5387 PAGE 2 OF 10 REVISION 26
NOTIFICATION OF UNUSUAL EVENT EPIP-2 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.1.4 Receive confirmation call from the ODS (to verify notification of the State of Alabama) (NA this step if the State was contacted directly) 3.2 NOTIFICATION OF SITE PERSONNEL INYmULS Timm 3.2.1 Provide the Unit 1, Unit Operator with a completed copy of Attachment A 3.2.2 Direct the Unit 1, Unit Operator to make notifications from Attachment B ( Unit 1, Unit Operator Notifications), utilizing information from Attachment A.
3.2.3 Make the following plant P.A. announcement:
INMTALS TrinE INiTIMS TIME INMTALS TImE THIS IS (NAME), SHIFT MANAGER. A NOTIFICATION OF UNUSUAL EVENT HAS BEEN DECLAREPON,,NIT
,I HAVE ASSUMED THE DUTIES OF SITE EMERGENCY DIRECTOR 3.2.4 Notify the Plant Manager or alternate.
INrITLUS TitE CAUTION:
Do not initiate Assembly and Accountability if:;
I.
A severe weather popdition exist or projecnte4 on-site, such as a Tornado.
- 2.
An on-site security risk condition exists that may present a danger to site personnel during the assembly/accountability process (Consult with Nuclear Secjurity).,,,
.v
- 4*1, _
a l ~~~~~~~~~I 3.3 ACCOUNTABILITY I
3.3.1 If the NOUE has ben declared due to SecurityEAL, 6.7-U, and Nuclear Security recommends Accountability to establish the "Two Person (Line of Sight) Rule",
Then implement EPIP-8, Appendix C, for Assembly and Accountability only.
INITALS TIME PAGE 3 OF 10 REVISION 26
NOTIFICATION OF UNUSUAL EVENT EPIP-2 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.4 OFFSITE DOSE ASSESSMENT 3.4.1 Evaluate the need for offsite dose assessment..
(N/A STEP IF NOT APPLICABLE) 3.4.1.1 When offsite dose assessment is required obtain the information from the CECC when operational.
3.4.1.2 If the CECC is not operational, contact the TSC, when staffed or the RADCON Shift Supervisor and request the implementation of EPIP 13, for dose assessment.
3.5 NOTIFICATION OF THE NRC 3.5.1 Notify the NRC immediately or within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and if requested by the NRC maintain an open and continuous communications channel.
Note: Utilize the Emergency Notification System (ENS) when making this notification. Dial the first number listed on the sticker affixed to the ENS telephone, by dialing 9 "The Ten Digit Number Listed on the ENS Telephones".
If the number is busy, Then select in order, the alternate numbers until a connection is achieved. No access codes are required.
I INMTALS TMEE INITIAS TImE PAGE 4 OF 10 REVISION 26
NOTIFICATION OF BROWNS FERRY UNUSUAL EVENT LPIP-2 NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.6 PERIODIC EVALUATION OF THE EVENT 3.6.1 Continue to Evaluate the event by using EPIP-1 as conditions warrant.
3.6.2 If other EAL conditions exist indicating the current emergency classification or significant changes in plant conditions have occurred since the last update to the ODS, and the CECC is not staffed, Then, Complete the "Follow-Up" Notification Form (Attachment C), notify the ODS and provide the new information. Utilize the direct ring-down ODS phone when making this notification or as applicable dial direct.
ODS 751-1700 5-751-2495 Note If the ODS cannot be reached, Then contact the State of Alabama directly by requesting the Office of Radiation Control at:
Day Shift 8 a m - 5 p.m (Central Time)
Primary: 9-1-334-206-5391 Backup: 9-1-800-582-1866 Holidavs-Weekends-Offshifts Montgomery State Trooper Post 9-1-334-242-4378_.,
3.6.3 If the conditions warrants upgrading to a higher classifications, Then initiate the appropriate EPIP.
l 3.6.4 If the conditions warrant termination of the classification, Then enter the Termination section of this procedure at step 3.7.
3.6.5 Re-enter this procedural section as conditions warrant at step 3.6.1 or until directed to exit this procedure by steps 3.6.3 or 3.6.4.
- PAGE 5 OF 10 REVISION 26
NOTIFICATION OF UNUSUAL EVENT EPIP-2 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.7 TERMINATION OF THE EVENT If the situation no longer exists terminate the event and notify the following:
Date:
I
/_
3.7.1 Notify the ODS of the termination of the emergency or the state directly if the ODS cannot be contacted.
INITIALS TBME 3.7.2 Notify the NRC of the termination of the emergency.
3.7.3 Notify the Plant Manager or Alternate of the termination of the emergency.
3.7.4 Complete Attachment A by providing the time and date of termination.
a ov I
'f
- '9' r
3.7.4 Notifythe. Unit 1,, Unit.Operator. Provide the Unit 1, Unit Operator with the termination time and date and direct the Unit 1, Unit Operator to notify the individuals contacted on Attachment B of the termination of the emergency.
INITILS TINE LNT1ILLS TmE LNIMALS I¢ TImE I a I
I:.
I I
I MnlALS TIME I,
I k*
I E
i, l
I I
i I
I PAGE 6 OF 10 REVISION 26
NOTIFICATION OF UNUSUAL EVENT EPIP-2 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.8 CLOSURE OF THE NOTIFICATION OF UNUSUAL EVENT 3.8.1 Upon termination of the Notification of Unusual Event, the Shift Manager shall send the completed EPIP-2 and
-all attachments to Emergency Preparedness (EP).
3.8.2 Upon receipt of completed EPIP-2 and all attachments, Emergency Preparedness shall forward documents for the purpose of documentation storage.
INITIAS TIMrE INITIALS TnmE 4.0 RECORD RETENTION 4.1 RECORDS OF CLASSIFIED EMERGENCIES The materials generated in support of key actions during an actual emergency classified as NOUE or higher are considered Lifetime retention Non-QA records Materials shall be forwarded to the EP Manager who shall submit any records deemed necessary to demonstrate performance to the Corporate EP Manager for storag.'"':.
4.2 DRILL AND EXERCISE RECORDS The materials deemed necessary to demonstrate performance of key actions during drills are considered Non-QA records. These records shall be forwarded to the EP Manager who shall retain records deemed necessary to demonstrate six-year plan performance for six years -The EP Manager shall retain other records in this category for three years.
5.0 ATTACHMENTS Attachment A - Initial Notification Form Notification of Unusual Event Attachment B - Unit 1, Unit Operator Notifications Attachment C - Follow Up Information Form Notification of Unusual Event PAGE 7 OF R0 REVISION 26
II NOTIFICATION OF UNUSUAL EVENT
'EPIP-2 BROWNS FERRY NUCLEAR PLANT ATTACHMENT A (Page 1 of 1)
INITIAL NOTIFICATION FORM NOTIFICATION OF UNUSUAL EVENT
- 1.
0 This isa Drill D1 This
- 2. This is I
Brow affecting:
L1 Unit 1 III Unil
- 3. EAL Designator(s):
- 4. Brief Description of the Event:
s is an Actual Event - Repeat - This is an Actual Event vns Ferry has declared a UNUSUAL EVENT
- 2 El Unit 3 C] Common I
4,,
IJ
- 5. Radiological Conditions:
(Check one under both Airborne and Liquid column.)
Airborne Releases Offsite Liquid Releases Offsite Ej Minor releases within federally approved FD Minor releases within federally approved
- limits, limits' a Releases above federally approved limits' C] Releases above federally approved aI Release information not known limits'
('Tech Specs)
LI Release information not known
( 'Tech Specs)
- 6. Event Declared:
Time:
Date:
- 7. Provide Protective Action Recommendation:
Li None
- 8. Please repeat the information you have received to ensure accuracy.
- 9. Time and Date this information was provided
/
Action: When completed, telecopy this information.
PAGE 8 OF 10 REVISION 26
NOTIFICATION OF UNUSUAL EVENT EPIP-2 BROWNS FERRY NUCLEAR PLANT ATTACHMENT B (Page 1 of 1)
UNIT 1, UNIT OPERATOR NOTIFICATIONS Date:
/
l Note: All notifications should be made utilizing the information located on EPIP 2, Attachment A Received a completed copy of EPIP 2, Attachment A from the Site Emergency Director.
I INIMALS TLSIE Personnel Notifications Initial Notifications Termination Notifications
____________________________________________ I Notify the Operations Manager (from the weekly duty list)
Notify the Vice President (from the weekly duty list)
Notify the REP manager (from -the-weekly-duty list)
Notify the Nuclear Security Shift Supervisor.
Ext. 3150 or 2219 Initials Time Initials Time Initials Time Initials Time Initials Time Initials
- Initials, I,.i Initials Time Time Time J, - C, 'T Initials Time L
Initials Time Notify the NRC Resident Ext.
2573, or 2572 or from the weekly dut lit..-
duty list.
1
,j! -- --
--j -
i, a
- e v-i Ae, r
- 1 l je v)
,-C')
I a
PAGE 9 OF 10 REVISION 26
NOTIFICATION OF T^flTT BROWNS FERRY UNUSUAL EVENT ErIr-2 NUCLEAR PLANT ATTACHMENT C (Page 1 of 1)
FOLLOW-UP INFORMATION FORM NOTIFICATION OF UNUSUAL EVENT I THIS IS A REAL EVENT
[]THIS IS A DRILL Note: This form is for conducting Follow-up Information only.
This is at Browns Ferry.
Name There has been a NOTIFICATION OF UNUSUAL EVENT declared at Browns Ferry affecting:
LI Unit 1 I Unit2 LI Unit 3 LI Common The Reactor is aI Shutdown LI At Power Plant Conditions are a Stable a Deteriorating "Follow-Up" Information (e.g., Key Events, Status Changes)
Current Radiological Conditions are: (Check one under both Airborne and Liquid column.)
Airborne Release Offsite Liquid Releases Offsite a Minor releases within federally approved
[
Minor releases within federally approved limits' limits' El Releases above federally approved limits'-
F Releases above federally approved limits' Ej Release Information not known a
Release Information not known
( 'Tech Specs)
( 'Tech Specs)
Additional Rad information: (e.g., release duration)
I I
1 I
LI There is no Protective Action Recommendation at this time.
Please repeat the information you have received to ensure accuracy.
The time for this follow up is: Time:
Date:
SIGNATURE:
LAST PAGE PAGE 10 OF 10 REVISION 26
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-3 ALERT REVISION 29 PREPARED BY: T. W. CORNELIUS RESPONSIBLE ORGANIZATION: EMERGENCY PREPAREDNESS APPROVED BY: JEFF LEWIS EFFECTIVE DATE: 04/03/2003 LEVEL OF USE: REFERENCE USE QUALITY-RELATED PHONE: 2038 DATE: 04/02/2003 t I
-II-REVISION LOG Procedure Number:
EPIP-3
-- Revision Number: 29 Pages Affected: 3,5,6,8,11 Description of Change:
IC-30 This change is being conducted to incorporate the management of NRC Commitment changes as prescnbed in the correspondence from site licensing RIMS R08000217713, and to human factor the notification and follow-up notification forms.
Page 2 - change to step 3.2.1 involves human factoring the Notification Form Title.
Page 6 - changes involves removing the "NRC Commitment Brackets to step requiring the review of PORC and the human factoring of applicable steps.
Page 7 - change involves human factoring attachment title and modifying information to ensure consistency
- ith NRC guidance.
Page 8 - change involves adding information regarding the support of the Unit 1 Operator in staffing the ERO.
Page 9 - Updated information for the Unit Operator to use during the ERO staffing process.
Page 10 - change involved adding a clarify statement concerning the appropriate use of the Follow-up Notification Form.
IC-3 1 EPIP-3, revision 26 is being issued to incorporate changes regarding assembly and accountability actions. All actions to initiate the accountability and evacuation processes are nowv located in EPIP-8. The revision additionally standardizes telephone numbers, and PORC reviews. This revision also adds clarification for the actions taken by the Unit 1 Unit Operator during their staffing of the ERO process.
Page 3 - added a statement to the caution information regarding security threat. Clarified steps 3.4.1 and 3.4.2 to implement EPIP-8 regarding actions to be taken for assembly/accountability and evacuation.
Page 6 - standardize Alert procedure closure infonnation.
Page 8,9 - Clarify actions taken by the Unit 1 Unit Operator during the notification attachment.
IC-32 EPIP-3, revision 27 is being conducted to incorporate changes regarding actions to be taken when dangerous conditions exist on site that should require the assembly of the ERO at the staging area.
Additionally page 3 and 5 NAere revised to update telephone information regarding the Office of Radiation Control.
Page 2 - change instruct the SED when to direct the Unit 1 Unit Operator to assembly the ERO at the staging area.
Page 4 - revision adds clarification to the caution note regarding on-site security conditions for assembly/accountability.
Page 8 - revision adds option for staging area IC-33 EPIP-3, revision is being conduct to change the procedure reference for Dose Assessment from EPIP-14 to EPIP-13. Page 4 of this procedure is be revised.
IC-34 EPIP-3, rev. 29 is being conduct to standardize record retention (page 6) and reN ise the notification forms to include NRC Terminology from RIS 2002-16 for normal and abnormal releases (page 8 &
11). Additionally the revision xill provide a place to document the time and EAL Designation ashen centers are staffed (page 2). Attachment section was renumbered (page 5).
ALERT EPIP-3 BROWNS FERRY NUCLEAR PLANT 1.0 PURPOSE 1.1 Provide for timely notification of appropriate individuals or organizations when the Shift Manager/Site Emergency Director (SED) has determined by EPIP-1 that an incident has occurred which is classified as an ALERT.
1.2 Provide for periodic evaluation of the current situation by the Shift Manager/SED to determine whether the ALERT should be terminated, continued, or upgraded to a more serious classification.
2.0 SCOPE This procedure applies to emergency events that are classified as Alert by EPIP-1, Emergency Classification Procedure.
S 4--
.9, II 4,
- 4.
14*
4 - 4 4
4 4
4 4
S S
PAGE I OF 11 REVISION 0029
ALERT EPIP-3 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS Date:
j
/
3.1 If all Emergency Centers ARE STAFFED, Notify the following that a "ALERT Emergency Classification was declared at Time:
, EAL Designator
, and EPIP 3 is being implemented".
Then continue in this procedure. at Step 3.4.
D-FI1 Control Rooms 2
Plant PA Announcement LI This is NAM Site Emergency Director, an Alert has been declared at BFN, ice are currently implementing EPIP-3. Standby for further updates.
LNMAI~s TImE If all Emergency Centers ARE NOT STAFFED, Then N/A this step and continue in this procedure.
to -
3.2 Notification of the Operations Duty Specialist (ODS) & Emergencv Responders Note: The ODS should be notified within 5 minutes after the emergency event is declared.
3.2.1 Complete Attachment A (Initial Notification Form).
3.2.2 Activating Emergency Response Organization (ERO) 3.2.2.1 If ongoing/anticipated on-site security events may present a danger to the emergency responders, Then consult with Nuclear Security.
3.2.2.2 If ongoing/anticipated events present a danger to emergency responders, Then direct the Unit 1 Unit Operator to make notifications per Attachment B and select "Staging Area'" as the option for the Emergency Paging Syste'm.
3.2.2.3 If there are no ongoing/anticipated danger to emergency responders, Then direct the Unit 1 Unit Operator to make notifications per Attachment B and select as applicable, "Drill" or "Emergency" as the option for the Emergency Paging System.
INITILS TIMEE LNMrI S T MEE IP-71T1ALS' TMm I~TrrLUS TniME PAGE 2 OF 11 REVISION 0029
ALERT EPIP-3 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.2.3 Notify the ODS and Provide the information from Attachment A.
Note: Utilize the direct ring-down ODS phone when making this notification or as applicable dial direct ODS Telephone Numbers 751-1700,or 2495 If the ODS cannot be reached within 10 minutes, Then contact the State of Alabama directly by requesting the Office of Radiation Control at:
INH ALS TnIE Day Shift 8 a m - 5 p m (Central)
Primary: 9-1-334-206-5391 Backup: 9-1-800-582-1866 Holidays-Weekends-Off-Shifts Montgomery State Trooper Post 9-1-334-242-4378 3.2.4 Fax a copy of Attachment A to the ODS for confirmation
, -, A of information or state ifthe state was contacted directly.
INTrIALs TBiE ODS Fax 5-751-8620 Office of Radiation Control Fax 1-334-206-5387 1 '
3.2.5 Receive confirmation call from the ODS (to verify notification of the State ofAlabama)(NA this step, if the state was contacted directly)..
3.3 NOTIFICATION OF SITE PERSONNEL 3.3.1 MNake the following'plant P.A. announcement:
THIS IS (NAME), SHFT MANAGER. A ALERT HAS BEEN DECLARED ON UNit I
.SAVE ASSUMED THE DUTIES OF SITE EMERGENCY DIRECTOR. REPORT TO YOUR ASSIGNED EMERGENCY RESPONSE
'ACbITY AT THIS TIME.
1fNiTMS ToIE INITIAS TiME PAGE 3 OF 11 REVISION 0029
If ALERT EPIP-3 BROWNS FERRY NUCLEAR PLANT K11/
3.0 INSTRUCTIONS (CONTINUED)
CAUTION: Do not initiate Assembly and Accountability if:
- 1. A severe weather condition exist/projected on-site, such as a Tornado.
- 2. An on-site security risk condition exists that may present a danger to site personnel during the assembly/accountability process (Consult with Nuclear Security).
3.4 ACCOUNTABILITY 3.4.1 If the emergency situation warrants an Assembly, Accountability, Then implement EPIP-8, Appendix C, concurrently with this procedure.
I (N/A STEP IF NOT APPLICABLE) 3.4.2 If the emergency situation does not warrant an Assembly, Accountability at this time, Continue to assess the situation, implementing EPIP-8 when necessary.
3.5 OFFSITE DOSE ASSESSMENT INrIIALs TimE
-I' 3.5.1 Evaluate the need for offsite dose assessment.
(N/A STEP IF NOT APPLICABLE)
LNi lrs ToE 3.5.1.1 When offsite dose assessment is required obtain the information from the CECC when operational, 3.5.1.2 If the CECC is not operational, contact the TSC,.
wlfenstaffed or the RADCON Shift Supervisor and request the implementation of EPIP 13, for dose assessment.
PAGE 4 OF II REVISION 0029
ALERT TTh BROWNS FERRY E IPr-3 NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.6 NOTIFICATION OF THE NRC 3.6.1 Notify the NRC immediately or within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and if requested by the NRC maintain an open and continuous INITLILS TImE communications channel.
Note: Utilize the Emergency Notification System (ENS) when making this notification. Dial the first number listed on the sticker affixed to the ENS telephone, by dialing 9 "The Ten Digit Number Listed on the ENS Telephones".
If the number is busy, Then select in order, the alternate numbers until a connection is achieved. No access codes are required.
3.7 PERIODIC EVALUATION OF THE EVENT 3.7.1 Continue to Evaluate the event using EPIP-1 as conditions warrant.
3.7.2---Ifplant conditions warrant-the need for follow up information, Complete the Follow Up Notification Form, Attachment C.
Note: Conditions that warrant this evaluation are as a minimum when other EAL conditions exist indicating ti& current emergency classification or significant changes in plant conditions have occurred.
3.7.3 If the CECC is noi stafd,W henofytthe ODS and provide follow up information from the coimplektedi Attachment C fiorn.. Utilize the'direct ring-down ODS phone when making this notification or as applicabld dial direct.
ODS 751-2495, 1700 Note: If the ODS cannot be reached, Then contact the State of Alabama directly by requesting the Office of Radiation Control at:
Day Shift 8 a m - 5 p.m. (Central Time)
Holidays-Weekends-Off-shifis Primary:
9-1-334-206-5391 Montgomery State Trooper Post Backup:
9-1-800-582-1866 9-1-334-242-4378 3.7.4 If the conditions warrant upgrading to a higher classification, Then initiate the appropriate EPIP.
PAGE5 OF 11 REVISION 0029
ALERT EPIP-3 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.7.5 If the conditions warrants termination of the classifications, Then enter EPIP-16, Termination and Recovery Procedure.
3.7.6 After the evaluation has been completed, if staffed, Notify the following of the status:
- NRC (ENS)
- OSC CONTROL ROONiS PLANT PA ANNOUNCEMENT 3.7.7 Re-enter this procedural section as conditions warrant at step 3.7.1 or until directed to exit this procedure by steps 3.7.4 or 3.7.5.
3.8 CLOSURE OF THE ALERT 3.8.1 Upon termination of the Notification of Alert, the Shift Manager shall send the completed EPIP-3 and all attachments to Emergency Preparedness (EP).
3.8.2 Upon receipt of completed EPIP-3 and all attachments, Emergency Preparedness shall forward documents for the purpose of documentation storage.
IN=rALs TLEE INITILUS Ti~m 2
4.0 RECORD RETENTION 4.1 RECORDS OF CLASSIFIED EMERGENCIES The materials generated in support of key actions during an actual emergency classified as NOUE or higher are considered Lifetime retention Non-QA records. Materials shall be forwarded to the EP Manager who shall submit any records deemed necessary to demonstrate performance to the Corporate EP Manager for storage.
4.2 DRILL AND EXERCISE RECORDS The materials deemed necessary to demonstrate performance of key actions during drills are considered Non-QA records. These records shall be forwarded to the EP Manager who shall retain records deemed necessary to demonstrate six-year plan performance for six years. The EP Manager shall retain other records in this category for three years.
PAGE 6 OF I11 REVISION 0029 l
ALERT fl EPIP-3 BROWNS FERRY NUCLEAR PLANT 5.0 ATTACHMENTS Attachment A - Initial Notification Form Alert Attachment B - Unit 1, Unit Operator Notifications Attachment C - Follow Up Information Form Alert I
I 4'
'.4 i
- 4.
74 -V
.3-A.
4---
A,
' PAGE 7 OF 11 REVISION 0029
II ALERT EPIP-3 BROWNS FERRY NUCLEAR PLANT ATTACHMENT A (Page 1 of 1)
INITIAL NOTIFICATION FORM, ALERT
- 1.
C This is a Drill C] This is an Actual Event - Repeat - This is an Actual Event
- 2. This is Browns Ferry has declared a ALERT affecting: R Unit 1 C] Unit 2 LI Unit 3 L] Common
- 3. EAL Designator(s):
- 4. Brief Description of the Event:
- 5. Radiological Conditions:
(Check one under both Airborne and Liquid column.)
Airborne Releases Offsite Liquid Releases Offsite L Minor releases within federally approved L Minor releases within federally approved limits' limits' LI Releases above federally approved limits' LI Releases above federally approved L Release information not known limits'
('Tech Specs)
Li Release information not known
( 'Tech Specs)
- 6. Event Declared:
Time:
Date:
- 7. Provide Protective Action Recommendation:
LI None
- 8. Please repeat the information you have received to ensure accuracy.
- 9. Time and Date this information was provided
/
Action: When completed, telecopy this information.
PAGE 8 OF 11 REVISION 0029
ALERT EPIP-3 BROWNS FERRY NUCLEAR PLANT ATTACHMENT B (Page 1 of 2)
UNIT 1, UNIT OPERATOR NOTIFICATIONS Date:
/
I
'NOTES: (1) The Emergency Paging System (EPS) consists of a dedicated touch screen CRT.
Activation of any screen feature requires the user place their fingertip within the boundary of the select button and leave it there for at least 1 second. The CRT Screen will normally display a large rectangle that indicates that the paging system is available but currently inactive (2) If the EPS fails to operate, contact the SM/SED immediately. Request that the ODS be contacted to initiate the system from his location. If the system fails to operate from the ODS area, then utilize the Weekly Duty List and Call-Out List to manually staff the Emergency Responders, implementing this attachment at step E.
- 1. Activation of the Emergency Paging System (EPS).
A.
PRESS the EPS CRT Screen once to activate the paging options.
INITIALS TIME B.
PRESS the appropriate option as instructed by the SED
- PAGER TEST, DRILL EMERGENCY STAGING AREA ABORT C.
PRESS the START Button to initiate the option or ABORT to deny the option request:,
D MONITOR the Paging System Terminal Display
- 1.
IF._. A"NO" response is observed OR ~
The position being paged has not responded within approximately--20 minutes THEN:.. Utilize the Weekly Duty Listand 'atteffipt to contact the position representative with available information. (No Fitness for Duty Question Required) -
INITIALS TIME I
INITIALS TIME INITIALS
- TIME I
, j
- 2.
IF... The individual cannot be reached utilizing the WeeklyDuty List' THEN.. Utilize the Call-Out List and attempt to contact an alternate position representative. (Fitness for Duty Question Required)
PAGE 9 OF 11 REVISION 0029
ALERT EPIP-3 BROWNS FERRY NUCLEAR PLANT K>~
ATTACHMENT B (Page 2 of 2)
UNIT 1, UNIT OPERATOR.NOTIFICATIONS Date:
/
I E.
Manual Call-Out (N/A step if EPS operates normally)
- 1.
Utilize the current Weelky Duty List and contact positions as listed.
- 2.
If a position can not be reached from the current Weekly Duty list, then'refer to the Call-out List as applicable to fill all vacant positions.
INITIALS TIME F.
CONTINUE until all positions have been filled.
- 2. Notify the Unit Supervisors on shift.
- 3. Notify Nuclear Security Shift Supervisor and state "AN ALERT HAS BEEN DECLARED" and direct to activate EPIP-1 1, Security and Access Control.
Plant Extension 3150 or 2219 INITIALS TIME I,
INITIALS TIME INITIALS
- TIME,
- 4. Notify the Chemistry Lab Supervisor and state "AN ALERT HAS BEEN DECLARED" and direct to implement 2/341-331, Post Accident Sampling Procedure and CI-900 series,-
Analysis Procedures.
I~
II INITIALS TIME -
1, I.,
I Plant Extension 2367 or 2368
- 5. Notify the RADCON Shift Supervisor and state "AN ALERT HAS BEEN DECLARED" and direct to activate EPIP-14, Radiological Control Procedure.
INITIALS
- TIME, Plant Extension 7865 or 3104
- 6. Notify the "On-Call" NRC Resident'and state "AN ALERT HAS BEEN DECLARED," per BFN-EPIP-03.
Plant Extension 2572 [Secretary] or from weekly duty list INITIALS TIME'
\\K->
PAGE 10 OF II REVISION 0029 I
ALERT EPIP-3 BROWNS FERRY NUCLEAR PLANT I
ATTACHMENT C (Page 1 of 1)
FOLLOW-UP INFORMATION FORM ALERT El THIS IS A REAL EVENT El THIS IS AA DRILL Note: This form is for conducting Follow-up Information only.
This is at Name There has been a Alert declared at Browns Ferry affecting:
LI Unit 1 E1 Unit 2 El Unit 3 The Reactor is n Shutdown El At Power Plant Conditions are a Stable n Deteriorating "Follow-Up" Information (e.g, Key Events, Status Changes) t Browns Ferry.
El Common Current Radiological Conditions are: (Check one under both Airborne and Liquid column )
Airborne Release Offsite Liquid Releases Offsite El Minor releases within federally approved El Minor releases within federally approved limits' limits' l Releases above federally approved limits 1 El Releases above federally approved limits' Ej Release Information not known El Release Information not known
( 'Tech Specs)
( 'Tech Specs)
Additional Rad information: (e.g., release duration)
El There is no Protective Action Recommendation at this time.
Please repeat the information you have received to ensure accuracy.
The time for this follow up is. Time:
Date:
SIGNATURE:
LAST PAGE PAGE 11 OF 11 REVISION 0029
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-4 SITE AREA EMERGENCY REVISION 28 PREPARED BY: T. W. CORNELIUS RESPONSIBLE ORGANIZATION: EMERGENCY PREPAREDNESS APPROVED BY:
JEFF LEWIS I
.I EFFECTIVE DATE: 04/03/2003 LEVEL OF USE: REFERENCE USE PHONE 2038 DATE- 04/02/2003 QUALITY-RELATED
REVISION LOG Procedure Number:
EPIP-4 Revision Number: 28 Pages Affected: 2,7,8,11 Description of Change:
IC-31 This change is being conducted to incorporate a manual method of evacuating on-site, non-emergency response personnel during emergency situations. In addition changes to the procedure are being conducted to incorporate the management of NRC Commitment changes as prescribed in the correspondence from site licensing RIMS R08000217713, and to human factor the notification and follow-up notification forms.
Page 2 - change to step 3.2.1 involves human factoring the Notification Form Title.
Page 3- -changes to steps 3.4.1 - 3.4.5 involves information regarding steps for the SED to take vshen conducting an Accountably/Assembly and Evacuation.
Page 6 - changes involves removing the "NRC Commitment Brackets to step requinng the review of PORC and the human factoring of applicable steps.
Page 7 - change involves human factoring attachment title.
Page 8 - change involves human factoring attachment title and modifying information to ensure consistency with NRC guidance.
Page 9 - change involves adding information for Unit 1 Operator regarding ERO staffing support.
Page 10 - updated information for the Unit Operator to use during the ERO staffing process.
Page 11 - change involved adding a clarify statement concerning the appropnate use of the Follow-up Notification Form.
IC-32 EPIP-4, revision 25 is being issued to incorporate changes regarding assembly and accountability actions. All actions to initiate the accountability and evacuation processes are now located in EPIP-
- 8. The revision additionally standardizes telephone numbers, and PORC reviews. This revision also adds clarification for the actions taken by the Unit 1 Unit Operator during their staffing of the ERO process.
Page 3 - added a statement to the caution information regarding secunty threat. Clarified steps 3.4.1 and 3.4.2 to implement EPIP-8 regarding actions to be taken for assembly/accountability and evacuation.
Page 6 - standardize Site Area Emergency procedure closure information Page 8,9 - Clarify actions taken by the Unit 1 Unit Operator during the notification attachment.
IC-33 EPIP-4, revision 26 is being conducted to incorporate changes regarding actions to be taken when dangerous conditions exist on site that would require the assembly of the ERO at the staging area.
Additionally page 3 and 5 wvere revised to update telephone information regarding the Office of Radiation Control.
Page 2 - change instruct the SED when to direct the Unit 1 Unit Operator to assembly the ERO at the staging area.
Page 4 - revision adds clarification to the caution note regarding on-site security conditions for assembly/accountability.
Page 8 - revision adds option for staging area IC-34 EPIP-4, revision 27 is being conduct to change the procedure reference for Dose Assessment from EPIP-14 to EPIP-13. Page 4 of this procedure is be revised.
IC-35 EPIP 4, rev 28 is being conduct to standardize record retention (page 7) and revise the notification forms to include NRC Tenninology from RIS 2002-16 for normal and abnormal releases (page 8 &
11). Additionally the revision trill provide a place to document the time and EAL Designation when centers are staffed (page 2).
SITE AREA EMERGENCY EPIP-4 BROWNS FERRY NUCLEAR PLANT 1.0 PURPOSE 1.1 Provide for timely notification of appropriate individuals or organizations when the Shift Manager/Site Emergency Director (SED) has determined by EPIP-1 that an incident has occurred which is classified as a SITE AREA EMERGENCY (SAE) 1.2 Provide for periodic evaluation of the current situation by the Shift Manager/SED to determine whether the SAE should be terminated, continued, or upgraded to a more serious classification 2.0 SCOPE This procedure applies to emergency events that are classified as Site Area Emergency by EPIP-1, Emergency Classification Procedure.
I :
a _
'"L
'1 k
I I
I I I I
I
. AX.
_ I t
i I I
'-
- -;
"'<1
- .
.2
- >.
.4-
I
- ( fi,
.1
ti' S
- SS
-S.
S *
Ii S
'tS*
I -
¶5
- ,j'
.5
'.'1 II PAGE 1 OF 11 REVISION 28
II 1 SITE AREA EMERGENCY EPIP-4 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS Date:
/
/
3.1 If all Emergency Centers ARE STAFFED, Notify the following that a "Site Area Emergency Classification was declared at Time:
, EAL Designator
, and EPIP 4 is being implemented".
Then continue in this procedure at Step 3.4.
[D D]
ED Control Rooms
[]
Plant PA Announcement D
This is NAM Site Emergency Director, an Site Area Emergency has been declared at BFN, we are currently implementing EPIP-.. Standby for further updates.
INIfLUS TIME If all Emergency Centers ARE NOT STAFFED, Then N/A this step and continue in this procedure.
3.2 Notification of the Operations Duty Specialist (ODS) & Emergency Responders Note: The ODS should be notified within 5 miinutes zfter the emergency event is declared.
3.2.1 Complete Attachment A (Initial Notification Form).
3.2.2 Activating Emergency Response Organization (ERO) 3.2.2.1 If ongoing/anticipated on-site security events may present a danger to the emergency responders, Then consult with Nuclear Security.
3.2.2.2 If ongoing/anticipated events present a danger to
- emergency responders, Then direct the Unit 1 Unit Operator to make notifications per Attachment B and select "Staging Area" as the option for the Emergency Paging System.
3.2.2.3 If there are no ongoing/anticipated danger to emergency responders, Then direct the Unfit 1 Unit Operator to make notifications per Attachment B and select as applicable, "Drill" or "Emergency" as the option for the Emergency Paging System.
Itr IALS TLNUE INITUILS TiamE INMTAL§-
TI'E INrraus TMm
<-I PAGE 2 OF 11 REVISION 28
SITE AREA EMERGENCY EPIP-4 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.2.3 Notify the ODS and Provide the information from Attachment A.
Note: Utilize the direct ring-down ODS phone when making this notification or as applicable dial direct.
ODS Telephone Numbers 5-751-1700, 2495 If the ODS cannot be reached within 10 minutes, Then contact the State of Alabama directly by requesting the Rad Health Duty Officer at:
Day Shift 8 a m - 5 p m.(Central) Holidays-Weekends-Off-Shifts Primary: 9-1-334-206-5391 Montgomery State Trooper Post Backup: 9-1-800-582-1866 9-1-334-242-4378 3.2.4 Fax a copy of Attachment A to the-ODS for confirmation
.of information or if the state is contacted directly.-
INIMTILS TIME L1rrIALS TIME ODS Fax, 751-8620 Office of Radiation Control Fax 9-1-334-206-5387 I.
i I
I x
3.2.5 Receive confirmation call from the ODS (to verify notification of the State,of Al b~Ma)(NA this step, if the
'state was contacteddirectly). i,.,
I.NAMMS M
TEIE Z
I I
3.3 NOTIFICATION OF SITE PERSONNEL 3.3.1 to;,
a,"
4
' 2, '
".I, Make the following plant,*'.
.annorceme.nt.
,.,I
,I XNTT'TT AI C
-A.,
TIME
(
.s A
l Ml.
THIS IS (NAME), SHIFT,MANAGER..IA $FTE AREA EMERGENCY HAS BEEN DECLARED. ON UNIT
. I HAVE ASSUMED THE DUTIES OF SITE EMERGENCY DIRECTOR. REPORT TO YOUR ASSIGNED EMERGENCY RESPONSE FACILITY AT THIS TIME.
'0 PAGE 3 OF 11 REVISION 28
SITE AREA EMERGENCY EPIP-4 BROWNS FERRY NUCLEAR PLANT Jo~~
3.0 INSTRUCTIONS (CONTINUED)
CAUTION: Do not initiate Assembly and Accountability if:
- 1. A severe weather condition exist or projected on-site, such as a Tornado.
- 2. An on-site security risk condition exists that may present a danger to site personnel during the assembly/accountability process (Consult with Nuclear Security) 3.4 ACCOUNTABILITY AND EVACUATION OF NON-EMERGENCY RESPONDERS 3.4.1 If Assembly and Accountability has not been conducted, Then, implement EPIP-8, Appendix C concurrently with this procedure. If Accountability has been conducted, Then N/A this step and continue in this procedure at step 3.4.2.
3.4.2 If an order to evacuate non-emergency responders has not be issued, Then upon completion of Assembly and' Accountability, initiate the order to evacuate non-emergency responders, through the implementation of EPIP-8, Appendix F, concurrently with this procedure., If the order to evacuate non-emergency responders has been conducted, Then continue in this procedure at step 3.5.1.
3.5 DOSE ASSESSMENT 3.5.1 Evaluate the need for offsite dose assessment.
(N/A STEP IF NOT APPLICABLE) 3.5.1.1 When offsite dose assessment is required, obtain the information from the CECC when operational.
3.5.1.2 If the CECC is not operaiional; contact the TSC, when staffed, or the RADCON Shift Supervisor and request the implementation of EPIP 13, for dose assessment.
INITIALS TIME INITIALS TIME INITIALS TIME I.
PAGE 4 OF 11 REVISION 28
SITE AREA EMERGENCY EPIP-4,
BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.6 NOTIFICATION OF THE NRC 3.6.1 Notify the NRC immediately or within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; and if requested by the NRC maintain an open and continuous communications channel.
INITIALS TIME Note: Utilize the Emergency Notification System (ENS) when making this notification. Dial the first number listed on the sticker affixed to the ENS telephone, by dialing 9 "The Ten Digit Number Listed on the ENS Telephones".
If the number is busy, Then select in order, the alternate numbers until a connection is achieved No access codes are required 3.7 PERIODIC EVALUATION OF THE EVENT 3.7.1 Continue to Evaluate the event using EPIP-1 as conditions warrant.
3.7.2 If plant conditions -- xarrantthe need for follow up information, Complete the Follow Up NotificationFofm, Attachment C...
Note: Conditions that warrant this evaluation are as a minimum when other EAL conditions exist indicating the current emergency classification or significant changes in plant conditions have occurred.
3.7.3 If the CECC is not staffed, Thennotify, the ODS and provide follow up information from the completed Attachment C form. Utilize the direct ring-down ODS phone when making this notification'oras applicable 6Iial direct.; -.
5
- 5 1
ODS 751-2495, 1700 Note: If the ODS cannot be reached, Then contact-the State of Alabama directly by requesting the Rad Health Duty Officer ati
- , 'r !
( f I t a, I
I.
Day Shift 8 a m - 5 p m (Central Time)
Holidays-Weekends-Off-shifts Primary:
9-1-334-206-5391 Montgomery State Trooper Post Backup:
9-1-800-582-1866 9-1-334-242-4378 PAGE 5 OF 11 REVISION 28
SITE AREA EMERGENCY EPIP-4 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.7 PERIODIC EVALUATION OF THE EVENT (CONTINUED) 3.7.4 If the conditions warrants upgrading to a higher classification, Then initiate EPIP-5, General Emergency.
3.7.5 If the conditions warrant teimination of the classification, Then enter EPIP-16, Termination and Recovery Procedure.
3.7.6 After the evaluation has been completed, if staffed, Notify the following of the status:
- NRC (ENS)
- CONTROLRooMis PLANT PA ANNOUNCEMENT 3.7.7 Re-enter this procedural section as conditions warrant at step 3.7.1 or until directed to exit this procedure by steps 3.7.4 or 3 7.5.
3.8 CLOSURE OF THE SITE AREA EMERGENCY I
)
I,,I 3.8.1 Upon termination of the Notification of Site Area Emergency, the Shift Manager shall send the completed EPIP-4 and all attachments to Emergency Preparedness (EP).
3.8.2 Upon receipt of completed EPIP-4 and all attachments, Emergency Preparedness shall forward documents for the purpose of documentation storage.
INITIALS TIME INITIALS TIME PAGE 6 OF 11 REVISION 28
SITE AREA BROWNS FERRY EMERGENCY EPrIr-4 NUCLEAR PLANT 4.0 RECORD RETENTION 4.1 RECORDS OF CLASSIFIED EMERGENCIES The materials generated in support of key actions during an actual emergency classified as NOUE or higher are considered Lifetime retention Non-QA records. Materials shall be forwarded to the EP Manager who shall submit any records deemed necessary to demonstrate performance to the Corporate EP Manager.for storage.
4.2 DRILL AND EXERCISE RECORDS The materials deemed necessary to demonstrate performance of key actions during drills are considered Non-QA records. These records shall be forwarded to the EP Manager who shall retain records deemed necessary to demonstrate six-year plan performance for six years. The EP Manager shall retain other records in this category for three years 5.0 ATTACHMENTS Attachment A - Initial Notification Form Site Area Emergency Attachment B - Unit 1, Unit Operator Notifications Attachment C - Follow Up Information Form Site Area Emergency PAGE 7 OF 11 REVISION 28
SITE AREA EMERGENCY EPIP-4; BROWNS FERRY NUCLEAR PLANT ATTACHMENT A (Page I of 1)
INITIAL NOTIFICATION FORM SITE AREA EMERGENCY
- 1.
Li This is a Drill L] Thi
- 2. This is Brom affecting:
D Unit 1 D1 Unil
- 3. EAL Designator(s):
- 4. Brief Description of the Event:
s is an Actual Event - Repeat - This is an Actual Event rns Ferry has declared a SITE AREA EMERGENCY t2 L] Unit 3 M Common I
- 5. Radiological Conditions:
(Check one under both Airb6rne and Liquid column.)
Airborne Releases Offsite Liquid Releases Offsite E1 Minor releases within federally approved LI Minor releases within Federally limits' approved limits' El Releases above federally approved limits' E Releases above federally approved lii Release information not known limits'
('Tech Specs)
El Release information not known
('Tech Specs)
- 6. Event Declared:
Time:
Date:
- 7. Provide Protective Action Recommendation, E
None
- 8. Please repeat the information you have received to ensure accuracy.
- 9. Time and Date this information was provided
/
Action: When completed, telecopy this information.
PAGE 8 OF 11 REVISION 28
SITE AREA EMERGENCY EPIP BROWNS FERRY NUCLEAR PLANT ATTACHMENT B (Page 1 of 2)
UNIT 1; UNIT OPERATOR NOTIFICATIONS Date:
/
/
NOTES: (1) The Emergency Paging System consists of a dedicated touch screen CRT. Activation of any screen feature requires the user place their fingertip within the boundary of the select button and leave it there for at least I second. The CRT Screen will normally display a large rectangle that indicates that the paging system is available but currently inactive.
(2) If the EPS fails to operate, contact the SMVSED immediately. Request that the ODS be contacted to initiate the system from his location. If the system fails to operate from the ODS area, then utilize the Weekly Duty List and Call-Out List to manually staff the Emergency Responders, implementing this attachment at step E.
- 1. Activation of the Emergency Paging System (EPS).
A:
PRESS the EPS CRT Screen once to activate the paging options.
B PRESS the appropriate option
- PAGER TEST
- DRILL EMERGENCY
- STAGING AREA-
- ABORT INITIALS TIME INITIALS TIME I-r.-t\\,1 oAa F;
t C.
PRESS the START Button to initiate the option or ABORT to deny the-optioivrequest.
INITIALS D.
MONITOR the Paging System Terminal Display I
jrl>'Ita<-*
3NITIALS
- 1.
IF... A "NO" resprnse is;observed The-positionbeing-agedasnot-responded' within approximately 20 minutes Cu,.
d e
TIME TIME THEN... Utilize the Weekly Duty List and attempt.
to contact the position representative with, available information..(No Fitness-for Duty Question Required)
- 2.
I...
The individual cnnot 6 reached utilizing the Weekly Duty List. ;
THEN... Utilize the Call-Out List and attempt to contact an alternate position representative (Fitness for Duty Question Required)
PAGE 9 OF 11 REVISION 28
II SITE AREA EMERGENCY EPIP-4 '
BROWNS FERRY NUCLEAR PLANT remain ATTACHMENT B (Page 2 of 2)
UNIT 1, UNIT OPERATOR NOTIFICATIONS Date:
/_/
E.
Manual Call-Out (N/A step if EPS operates normally)
- 1.
Utilize the current Weelky Duty List and contact positions as listed.
INITIALS TIME
- 2.
If a position can not be reached from the current Weekly Duty list, then refer to the Call-out List as applicable to fill all vacant positions.
F.
CONTINUE until all positions have been filled.
- 2. Notify the Unit Supervisors on shift.
- 3. Notify Nuclear Security Shift Supervisor and state "AN SITE AREA EMERGENCY HAS BEEN DECLARED" and direct to activate EPIP-1 1, Security and Access Control.
Plant Extension 3150 or 2219 INITIALS TIME INITIALS TIME INITIALS TIME
- 4. Notifv the Chemistry Lab Supervisor and state "AN SITE AREA EMERGENCY HAS BEEN. DECLARED" and direct to implement 2/3-TI-33 1; Post Accident Sampling Procedure and CI-900 series, Analysis Procedures.
INITIALS TIME Plant Extension 2367 or 2368 -.
- 5. Notify the RADCON Shift Supervisor and state "AN SITE AREA EMERGENCY HAS BEEN DECLARED" and direct to activate EPIP-14, Radiological Control Procedure.
I P t E x o..7865 o
. -3 0
Plant Extension 7865 or 3 )104 INITIALS TIME
- 6. Notify the "On-Call" NRC Resident and state "AN SITE AREA EMERGENCY HAS BEEN DECLARED".
Plant Extension 2572 [Secretary] or from weekly duty list INITIALS TIME PAGE 10 OF II REVISION 28
SITE AREA BROWNS FERRY EMERGENCY EPIP-4 NUCLEAR PLANT ATTACHMENT C (Page 1 of 1)
FOLLOW-UP INFORMATION FORM SITE AREA EMERGENCY D THIS IS A REAL EVENT D THIS IS A DRILL Note: This form is for conducting Follow-up Information only.
This is at Browns Ferry.
Name There has been a Site Area Emergency declared at Browns Ferry affecting:
D Unit 1 D] Unit 2
[D Unit 3 D Common The Reactor is LI Shutdown FD At Power Plant Conditions are F Stable E] Deteriorating "Follow-Up" Information (e.g., Key Events, Status Changes)
I 11 I
I Current Radiological Conditions are: (Check one under both Airborne and Liquid column.)
Airborne Release Offsite
'Liquid Releases Offsite -
F] Minor releases within federally approved L] Minor releases within federally approved limits' Jo.
O -
- 4 > limits' v n
Releases abbve federally approved limits' 2.
'Releises above federally approved limits1 LI Release Information not krnown
. LI Reletse'Information not known
('Tech Specs)
.(i'Tech Specs)
Additional Rad information: (e.g, release duration) 1t t
i
- I_!.
L- :.
LI There is no Protective Action Recommendation at this time 4.
i,
, I Please repeat the information you have received to ensure accuracy The time for this follow up is: Time:
Date:
SIGNATURE:
LAST PAGE PAGE 11 OF 11 REVISION 28
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-5 GENERAL EMERGENCY REVISION 33 PREPARED BY. T. W. CORNELIUS RESPONSIBLE ORGANIZATION: EMERGENCY PREPAREDNESS APPROVED BY: JEFF LEWIS EFFECTIVE DATE: 04/03/2003 LEVEL OF USE: REFERENCE USE PHONE: 2038 DATE: 04/02/2003 QUALITY-RELATED
REVISION LOG Procedure Number:, EPIP-5 Revision Number: 33 Pages Affected: 2,7,8,12 Description of Change:
IC-37 This change is being conducted to incorporate a manual method of evacuating on-site, non-emergency response personnel during emergency situations. In addition changes to the procedure are being conducted to incorporate the management of NRC Commitment changes as prescribed in the correspondence from site licensing RIMS R08000217713, and to human factor the notification and follow-up notification forms.
Page 2 - change to step 3.2.1 involves human factoring the Notification Form Title and revised telephone for Morgan County.
Page 3/4 - changes to steps 3.4.1 - 3.4 5 involves information regarding steps for the SED to take when conducting an Accountably/Assembly and Evacuation.
Page 6 - changes involves removing the "NRC Commitment Brackets to step requiring the review of PORC and the human factoring of applicable steps.
Page 7 - change involves human factoring attachment title.
Page 8 - change involves human factoring attachment title.
Page 9 - change involves adding information for Unit I Operator regarding ERO staffing support.
Page 10 - revised to update information supporting Unit I Operator actions regarding ERO staffing support.
Page 11 - revised Protective Action Recommendation Flowchart Page 12 - change involved adding a clarify statement concerning the appropriate use of the Follow-up Notification Form.
IC-38 EPIP-4, revision 25 is being issued to incorporate changes regarding assembly and accountability actions. All actions to initiate the accountability and evacuation processes are now located in EPIP-
- 8. The revision additionally standardizes telephone numbers, and PORC reviews. This revision also adds clarification for the actions taken by the Unit 1 Unit Operator during their staffing of the ERO process.
Page 3 -added a statement to the caution information regarding security threat. Clarified steps 3.4.1 and 3.4.2 to implement EPIP-8 regarding actions to be taken for assembly/accountability and evacuation.
I Page 6 - standardize Site Area Emergency procedure closure information.
Page 8,9 - Clarify actions taken by the Unit 1 Unit Operator during the notification attachment.
IC-39 EPIP-5, revision 31 is being conducted to incorporate changes regarding actions to be taken when dangerous conditions exist on site that would require the assembly of the ERO at the staging area.
Additionally page 3 and 6 were revised to update telephone mnformation regarding the Office of Radiation Control.
Page 2 -change instruct the SED iN hen to direct the Unit 1 Unit Operator to assembly the ERO at the staging area.
Page 4 - revision adds clanfication to the caution note regarding on-site security conditions for assembly/accountability.
Page 9 - revision adds option for staging area IC-40 EPIP4, revision 32 is being conduct to change the procedure reference for Dose Assessment from EPIP-14 to EPIP-13. Page 5 of this procedure is be revised.
IC-41 EPIP-5, rev. 33 is being conduct to standardize record retention (page 7) and revise the notification forms to include NRC Terminology from RIS 2002-16 for normal and abnormal releases (page 8 &
12). Additionally the revision will provide a place to document the time and EAL Designation when centers are staffed (page 2)
I 1ia I~
-I I
I
~,
I i
I
( 1.
I I,.
GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT I
1.0 PURPOSE 1.1 Provide for timely notification of appropriate individuals or organizations when the Shift Manager/Site Emergency Director (SED) has determined by EPIP-1 that an incident has occurred which is classified as a GENERAL EMERGENCY (GE).
1.2 Provide for periodic evaluation of the current situation by the Shift Manager/SED to determine whether the GE should be terminated, or continued.
2.0 SCOPE This procedure applies to emergency events that are classified as General Emergency by EPIP-1, Emergency Classification Procedure.
I
/
PAGE 1 OF 12 REVISION 33
GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS Date:
/
I 3.1 If all Emergency Centers ARE STAFFED, Notify the following that a "General Emergency Classification was declared at Time:
, EAL Designator
, and EPIP 5 is being implemented".
Then continue in this procedure at Step 3.4.
[L Control Rooms Plant PA Announcement C]
hlus is NAME. Site Emergency Dlrector, an General Emergency has been declared at BFN. Ixe are currently unplementing EPIP-5 Standby for further updates INMrItS TIME If all Emergency Centers ARE NOT STAFFED, Then N/A this step and continue in this procedure.
3.2 Notification of the Operations Duty Specialist (ODS) & Emer2ency Responders Note: The ODS should be notified within 5 minutes after the emergency event is declared.
I -
3.2.1 Complete Attachment A (Initial Notification Form).
3.2.2 Activating Emergency Response Organization (ERO)
INITILUS TIME 3.2.2.1 If ongoing/anticipated on-site security events may present a danger to the'emergency responders,'
Then consult with Nuclear Security.
3.2.2.2 If ongoing/anticipated events present a danger to emergency responders, Then direct the Unit 1 Unit Operator to make'notifications per Attachment B and select "Staging Area',' as the option for the Emergency Paging System.
3.2.2.3 If there are no ongoing/anticipated danger to emergency responders, Then direct the Unit 1 Unit Operator to make notifications per Attachment B and select as applicable, "Drill" or "Emergency" as the option for the Emergency Paging System INTrHALS TImE IBruLms TMIiE INITLALS TIME PAGE 2 OF 12 REVISION 33
GENERAL EMERGENCY EPIP BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.2.3 Notify the ODS and Provide the information from Attachment A.
Note: Utilize the direct ring-down ODS phone when making this notification or as applicable dial direct.
INTraLs TIME ODS Telephone Numbers 5-751-1700, 2495 If the ODS cannot be reached within 10 minutes, Then contact the following and Provide the information from Attachment A:
- 1. Limestone County:
9-232-0111 INMALS TnIE
- 2. Morgan County:
- 3. Lawrence County:
9-1-256-432-2143 9-1-256-974-7641 LNTrLLS TIME LBrnuIs TmIE
- 4. Lauderdale County:
9-1-256-760-9117
- 5. State of Alabama Rad Health Duty Officer:
SI BIALS LNIALS -
TIMLiE T 4 TMfE Day Shift 8 a m. - 5 p m (Central) Holidays-Weekends-Off-Shifts Primary: 9-1-334-206-5391 Montgomery State Trooper Post Backup: 9-1-800-582-1866 9-1-334-242-4378 -
3.2.4 Fax a copy of Attachment A to the ODS for confirmation of information or the state if contacted directly.
INITI4LS' TIME ODS Fax 5-751-8620 Office of Radiation Control Fax 9-4 -334-206-5387 I.
.I 3.2.5 Receive confirmation call from the ODS (to verify notification of the State of Alabama), (N/A;this step if the State was contacted directly).
INITtALS TIME PAGE 3 OF 12 REVISION 33
GENERAL T'TTT BROWNS FERRY EMERGENCY EP Ir
- 5)
NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.3 NOTIFICATION OF SITE PERSONNEL 3.3.1 Make the following plant P.A. announcement, INITIALS TIME THIS IS (NAME), SHIFT MANAGER. A GENERAL EMERGENCY HAS BEEN DECLARED ON UNIT
. I HAVE ASSUMED THE DUTIES OF SITE EMERGENCY DIRECTOR. REPORT TO YOUR ASSIGNED EMERGENCY RESPONSE FACILITY AT THIS TIME.
CAUTION: Do not initiate Assembly and Accountability if:
- 1. A severe weather condition exist or projected on-site, such as a Tornado.
- 2. An on-site security risk condition exists that may present a danger to site personnel during the assembly/accountability process (Consult with Nuclear Security).
3.4 ACCOUNTABILITY AND EVACUATION OF NON-EMERGENCY RESPONDERS
,,'JJS I.
3.4.1 If Assembly and Accountability has not been conducted, Then, implement 'EPIP-8, Appendix C concurrently with INITIALS TIME this procedure. If Accouhtability hias been conducted, Then, continue in this procedure at step 3.4.2.
.4 3.4.2 If dn 6rder to evacuate nion-emergency responders has not be issued, Then upon completion of Assembly and INITIALS TIME Accountability, Initiate the orderto evac'uate non-emergency responders, through the implementation of EPIP-8, Appendix F, concurrently with this procedure. If the brder to evacuate non-emergency responders has been conducted, Then continue in this procedure at step 3.5.1.
PAGE 4 OF 12 REVISION 33
- GENERAL, BROWNS FERRY EMERGENCY EPIr-5 NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.5 DOSE ASSESSMENT 3.5.1 Evaluate the need for offsite dose assessment.
(N/A STEP IF NOT APPLICABLE)
INITIALS TIME 3.5.1.1 When offsite dose assessment is required Obtain the information from the CECC when operational.
3.5.1.2 If the CECC is not operational, Contact the TSC, when staffed or the RADCON Shift Supervisor and Request the implementation of EPIP 13, for dose assessment.
3.6 NOTIFICATION OF THE NRC 3.6.1 Notify the NRC immediately or within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and if J
requested by the NRC maintain ar, open and continuous INITIALS TIME communications channel.
Note: Utilize the Emergency Notification System (ENS) when making this notification. Dial the first number listed on the sticker affixed to the ENS telephone, by dialing 9 "The Ten Digit Number Listed on the ENS Telephones".
If the number is busy, Then select in order, the alternate.
numbers until a connection is achieved. No access codes are required.
3.7 PROTECTIVE ACTION RECOMMENDATION 3.7.1 If the CECC is not staffed. Then make a Protective Action Recommendation (PAR) using Attachment C.
INITIALS7 TIME (This PAR shall be made only by the SED)
(N/A STEP IF NOT APPLICABLE)
PAGE 5 OF 12 REVISION 33
GENERAL BROWNS FERRY EMERGENCY EPIP-5 NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.8 PERIODIC EVALUATION OF THE EVENT 3.8.1 Continue to Evaluate the event using EPIP-1 as conditions warrant.
3.8.2 If plant conditions warrant the need for follow-up information,' Complete the Follow-Up Notification Form, Attachment D.
Note: Conditions that warrant this evaluation are as a minimum when other EAL conditions exist indicating the current emergency classification or significant changes in plant conditions have occurred.
3.8.3 If the CECC is not staffed, Then notify the ODS and provide follow up information from the completed Attachment D form. Utilize the direct ring-down ODS phone when making this notification or as applicable dial direct.
ODS 751-2495, 1700 Note: If the ODS cannot be reached,. Then contact the State of Alabama directly by requesting the Rad Health Duty Officer at:
Day Shift 8 a m - 5 p.m (Central Time)
Holidays-Weekends-Off-shifts Primary:
9-1-334-206-5391 Montgomery, State Trooper Post Backup:
9-1-800-582-1866
'1 9-334L242-4378 3.8.4 If the conditions warrant termination ofthe.cjassification, Then enteeEPIP-16, Termination and Recovery Procedure:-.,.
3.8.5 After the evaluation has been completed, if staffed, Notify the following of the status.
V Y
1_
- NRC(ENS)
CONTROLFW1S¶
- PLANT PA ANNOUNCEMENT 3.8.6 Re-enter this procedural section as conditions warrant at step 3.8.1 or until directed to exit this procedure by steps 3.8.4.
PAGE 6 OF 12 REVISION 33
GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT, 3.0 INSTRUCTIONS (CONTINUED) 3.9 CLOSURE OF THE GENERAL EMERGENCY 3.9.1 Upon termination of the Notification of General Emergency, the Shift Manager shall send the completed EPIP-5 and all attachments to Emergency Preparedness (EP).
3.9.2 Upon receipt of completed EPIP-5 and all attachments, Emergency Preparedness shall forward documents for the purpose of documentation storage.
INITIALS TIME INITIALS TIME 4.0 RECORD RETENTION 4.1 RECORDS OF CLASSIFIED EMERGENCIES The materials generated in support of key actions during an actual emergency classified as NOUE or higher are considered Lifetime retention N6n-QA records. Miterials shall'be forwarded to the EP Manager who shall submit any records deemed necessary to demonstrate performance to the Corporate EP Manager for storage.
4.2 DRILL AND EXERCISE RECORDS The materials deemed necessary to demonstrate performance of key actions during drills are considered Non-QA records. These records shall be forwarded to the EP Manager who shall retain records deemed necessary to demonstrate six-year plan performance for six years. The EP Manager shall retain other records in this category for three years.
5.0 ATTACHMENTS
/y Attachment A - Initial Notification Form General Emergency Attachment B - Unit 1, Unit Operator Notifications Attachment C - Protective Action Recommendations Attachment D - Follow Up Information Form General Emergency PAGE 7 OF 12 REVISION 33
GENERAL to EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT ATTACHMENT A (Page 1 of 1)
INITIAL NOTIFICATION FORM, GENERAL EMERGENCY
- 1.
E This is a Drill a -This is an Actual Event - Repeat - This is an Actual Event
- 2. This is Browns Ferry has declared a GENERAL EMERGENCY affecting:
a Unit 1 El Unit 2 01 Unit 3 El Common 3
EAL Designator(s): _
- 4. Brief Description of the Event:
5.- Radiological Conditions:
(Check one under both Airborne and Liquid column.)
Airborne Releases Offsite
, Liquid Releases Offsite
[1 Minor releases within federally approved limits' n Minor releases within federally approved limits' F1 Releases above federally approved limits' 0 Releases above federally approved limits' EJ Release information not known
[j Release information not known
('Tech Specs)
('Tech Specs)
- 6. Event Declared:
Time:
Date:
- 7. The Meteorological Conditions,are: r,.(Use 91 meter data from the Met Tower)
Wind Direction is FROM:,
degrees Wind'Speed'.
m.p h
- 8. Provide Protective Action Recommendation:
(Check either 1 or 2, and mark wind direction.)
E1 Recommendation 1 WIND1 Recommendation 2
- EVACUATE LISTED SECTORS (2 mile Radius & 10 WIND
- EVACUATE LISTED SECTORS
-miles downwind)
FROM'
- (2 mile radius & 5 mile downwind)
- Shelter all non-listed'sectors (Mark)"
- SHELTER all other non-listed
sectors accordance with the State Plan.
. Consider issuance of POTASSIUM I.ODIDE in accordance with the X.-.
State Plan A-2, B-2, F-2, G-2, E-5, -10, F-5, -10, G-5, -10 4 - 40 A-2, B-2, F-2, G-2, E-5, F-5, G-5 A-2, B-2, F-2, G-2, F-5, -10, G-5, -10, H-1 0 41-73 A-2, B-2, F-2, G-2, F-5, G-5 A-2, B-2, F-2, G-2, G-5, -10, H-10, 1-10 74 - 92 A-2, B-2, F-2, G-2, G-5 K-1 0 A-2, B-2, F-2, G-2, A-5, -10, 1-10, J-10, K-1 138 - 203 _
A-2, B-2, F-2, G-2, A-5, A-2, B-2, F-2, G-2, A-5, -10, B-5, -10
_ 204 -:282 _
A-2, B-2, F-2, G-2, A-5, B-5 A-2, B-2, F-2, G-2, B-5, -10, C-10, DA0, E-5, -1 0 283 - 326 A-2, B-2, F-2, G-2, B-5, E-5 A-2, B-2, F-2, G-2, C-10, D-10, E-5,-10, F-5,-10 T 327 - 3 A-2, B-2, F-2, G-2, E-5, F-5
- 9. Please repeat the information you have received to ensure accuracy.
- 10. Time and Date this information was provided
/
Action: When completed, telecopy this information.
PAGE 8 OF 12 REVISION 33
GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT.
ATTACHMENT B (Page 1 of 2)
UNIT 1, UNIT OPERATORNOTIFICATIONS Date:
/
I NOTES: (1) The Emergency Paging System consists of a dedicated touch screen CRT. Activation of any screen feature requires the user place their fingertip within the boundary of the select button and leave it there for at least 1 second. The CRT Screen will normally display a large rectangle that indicates that the paging system is available but currently inactive.
(2) If the EPS fails to operate, contact the SMISED immediately. Request that the ODS be contacted to initiate the system from his location. If the system fails to operate from the ODS area, then utilize the Weekly Duty List and Call-Out List to manually staff the Emergency Responders, implementing this attachment at step E.
- 1. Activation of the Emergency Paging System (EPS).
A.
PRESS the EPS CRT Screen once to activate the paging options.
B.
PRESS the appropriate option
- PAGER TEST
- DRILL
- EMERGENCY STAGING AREA ABORT INITIALS TIME INITIALS TIME I
C.
PRESS the START Button to initiate the option or ABORT to deny the option request.
INITIALS TIME D.
MONITOR the Paging System Terminal Display
..INITL\\LS
- 1.
IF... A"NO" response is observed' OR The position being paged has not responded within approximately 20 minutes THEN... Utilize the.Weekly Duty List and attempt to contact the position representative.with.
available information. (No Fitness for Duty Question Required)
- 2.
IF... The individual cannot be reached utilizing the Weekly Duty List THEN... Utilize the Call-Out List and attempt to contact an alternate position representative. (Fitness for Duty Question Required)
TIME PAGE 9 OF 12 REVISION 33
GENERAL K>
EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT ATTACHMENT B (Page 2 of 2)
UNIT 1, UNIT OPERATOR NOTIFICATIONS Date:
I/
E. L Manual Call-Out (N/A step if EPS operates normally)
- 1.
Utilize the current Weekly Duty List and contact positions as listed INITIALS TIME 2
If a position can not be reached from the current' Weekly Duty list, then refer to the Call-out List as applicable to fill all vacant positions F.
CONTINUE until all positions have been filled.
- 2. Notify the Unit Supervisors on shift.
INITIALS TIME INITIALS TIME
- 3. Notify Nuclear Security Shift Supervisor and state "A GENERAL EMERGENCY HAS BEEN DECLARED" and direct to activate EPIP-1 1, Security and Access Control.
Plant Extension 3150 or 2219
- 4. Notify the Chemistry Lab Supervisor and state "A GENERAL EMERGENCY HAS BEEN DECLARED" and direct to implement 2/3-TI-33 1, Post Accident Sampling Procedure and CI-900 series, Analysis Procedures.
Plant Extension 2367 or.2368.
INITIALS TIME INITIALS TIME
- 5. Notify the RADCON Shift Supervisor and state "A GENERAL EMERGENCY HAS BEEN DECLARED" and direct to activate EPIP-14, Radiological Confrol Pr6cedure.
Plant Extension 7865 or 3104
- 6. Notify the "On-Call" NRC Resident and state "A GENERAL-EMERGENCY HAS BEEN DECLARED".
Plant Extension 2572 [Secretary] or from weekly duty list INITIALS TIME INITIALS TIME PAGE 10 OF 12 REVISION 33
GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT ATTACHMENT C (Page 1 of 1)
PROTECTIVE ACTION RECOMMENDATIONS Note 1: If conditions are unknown utilizing the flowchart, then answ er NO.
General Emergency t
~D e c I a r e d
- CONTII
. Modify p on availal NUE ASSESSMENT rotective actions based ble plant and field ig information.
id evaluate localized monitoril
/ Locate ar
/ I hot spots.
oror beyond D
/5miles is the Projected NO
~or Measured Dose 3
\\
Greater than PAG/
\\ TableI Limits/
1Y E
I
.1.
.,, ee
.r' A,
r
-I A
A L RECOMMENDATION 1 EVACUATE 2 miles radius and 10 miles downwind i AND SHELTER remainder of 10 mile EPZ I..
J RECOMMENDATION 2 EVACUATiE 2 mile radius and 5 miles downwind AND A SHELTER remainder of 10 mile EPZ I&-
A I
TABLE I
- I Protective Action Guides TYPE
.LIPIIT-Measured 3.9E-6 micro Ci/cc of Iodine 131 or 1 REMNhr ExternalDose Projected 1 REM TEDE or 5 REM Thyroid CDE I
PAGE 11 OF 12 REVISION 33
GENERAL BROWNS FERRY EMERGENCY EPIP-5 NUCLEAR PLANT ATTACHMENT D (Page 1 of 1)
FOLLOW-UP INFORMATION FORM GENERAL EMERGENCY E] THIS IS A REAL EVENT LI THIS IS A DRILL Note: This form is for conducting Follow-up Information only.
This is at Browns Ferry.
Name There has been a General Emergency declared at Browns Ferry affecting:
EI Unit 1 LI Unit 2
--I Unit 3 FII Common The Reactor is II1 Shutdown LI At Power Plant Conditions are LI Stable LI Deteriorating "Follow-Up" Information (e.g, Key Events, Status Changes, Status of any Plant Evacuations)
Current Radiological Conditions are (Check one under both Airborne and Liquid column.)
Airborne Release Offsite..
Liquid.Releases Offsite._....
L] Minor releases within federally approved j] Minor releases within federally approved limits' limits LI Releases above federaly approvedlimits'
[I Releases aboye federally approved limits' LI Release Information not kn'own Release Information not known
('Tech Specs)
("
(Tech Specs)
Additional Rad information: (e.g., relea-se duration)' ?
- , i o The current meteorological conditions from the site are:
Wind Speed
, Wind Diiectibnhfro'm '_;-
The following Protective Action Recommendajioln is-p'ro'vided.
LI Recommendation 1 R
jlecommendation 2 Please repeat the information you have received to ensure accuracy The time for this follow up is Time:
Date:
SIGNATURE:
LAST PAGE PAGE 12 OF 12 REVISION 33 PAGE 12 OF 12 REVISION 33