Text
Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0032 GL 97-02 April 7, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 DOCKETS 50-266 AND 50-301 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 MONTHLY OPERATING REPORTS Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March 2003.
Sincerely, A. J. Cayia Site Vice President KML Attachment cc:
J. D. Loock, PSCW NRC Regional Administrator NRC Resident Inspector NRC Project Manager L94 6590 Nuclear Road
- Two Rivers, Wisconsin 54241 Telephone: 920.755 2321
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-266 Point Beach, Unit 1 4/02/2003 Kim M. Locke 755-6420 REPORTING PERIOD:
March 2003 (Month/Year)
NO.
DATE TYPE DURATION REASON (1)
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING S:
SCHEDULED DOWN (2)
COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain)
I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction
- 4. Continuation E. Operator Training/license Examination F.Administrative
- 5. Other (Explain)
G. Operational Error (Explain) H.Other (Explain)
SUMMARY
Unit I average daily power for the month of March was 5511.2 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC in March:
ii)
OPERATING DATA REPORT DOCKET NO.
50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 04/02/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD March - 2003 1.
2.
DESIGN ELECTRICAL RATING (MWE-NET)
MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 522.0 516.0 MONTH YEAR TO DATE CUMULATIVE 3.
4.
5.
6.
NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS THE GENERATOR WAS ON LINE UNIT RESERVED SHUTDOWN HOURS NET ELECTRICAL ENERGY (MWH) 744.0 744.0 0.0 380,351.5 2,160.0 2,160.0 0.0 1,098,774.5 233,759.4 230,218.5 846.9 106,650,083.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
I It UNIT SHUTDOWNS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-301 Point Beach, Unit 2 4/02/2003 Kim M. Locke 755-6420 REPORTING PERIOD:
March 2003 (Month/Year)
NO.
DATE TYPE DURATION REASON (1)
METHOD OF CAUSE/CORRECTIVE ACTIONS F:
FORCED (HOURS)
SHUTTING S:
SCHEDULED DOWN (2)
COMMENTS N/A N/A N/A N/A N/A N/A (1) Reason A. Equipment Failure (Explain)
B. Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator Training/license Examination F.Administrative G.Operational Error (Explain) H.Other (Explain)
(2) Method I Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram
- 4. Continuation
- 5. Other (Explain)
SUMMARY
Unit 2 average daily power for the month of March was 517.4 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC in March:
A OPERATING DATA REPORT DOCKET NO.
50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 04/02/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD March - 2003 1.
2.
DESIGN ELECTRICAL RATING (MWE-NET)
MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 522.0 518.0 MONTH YEAR TO DATE CUMULATIVE 3.
4.
5.
6.
NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS THE GENERATOR WAS ON LINE UNIT RESERVED SHUTDOWN HOURS NET ELECTRICAL ENERGY (MWH) 744.0 744.0 0.0 384,955.5 2,160.0 2,160.0 0.0 1,109,964.5 227,913.1 224,925.7 302.2 105,897,768.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997